Loading...
HomeMy WebLinkAbout2012 - Engineered Plan, Review Checklist - VOIDED � , �U, �,� �� TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST ' Location: A.M. 2� Lot �6' Z Zone of Contribution: In Out�Acrea.ge , Commercial: Residential:� - Street: Village: !�'� Floor Plan: � #Bedrooms: , Owner: � - ��' � D'are� / I.IGv � Installer: '� Address: Phone: �' Phone: Builder: Eng eer: � �'� � Address: Pho : Phone: �' ���z ' �^F'��r Q`/ � CuC i° � N/A NO � ; 1.Re uired#of copies received � 2.Date of soils exam and ercolation test not ol than 2 years i�-" 3. 4-5 ft of natural occurrin ervious ma ' water table � 4.Foundation 2 ft above hi point of roa Fnd: Var.: 5. Water line 10 ft from s tic com onen Var.: �/' 6.Benchmark indicated and shown-NG if near wetlands 7. Se tic tank minimum 10 ft from foun tion, deck Var.: 8.Leaching minimum 20 ft full, 15 ft cra 1, 10 ft slab Var.: 9.Leaching minimum 100 ft from wetlan Var.: 10.Leaching minimum 150 ft from drinkin we1U25 ' i ation well Var.: 11.Tank/leachin minimum 10 ft from ro erly line V .• 12. S stem meets all other setback re nts Var.: t_f 13.Uses adjustment for maximum hi oun ater Var.: �' 14.Leaching set 4-5 ft above adj.water bottom b�test hole Var.: e�' 15. System not in top or subsoil(A,B hor' ns)or 5're�3nQval 16.Pro osed contours are suitable 17. S stem meets slo e r uirements-min. 1/ " '/<" eferred 18. System meets breakout r uirements PVC liner: all: ,�/ 19. Specified tee sizes are proper, gas baffle on outlet 20. Sewage is under 10,000 gpd for arcel 21.No arba. e dis osal 22.S stem ade ua.tel sized for its intended use 23.Minimum 6"stone or com acted below tank and dbox 24.Manhole covers within 6"of grade, ump cha.mber cover to grade L f 25.Ins ection ort on plastic chambers/leach field L/ 26.Electrical ermit for um chamber/Se arat meter fo du 1 es �� 27.Pum system-2" line,weep hole,check valv ' dbo size`- - � 28. S tic tank/ um chamber to be factory wat 29.Vent provided if leaching below 3 feet,under driveway/ arkin 30.Buoyancy calculations for tank/pump chamber 31.En ' eer to ins ect and certi soils: �vvall: commercial: 32.Engineer/Registered Sanitarian and Land Surveyor stam s/signature � 33.H-201oading is sub'ect to vehicular traffic, oundwater 34.Title V A plication and ermit fee, insta.11er signature 35.Foundation footing min. 2 feet above adjusted ound water for new house 36.Deed Restriction re uired max. #bedrooms: max. flow: d 37.Check area lots for groundwater/Label groundwater in Assessor's Ma : Plan reviewed by: I� �o3io3 i { f 18" OR 24" CAST IRON COVER WITH RISER 6 COVER TO GRADE LEVEL BELOW GRADE I h �7 99.02 98.5 EL p 97.86 0 t 93.35 10" TEE 14" TEE & FILTER TO B E 1500 GALLON H-10 SEPTIC TANK 97.61 1 11 H2O PUMP CHAMBE WATER ROOFED 6' X 81" WITH A 2 PEr1NG 26" CAST IRON COVER JUNCTION BOX TO GRADE (ALL ELECTRICAI CONNECTIONS F( HOISTING CABLE PUMPS AND FLOA 99.21 TO BE MADE INSIE 6" Crushed Stone OR Compacted Base Bouvance Calculations for H-10 Septic Tank Uplift: (96.65-93.35) X 10.5' x 5.67' X 62.4 LBS/CUFT =12,260 LBS. Septic Tank Weight: = 11,480 lbs Soil Weight: .75' H X (10.5' x 5.67') X 62.4 lbs/cuft = 2,786 lbs TotalWeight: = 14,266 lbs NOTES 1. Pump out and fill in existing cesspools. 0. Retaining wall with a 40ml 00 liner along the inside of the wall. "'97.46 ALARM ON 94.62 3" 3/8 " BLEEDER PUMP ON HOLE LO *-I- PUMP 171' ' 16" r. �. r.c -•�: • _ 92.46 Sewer Ejection Pump Notes: 1. 4/10 A 4/10 sewer ejection pump is to be used. 2. Install floats in such a manner that they are accessible from the manhole. 3. A 3 Float system with alarm floated off a stainless steel bracket. 4.Electrical work is to be completed underpermit by a licensed electrician. 5. Alarm and pump must be powered from seperate circuits. f4 6' �I Bouyance Calculations for H-20 Pump Chamber 650 GALLON H-20 PUMP CHAMBER = 11,492 LBS. Uplift: (96.65-92.46) X (2.5' x 3.141) X 62.4 LBS/CUFIT =2,053 LBS. 1 N Maine Ave 34 1 V 5 TEST HOLE LOG DATE: 8-21-12 I TEST BY: Michael O'Loughlin S.E. WITNESSED BY: Amy Von Hone PERC RATE < 2 MIN PER INCH TEST HOLE # 1 TES Fill AP LOAMY SAND 10YR 2/1 34" WATER 95.33 C MEDIUM SAND 10YR 4/1 TEST HOLE # 3 AP LOAMY SAND 10YR 3/1 BW LOAMY SAND 10YR 5/8 16" perc 95.33 I,> 1.3' ADGW 96,63 54" WATER 95,33 C 1 MEDIUM SAND 2.5Y 7/3 COVER WITH RISER WITHIN 6' OFI FINAL GRADE PIPE TO BE LEVEL FOR 2' OUT OF D -BOX / f '102.01 102.18 H-20 D -BOX 6" Crushed Stone OR Compacted Base Storage Calculations for H-20 Pump Chamber DESIGN FLOW: 330 GPD DOSING REQUIRED: 4 CYCLES/DAY (SAND) 330 : 4 = 82.50 GALLONS/CYCLE STORAGE PROVIDED INV (IN) EL 97.46' PUMP ON EL 94.37' DIFFERENCE = 3.09' V= 3.141 X 5 X 3.09' = 48.53 C U/FT 48.53 CU/FT X 7.5 GAL/CU-FT = 364 GALLONS 98.17 EL 0„ 99.0 EL I AP LOAMY SAND_ __ ... 10YR 3/1 95.75 EL 9" 98.25 EL LOAMY SAND BW 10YR 5/8 28" 96.67 EL 95.34 EL I 44" WATER 95.33 C1 (, MEDIUM SAND 2.5Y 6/4 93.67 EL 48" 95.0 EL 99.83 EL 99.25 EL 98.33 EL 95.16 EL 7' Ground water observed @ EL 95.33 Well #MIW-29, 2012-07-25, Zone A, Adj= 2.3' Variance of 1' for GW Adj. granted from Health Dept. making the � GW Ad 1.3'. Adj. Ground Water O EL. 96.63 2-0 !I RETAINING WALL SPECIFICATIONS 10t�.0 `I TOP OF WALL TOP OF LINER 103.0 EL 409L 'L NER 106 0 02.0%EL " BOTTOM OF WALL j99.5 EL l ( BOTTOM OF _ (at lowest point) 40 ML. LINER 98.0 EL 6" STONE I Cb * MATERIAL FOR WALL TO BE DECIDED BY OWNER S 101.9 - (INLET) -� 9-Cultex Contactor C4 Field Drain H-10 Cultec Units (No Stone) 12' x 24' ,,�--7. f 7"70 / DESIGN CRITERIA NUMBER OF BEDROOMS: 3 BEDROOMS SOIL TEXTURAL CLASS: CLASS 1 (.74) DESIGN PERCOLATION RATE: < 5 MIN/IN GARBAGE GRINDER: NO LEACHING AREA REQUIRED 330/.74 = 445.9 SF SEPTIC TANK: 330 GPD X 200% = 660 GALLONS USE 1500 GALLON PROPOSED D -BOX: 6DB H-20 USE 9) Cultec Contactor C4 Field Drain Units (48" x 96" x 8.5") 12' x 24'_ Bed Configuration, without stone. BOTTOM AREA: (GENERAL USE APPROVAL FOR 6.7 SF/LF FOR BED CONFIGURATION) SF Needed: 330/.74 = 446 SF 446/6.7 = 66.57 LF 67 LF / 8' = 8.38 Units Required USE: 9 UNITS 9 UNITS X 8' If/unit X 6.7 sq/ft X .74 = 357 GPD Al,-: N Q LI: Final Grade Q 103.11 P @ 102.36 OTTOM 0 101.65 EL 6.6>5 EL A. G. W. 95.35 EL Ground Water Floor Plans (NTS) bed den Y a= t 2 bed bath utilities bath living storage 1st Floor porch Basement GENERAL NOTES 1. CONTRACTOR TO BE RESPONSIBLE FOR THE LOCATION .OF-ALL-UTIUTIES„_QBOVE & UNDERGROUND, PRIOR TO ANY EXCAVATION OR--CONSX_RUCTION. 2. SEPTIC SYSTEM IS TO BE IN LLED IN COMPLIANCE WITH 310 CMR 15.00:1ITLE V. 3. PROPER CMR LINE INFORMATION IS ONL APPROXIMATE. THIS PLAN IS T BE USED FOR SEPTIC SYSTEMXPGRADE. 4. DESIGNE TO INSPECT & CERTIFY OVER-\ DIG, WHEN EQUIRED BY PLAN, AND FINAL INSPECTION BEFORE BACKFILL. 5. CONTRA TOR TO PROVIDE 48 HOUR NOTIC FOR ANY REQUIRED I SPECTIONS. 6. THIS SYSTEM IS NOT DESIGNED FOR THE E OF A GARBAGE DISPOSAL. 7. THE TOP OF ALL SYSTEM COMPONENTS SHALL BE MARKED WITH MAGNETIC MARKING TAPE OR A COMPARABLE MEANS IN QRDER TO LOCATE THEM ONCE BURIED, 1 8, IF SOILS !!}}R FOUND UNSUITABLE ORSDIFFERING FROM THOSE FUND IN SO)LkLOG CONTACT DESIGNT AND THE BOARD OF HEALTH. 9. F UNSUITAAAAAABLE MATERIAL IS FOUND' IN THE PRIMARY OR THE RESERVE OF 11THE\S.A.S. AN OVERDI REQUIRING CLEAN t� GRANULAR SND tAEET1NG 310CMR 5.255(3) SHOULD BE USED AS FI L MA RIAL, 5' AROUND AND UNDER S.A.S.. 10. A 4" PPE CONNECTION AT SEPTIC TANK AND D -BOX SHALL BE MO TAREf� IN PLACE. IF USING 18" PLASTIC RISER PIPES, THESE T00 iHALL BE MORZARED IN PLACE. a SEWAGE PLAN BLOC ATION: 49 .Maine Ave, W. Yarmou h, MA l PREPARED FOR: Joan Ellsworth SC ALE,' 1" = 20' ,,MAP. -./22 PARCEL: 363 SHEET NUM ER: DATE: 9-19-12 REVISION: \ J.IO'LOUGHLIN INC. 714 MAIN STREET YARMOUTH PORT MA 02675 MARYB ETH MC KENZIE REGISTERED SANITARIAN (508) 362-4942 a ') r 7 VA4