HomeMy WebLinkAboutPine Grove Village - Building 92 - Fire Protection - A Level (2)FLOW HYDRANT'
U�
TEST
HYDRANT
N
"
�v
SITE FLAN
NTS
EXTERIOR
��SEt TS
5PG ¢ I
d�Uir
N¢z
Y 0 L5 2
:
TRERICE NO 600C PRESSURE
WALL
NMI
GAUGE (0-160 PSI), INSTALL
WITH NO. 865 GAUGE COCK.
POTTER MODEL VSR-SF
FIRE DEF --T. CONN
H
FLOW SWITCH.
7
OF A TYPE d SIZE
a
APPROVED BY
W
w
CNK VLV
LOCAL FD
FIRST FLOOR
SUPERVISED
W
BALL VALVE
(TYPICAL)
co
W�
�
P
Dr
711
O
•:
7..
O. VLV
\-3/4"
I K,
DBL CHK VLV
-
ASSEMBLY WATTS
MODEL 0010T
I,/z II FIRE
•'
SERVICE
FOUNDATION
fRI 5ER
DETAIL
NTS
A 0'055 5E CT i ON T RU UNIT "0"
CJ NTS
GENERAL NOTES
r 4All layouts are diagrammatic and final arrangement shall suit field conditions.
1. All work shall be installed in a first-class manner consistent with the best current . y
practices. Items not shown on the Drawing, but which are necessary to make a 1
complete Fire Protection System, shall be Furnished and installed as part of 5. Cutting and patching of masonry, concrete, wood Framing and other parts of
the work under this contract. the structure shall be performed by the General Contractor.
2. All work shall be installed in compliance with NFPA 13R and all governing Codes. (o. All piping shall be CPUC and/or Schedule 40 steel
3. All materials and workmanship shall carry the standard warranty against all defects A Final system test shall be conducted in the presence of the Yarmouth Fire Dept.
for a period not less than one (1) year from the date of acceptance of the work 1.
Any fault due to defective materials, equipment, or workmanship which may develop a. All piping shall be installied on the warm side of the building insulation.
within that period shall be made good, .forthwith, by and at the expense of the
Mechanical Contractor, including any damage done to areas, materials, and other
systems resulting from this failure.
HYDRAULICALLY DESIGNED 5PRIN<LER SYSTEM
NFI=A 13 R %JET SYSTEM"
DESIGN AREA - DWELLING UNIT
NO. OF DESIGN SPRINKLERS - 4
SPRINKLER DEMAND FLOW - 39 GPM
INSIDE NOSE STREAM - 0
OUTSIDE HOSE STREAM - 100 GPM
RESIDUAL PRESSURE REQUIRED 32 PSI
55 SPRINKLERS - VIKING MODEL M-6
155'-1/2, kti3.l, LISTED RESIDENTAL
HYDRANT TEST
TEST DATE - 12/29/98
TEST HYDRANT - 45 PSI 671ATIC
40 PSI RESIDUAL
FLOW HYDRANT - S50 GP" i
AVAILABLE RESIDUAL PRESSURE ' 44 PSI
TEST PERFORMED BY ARP ENGINEERING' INC.
5':, SPRINKLERS, 1/2", 3.1 k, 155'
iNC, t— iODEL 1-I-&
", a
cT �
x
t E -
w
Lo
0
co
coO
�LO
W
N
cc0
NLO
coO
x
Oma
O
ax
U
Q,
aw
rx �
Ww
,�O
Y
CO
�Y
DRAWING TITLE:
FIRE PROTECTION
DRAWN BY:
JP
CHECKED BY:
DAG
DATE:
12/29/98
REVISED:
PROJECT NO.
48227
SHEET
��SEt TS
5PG ¢ I
d�Uir
N¢z
Y 0 L5 2
:
LA
NMI
Lo
0
co
coO
�LO
W
N
cc0
NLO
coO
x
Oma
O
ax
U
Q,
aw
rx �
Ww
,�O
Y
CO
�Y
DRAWING TITLE:
FIRE PROTECTION
DRAWN BY:
JP
CHECKED BY:
DAG
DATE:
12/29/98
REVISED:
PROJECT NO.
48227
SHEET
54
a
H
a
W
w
W
z
w
W
co
W�
�
w
Lo
0
co
coO
�LO
W
N
cc0
NLO
coO
x
Oma
O
ax
U
Q,
aw
rx �
Ww
,�O
Y
CO
�Y
DRAWING TITLE:
FIRE PROTECTION
DRAWN BY:
JP
CHECKED BY:
DAG
DATE:
12/29/98
REVISED:
PROJECT NO.
48227
SHEET