Loading...
HomeMy WebLinkAbout2017 Jun 22 - Email from Peter McEntee, PE 1 vonHone, Amy From: PETER MCENTEE <peter.mcentee@gmail.com> Sent: Thursday, June 22, 2017 9:00 AM To: vonHone, Amy Subject: 29 Jefferson Ave Attachments: 29 Jefferson Ave. SOIL Eval.pdf; 29 Jefferson Ave-Sheet 1 of 3.pdf; 29 Jefferson Ave- Sheet 2 of 3.pdf; 29 Jefferson Ave-Sheet 3 of 3.pdf �y, I'm doing the design on this site and was cross referencing Phils notes with mine. I noticed that he did not record the redox band observed in TP-1. It was a clear 3" to 4" band with>20% REDOX. I told him that I was logging it and I thought he acknowledged it. We dug another test hole because Bruce was concerned about that area having peat. We dug the second hole and it was basically the same as TP-1. I was more concerned with the peat so I didn't really look for the redox in TP-2. Perc rate in B horizon was 3.3 min/inch. I am hoping to hold the 31" to GW and request a 1 ft reduction for 3' separation. Attachments: Yarmouth Soil Log(marked up) EW Septic Design ' ' -- ; Peter T. McEntee PE - Principal Engineering Works, Inc. 12 West Crossfield Road Forestdale, MA 02644 � Tel/fax (508)477-5313 i i ; ; � I i i