Loading...
HomeMy WebLinkAboutEngineered Plan - 2017TOP OF FOUNDATION EL. 62.0' EL. 57.0' 4" CAST IRON or EQUIVALENT MIN. PITCH 1/4" PER FOOT � •f DATUM: ASSUMED) FLOW LINE 14" SEPTIC SYSTEM PROFILE (not to scale) INSP. POF 2" of,' to?�" DOUBLE WASHED PEAS'TONr-OR GEOTEXTILE EL. 58.0:EFILTER FABRIC --r- " SCHEDULE —.--,-- r tj 0.5' CRUSHED STONE OR 1000 GALLON SEPTIC TANK MECHANICAL COMPACTION (EXISTING) (first 216 be level) —s'(1%) " OF Flaherty Environmental Services D P.O. BOX 89 Yarmouth Port, MA 02675 774.994.1166 opo�oDo�O- �O�O�O •o G . GOOOOOC O O O (D -BOX) Li SOIL ABSORPTION SYSTEM (2) 500 GALLON H-20 CHAMBERS �" to 12 DOUBLE WASHED S/ONE WITH 4' STONE AROUND IN A 12.83'W X 25.0'L X 2'D CONFIGURATION BOTTOM OF TEST HOLE EL 48.0' USGS ADJUSTMENT: N/A GROUNDWATER ELEV• N/A 0"k 10' 58 qN OFsggO EDWARD yGn A. STONE N SCALE: 1" = 30' REF, PB 167 PG 149 2.0' IF REOUIRED 4' EL. 48.0- N TH LOCATIONMAP I Rt, 6A - NTSCN1or'iy�i�� 1 D - Y0 1 a rG�STER� 4 NI TA k DATE,' 7130/2017 REVISED: SITE AND SEWAGE PLAN FOR B & B EXCAVATrON, INC./ RICHARD C. GREEN 80 WHITE ROCK ROAD YARMOUTH PORT, MA PAGE 1 OF2 GENERAL NOTES 1, ALL PRECAST COMPONENTS TO BE H-10 RATED. ALL COMPONENTS WITH ANY ANTICIPATED VEHICULAR TRAFFIC TO BE H-20 RATED. 2. THE DESIGN OF THIS SYSTEM DOES NOT ALLOW FOR THE USE OFA GARBAGE GRINDER. 3. MUNICIPAL WATER IS AVAILABLE. 4. ALL CONSTRUCTION TO CONFORM WITH 310 CMR 15.000 AND ALL OTHER APPLICABLE LOCAL, STATE AND FEDERAL CODES AND REGULATIONS, 5. INSTALLER/CONTRACTOR TO REVIEW & VERIFY ALL ELEVATIONS AND DETAILS AND REPORT ANY DISCREPANCIES TO DESIGNER PRIOR TO CONSTRUCTION OR ASSUME ALL RESPONSIBILITY, 6. INSTALLER/ CONTRACTOR IS RESPONSIBLE FOR MAINTAINING SAFE WORK AREA, VERIFYING ALL UTILITIES AND NOTIFYING "DIG SAFE" (1-888-344-7233) 72 HOURS PRIOR TO CONSTRUCTION, 7. ANY CHANGES TO OR DEVIATIONS FROM THIS PLAN MUST BE APPROVED IN WRITING BY FLAHERTY ENVIRONMENTAL SERVICES AND LOCAL BOARD OF HEALTH. 8. FINISH COVER OVER COMPONENTS IS NOT TO EXCEED 3' PER 310 CMR 15.000 UNLESS SHOWN PER PLAN. 9, ALL ABANDONED SEPTIC SYSTEM COMPONENTS TO BE PUMPED DRY AND FILLED WITH CLEAN SAND OR REMOVED AND REPLACED WITH CLEAN SAND. 10.ALL COMPONENTS TO BE PROVIDED WITH WATERTIGHT ACCESS PORTS WITHIN 6" OF FINISH GRADE. 11.ALL SEPTIC TANKS, DISTRIBUTION BOXES AND PIPING TO BE INSTALLED WATERTIGHT, 12. NO KNOWN WETLANDS OR WELLS WITHIN 100 FEET OF PROPOSED LEACHING. 13. THIS IS NOT A CERTIFIED PLOT PLAN AND UNDER NO CIRCUMSTANCES IS THIS PLAN TO BE USED FOR ZONING OR BUILDING PURPOSES. 14. LOT IS SHOWN AS ASSESSOR'S PROPERTY MAP 115 PARCEL 224, 15. LOCUS PROPERTY IS LOCATED WITHIN AN AQUIFER PROTECTION DISTRICT (ZONE II). DESIGN CAL COLA TIONS SYS TEM DETAIL Flaherty Environmental Services P. 0. Box 81 Yarmouth Port, MA 02675 NUMBER OFACTUAL BEDROOMS 2 774.994.9 166 GARBAGE DISPOSAL UNIT NO TOTAL ESTIMATED FLOW (110 GAUBR/DAYX 3 BR) 330 GAL✓DAY REQUIRED SEPTIC TANK CAPACITY 660 GAL. SIZE OF SEPTIC TANK 1000 GAL. (EXISTING) SOIL CLASSIFICATION _1 DESIGN PERCOLATION RATE <2 MIMANCH EFFLUENT LOADING RATE 0.74 GALADAY/FT2 O O 12,83' LEACHING AREA (2)x(25'+12.839(29 = 151 SF 25'x 12.83' 321 SF 25' —� 472 SFx 0.74 = 349 GPD USE (2) 500 GALLON H-20 CHAMBERS WITH 4' STONE AS DIAGRAMMED INA 12.83'X25.0'X 2'CONFIGURATION RESERVE LEACHING CAPACITY N/A SOIL EVAL UA TION TEST HOLE#1 Evaluator David D. Flaherty Jr., RS, REHS SE#2755 BOH Witness: Phil Renaud Date. July26, 2017 TH-1 ELEV. 58.0' O"- 12- 12'- 27" 2"12"-27" 27--54- 64% 7"-54"54"- 120- G. W. ELEV. N/A BOTTOM TH-1 ELEV. 48.0' FILL AIE LS 10YR 3/1 B LS 10YR 5/6 C MS 2.5Y616 PERC P/ease Note: The perc test was performed within the "B"and "C"horizons. l certify that on November 12, 2002, /have passed the examination approved by the Department of Environmental Protection and that the above analysis has been performed by me consistent with the required training, expertise, and experience described In 310 CMR 15.018(2)." (NTS) y,�yZN OF Atqq. �0 DAVID c� F;R. "ySTEi" TARj 3� SITE AND SEWAGE PLAN FOR B & B EXCAVATION, INC./ RICHARD C. GREEN 80 WHITE ROCK ROAD YARMOUTH PORT, MA I I I PAGE2OF2 I