HomeMy WebLinkAboutEngineer Certification Letter SWEETSER ENGINEERING '
203 SETUCKET ROAD-P.O.BOX 773—SOUTH DENNIS-MASSACHUSETTS 02660
TEL(508) 385-6900 E-Mail SweetserEna(dlaol.com FAX(508)385-6991
LAND SURVEYlNG - ENGINEERING - TITLE 5 SEP71C SYSTEMS
August 14,2017 ;
Bruce Muzphy
Yarmouth Health Department
1146 Main Street ;
South Yarmouth,MA 02664
RE: Septic system @ 12 Bliscott Avenue, South Yarmouth
Our File# 7890-OQ
Dear Bruce,
Pve made several inspections of the septic system being installed at the above property over the
weekend.
1. Frida.y evening,August 1 l,2017,I made an onsite visit to the above address and '
witnessed the wateriine was sleeved prior to backfilling.
2. Saturday,August 12,2017, I was called to inspect the over-dig which appeared to be
done in accordance with the plan.
3. Sunday,August 13,2017,I made a visual fmal inspection of the installation of the septic '
system at the above address and took the pictures attached to this letter.
As a result of nny inspections, I find the system appears to be installed in accordance with the
approved plan, with the following notations:
A. Piping from the tank to the leaching facility is slightly different than shown on the
approved plan.
B. The system needs to be carefully backfilled and graded.
If you have any questions,please contact
�,�„'tN Of��f,ySS,9°:
Very t o , `� RQBIN �'y�s
„/) WILLIAM ��;
/ /C�/ WiL� ,,�
t�./ �'�'
� . 3
� 9 rZ j
� F n ;��.ti�
Robin W. Wilcox,PLS� FiS;s�n�'�S T F R��:i%�'
Licensed Septic Inspector '�Q� �a�r�;,r:'�
�
Enclosure: Pictures
i