Loading...
HomeMy WebLinkAboutEngineered Plan - 1999BENCHMARK TOP OF FOUNDATION ELEV. _ 10 FT. I (ASSUMED) 2I 4" CAST IRON PIPE PTICH EQUAL) MINPER FTM ELEV ELEV 7 s 4 FEET .14 INCHES 5 FEET 19 INCHES 6 FEET 24 INCHES SEPTIC TANKZONE 8 FEET 34 INCHES .. �.. ., ., .. Z- LAYLK Or 1/8" TO 1/2LEGEND: WASHED STONE VENT EXISTING SPOT ELEVATION OOxO NOT REQUIRED EXISTING CONTOUR ----00---- Z 1 CU. FT. OF FINAL SPOT ELEVATION . WO CONCRETE FINAL CONTOUR 0 ANCHOR SOIL TEST LOCATION FLOW LINE �/ rry °' UTILITY POLE—O- 10" TOWN WATER —W I—N —TMIN. Of�' .} .. o o �, .. o CATCH BASIN ` 9 '.�. 10" o G Z GAS UNE G LEVEL e _ o ELEV — L CLEAN OUT C.O. GAS ELEV. _ 6' SU b ELEV . BAFFLE CESSPOOL C.P..0 DISTRIBUTION f� ELEVq7,1 HIGH CAPACITY INFILTRATORS WITH STONE IN AN (TO BE PLACED ON FIRM BASE) BOX TO BE WATER TESTED '' Z 1 500 GALLON IF MORE THAN ONE OUTLET �(� ro TRENCH FORIAATIDN N�� x> �� Z►�� . f wATER ENcouNTERED AT. a.Ev = SEPTIC TANKZONE (TO BE PLACED ON FIRM BASE) SOIL ABSORPTION wEt.L 3/4" TO 1 1/2' SYSTEM (SAS) INDEX WASHED STONE ADJUST DESIGN CALCULATIONS SEWAGE DISPOSAL SYSTEM PROFILE USGS PROBABLE WATER TABLE ELEV. = OBSERVED WATER TABLE ( / / ) ELEV. = NUMBER OF BEDROOMS GARBAGE DISPOSAL UNIT NO NOT TO SCALE ROTTOU OF TEST FIOLE FtEV_ = c'` 1 TOTAL ESTIMATED FLOW