HomeMy WebLinkAbout2017 Jun 22 - Email from Peter McEntee, PE 1
vonHone, Amy
From: PETER MCENTEE <peter.mcentee@gmail.com>
Sent: Thursday, June 22, 2017 9:00 AM
To: vonHone, Amy
Subject: 29 Jefferson Ave
Attachments: 29 Jefferson Ave. SOIL Eval.pdf; 29 Jefferson Ave-Sheet 1 of 3.pdf; 29 Jefferson Ave-
Sheet 2 of 3.pdf; 29 Jefferson Ave-Sheet 3 of 3.pdf
�y,
I'm doing the design on this site and was cross referencing Phils notes with mine. I noticed that he did not
record the redox band observed in TP-1. It was a clear 3" to 4" band with>20% REDOX. I told him that I was
logging it and I thought he acknowledged it. We dug another test hole because Bruce was concerned about that
area having peat. We dug the second hole and it was basically the same as TP-1. I was more concerned with the
peat so I didn't really look for the redox in TP-2. Perc rate in B horizon was 3.3 min/inch. I am hoping to hold
the 31" to GW and request a 1 ft reduction for 3' separation.
Attachments:
Yarmouth Soil Log(marked up)
EW Septic Design '
'
-- ;
Peter T. McEntee PE - Principal
Engineering Works, Inc.
12 West Crossfield Road
Forestdale, MA 02644
�
Tel/fax (508)477-5313 i
i
;
;
�
I
i
i