Loading...
HomeMy WebLinkAboutApp-Permit-Compliancei ;P -2 - arc No. FEE So COMMONWEALT14 Of MASSACHUSETTS Board of Health, /�/ MA. APPLICATION FOP, DISPOSAL SYSTEM CONSTRUCTION PERMIT Application for a Permit to Construct( ) Repair(*pgradeO Abandon( ❑ Complete System �dividual Components Location 70 U/#/TZ oC+ k- &I "�,j X Owner's Name 'I O Ae 6f R F- T A/ Map/Parcel# Sy Address Q (,v /��%�`£ G CA, 12i� Lot# Telephone# jd $ V31 -�L O F3 Installer's Name (` 14 p c o Designer's Name Address 3 50 s 1- w v �X- Address Telephone# 15-01, ?9r g ro o Telephone# Type of Building / Dwelling - No. of Bedrooms _ Other - Type of Building Other Fixtures Design Flow (min. required) Plan: Date Title Description of Soil (s) _ Soil Evaluator Form No. gpd Calculated design flow Number of sheets DESCRIPTION OF REPAIRS OR ALTERATIONS Name of Soil Evaluator Lot Size sq. ft. Garbage grinder ( ) No. of persons Showers ( ), Cafeteria ( ) Design flow provided gpd Revision Date Date of Evaluation /t F pJ-!¢ C 5, `J7 do, The undersigned agrees to install the above described Individual Sewage Disposal System in accordance with the provisions of TITLE 5 and further agree n not to place the system ' operation until a Certificate of Compliance has been issued by the Board of Health. Signed A Date Inspections 1 N,4; 11 L FEE Board of Health, / f J MA. , CERTIFICATE Of COMPLIANCE Description of Work: 0'rndividual Component(s) ❑ Complete System The undersigned hereby certify that the Sewage Disposal System; Constructed ( ), Repaired ( ),TJpgraded ( ), Abandoned ( ) by: -A �a Pgp(, at T-, Q W. 41 %L / Q has been installed in accordance with the provisiorp of 310 CMR 15.00 (Title 5) and the approved design plans/as-built plans relating to application No. �s�� dated to / Y (c Approved Design Flow (gpd) Installer C b !✓� �% Designer: Inspector: t' r e't / w3 h Date: 7 The issuance of this permit shall not be construed as a guarantee that the system will function as designed. No. `� 0� FEE COMMONWEALTH Of MASSAC14USETTS Board of Health, -Ywx MA. t DISPOSAL SYSTEM CONSTRUCTION PERMIT Permission is hereby granted to; Construct( ) Repair (&''Upgrade ( ) Abandon ( ) an individual sewage disposal system at FO 1* #11-1 /' oC 64"as described in th application for Disposal System Construction Permit No.G?�/ `�C- dated /1"1 -I?? �( (/1 Provided: Construction shall be completed within three years of the date of this permit. All local conditions must be met. Form 1255 Rev. 5/96 A.M. Sulkin Co. Boston, MA Date/011 &/C? Board of Heal v