Loading...
HomeMy WebLinkAboutEngineered Plan - Rev. 20170 V C) - M a m o O �a Q Q Q ± C �• rT o �70o NQ m v N C/-) m �h �� rn N Qn N TI N -a O 7 MORD �I p j O 0 O cn • CD Q a 40' LAYOUT II °o Q o x I+. 00 moo;\� A Cb v 0 N W,.N�B Cb cD rn`T 0 Sn Ca w 7D 0 CL MO _ N)II �vLO o rn C OL -3 rn Z o 00 v V N � D r'1 a o O o C_ ul' OC) M I 000 N II C OD V ! v ( 1 Q CD • D M M O 0 V 0 Ct)D o 0)m M a Cg G7 o O �a Q Q Q ± C o �70o NQ kQ v v N T� V �� rn N Qn MORD �I cn • 40' LAYOUT II °o Q o 00 moo;\� A Cb Cb cD rn`T r w 7D _ N)II �vLO o a ` J 00 v V r'1 a o O Q OC) M N II Q V ! v ( 1 Fri • D M M Q Z IIy m 6 N) o ,. Q m CD _Z: N N /> V/ =rte r � V 0 z 0 Ct)D o 0)m M a L o r p q< a o D r EJ r' co Cg G7 o �a 2 O Ni Note *Erosion control protection measures are to be installed and o 0 o maintained until landscape vegetation's established. **Roof Stormwater Run—off Is To Be Directed a o *** to Gutters, Downspouts, and Drywells. S't i e Grading And Landscaping Is To Gdntain Stormwater Run—off & Prevent Against Stormwater Flowing; Onto Adjacent Properties. k t t Q o fi Q ' Q W r CD bzz �a0C o �a Q Q Q ± C o �70o NQ kQ v v N T� V �� rn N Qn o 98 Puod 013 I k � }S 01+ u �_TJ bzz O O O N Q Q Q ± C �70o NQ N° MORD ;D QN (b✓ONES � ° Q q) N 40' LAYOUT II °o Q o moo;\� A Cb Cb cD A p II II cn -51 1 CD _ N)II �vLO N) v V r'1 a o C N N II W O v �- 10' -1 PROP. T.O.F. 30' --1 1~ 15' —►I ACCESS MANHOLES TO WITHIN 6" OF FINISHED GRADE V110" 7— 14" iddGAS BA 1500 GAL. 11.7 SEPTIC TANK JIT. , a Provide (3) Charcoal 4" Perf. Insp Ports w/ Vent pull cop and lawn cover ® Surface (See Detail) ELEV. 11.6 Min. 3' Max.l 1' Min. cover cover filter fabric or 1/8" to 1/2" double washed 3/4" to 1112 " )uble. washed L ----------I-------- tLtv_Iv.uiELEV. 9.0 1 J7 ELEV. 1 60' olt D—BOX (3) — 60'x3'X1'deep 5.0' H-20 STONE TRENCHES SYSTEM PROFILE Aad ELEV. cW Not to Scale SEPTIC SYSTEM NOTES xr - CONTACT OFFICE (508)-432-2878 A. MINIMUM OF 48 HOURS PRIOR TO START OF PROJECT - EXISTING CESSPOOLS ARE TO BE PUMPED AND FILLED OR REMOVED ALONG WITH ALL CONTAMINg, D $PILS WITHIN 5' OF PROPOSED SAS. - UNSUITABLE SOILS ARE TO BE REMOVED, IF ENCOUNTERED BELOW EL. 10.3, FOR 5'` AROUND THE LEACHWO ``ARIA AND REPLACED WITH TITLE -5 FILL SOIL. r - ALL COMPONENTS ARE TO MEET TITLE 5 MATERIAL & CONSTRUCTION REQUIREMENTS. - SYSTEM COMPONENTS ARE TO BE SET ON A STABLE, COMPACTED BASE. - DISTRIBUTION BOX EXIT LINES ARE TO BE SET LEVEL FOR THE FIRST 2'. - DESIGN ENGINEER IS TO VERIFY SOILS OF ALL SAS EXCAVATIONS BEFORE SYSTEM INSTALLATION -REQUIRED. - DESIGN ENGINEER IS TO VERIFY SYSTEM INSTALLATION (LOCATIONS & ELEVATIONS) PRIOR TO BACKFILLING. - COMPONENTS ARE TO BE WITHIN 3' OF FINISH GRADE & ARE TO HAVE A MINIMUM OF 1' OF SOIL COVER. ACCESS MANHOLES ARE TO BE WITHIN (3"-6") OF FINISHED GRADE ON SEPTIC TANK INLET AND OUTLET COVERS AND DISTRIBUTION BOX COVER. LEACHING AREA INSPECTION PORTS (3) ARE TO BE SET AT GRADE WITH IRRIGATION CONTROL BOX COVERS REQUIRED. - ALL POST CONSTRUCTION LANDSCAPING DETAILS ARE TO BE BETWEEN INSTALLER AND PROPERTY OWNER OR AGENT. GROUNDWATER ADJ. Groundwater Found: Index Well: MIW-29 Zone A (1/16, 8.3')= Adj. High GW Depth E t. 2.3 ELEV. 12.3 > + 1.7' 12.0 E t. 4.0 11.0 8.5 0.3 ELEV. 12.3 12.0 11.3 9.3 0.8 Lawn Box 4" Pull Cap Leaching Perforated Pipe Trench Inside Trench Use min.: 2— 3/8" Holes ® 2" vert.spacing INSP. PORT DETAIL r----------� I Q I TRENCH SECTION DEEP HOLE LOGS DATE. 1/13/16 DEEP OBSERVATION HOLE # I TEST BY: DANIEL CROTEAU TIME. 1:00 01 F"M g HOR. TEXTURE COLOR (MUNELL) SOIL STRUCTU RE MOTTLING CONSISTENCY, OTHER 3" 0 Organic N/A NO 15" A!E Loamy and 10YR 4/2 NO larger grains, white 46" B Loamy - Medium Sand 7.5YR 5/6 NO very friable 144" C Medium to Fine Sand 2.5YR 713 1 GWE @ 120" BOL OF PERC: 34' RATE., < 2 MIN/INCH (24 -GALLONS OF WATER WITH <9' REMAINING AT 9 MIN. 13 SEC.). LOADING RATE 0.74 GPD/SF (CLASS 1) WITNESS: AMY VON HONE, YARMOUTH HEALTH DEPARTMENT. DATE: 1/13/16 DEEP OBSERVATION HOLE # 2 TEST BY: DANIEL CROTEAU TIME: 1:00 E HOR. SURFACE COLOR TEXTURE (MUMS ELL) SOIL MOTTLING CONS STTENCY,OOTHER 3" 0 Organic NIA NO 12" A Loamy Sand IOYR 4/2 NO 36" B Loamy Medium Sand 7.5YR 5/6 NO very liable 138" C Medium to Fine Sand 2.5YR 7/3 GWE @ 120" BOL OF PERC: 36' RATE: < 2 MIN/INCH (24 -GALLONS OF WATER WITH (9' REMAINING AT 15 MINUTES). LOADING RATE 0.74 GPD/SF (CLASS 1) WITNESS: AMY VON HONE, YARMOUTH HEALTH DEPARTMENT. SYSTEM DESIGN Design Flow: 6 bedrooms @ 110 gal/day = 660 gal. Septic Tank: 660 gal. x 200% = 1320 gal. Use: Leaching Facility: Bottom Sides: *Garbage disposal 1500 Gal. Septic Tank (H-10) (3) — 60' x 3' x 1'deep Stone Trenches 3x 60'x 3' _ x 0.74aal/sf = 399 Gal 3x2(60'+3')x1'xO.74gal/sf= 279 Gal Total Capacity= 678 Gal is not permitted with this design. Revision: 4118117