Loading...
HomeMy WebLinkAboutReview Checklisti � � �� � � � � TOWN OF YARMOUTH � - SEWAGE PLAN REVIEW CHECKLIST✓�'��fl���� � ���� Location: A.M. ��`7 Lot_1�1� Zone of Contribution: In C�0"ut Acreage � ��� � Commercial: Residentia1:-��� Street: Village: Floor Plan: #Bedrooms:� Owner: �"(�. Installer: � Address: Phone: - „�_- � Phone: Builder: Engineer: �`� Address: Phone: --> � -� Phone: _ �'?� 4� ��'- C�:� N/A YES O 1.Required#of co ies received 2.Date of soils exam and percolation test not older than 2 years 3.4-5 ft of naturall occurrin ervious material, above water table 4.Foundation 2 ft above high oint of road H.P.: Fnd: Var.: 5.Water line 10 ft from septic components Var.: 6.Benchmark indicated and shown-NGVD if near wetlands L/ 7. S tic tank minimum 10 ft from foundation, deck Var.: ��' 8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: t:/� 9.Leaching minimum 100 ft from wetlands Var.: . 10.Leaching minimum 150 ft from drinking we1U25 ft irrigation well Var.: t�r� 11.Tank/leaching minimum 10 ft from property line Var.: ' 12. S stem meets all other setback r uirements Var.: 13.Uses ad'ustment for ma�mum high groundwater Var.: • 14.Leaching set 4-5 ft above adj.water or bottom of test hole Var.: L� 15. System not in to or subsoil(A,B horizons)or 5'removal ✓ 16.Pro osed contours are suitable 17. S stem meets slo e r uirements-min. 1/8", 1/4" referred 18. S stem meets breakout requirements PVC liner: Wall: �i-� 19. S ecified tee sizes are proper, gas baffle on outlet tee 20. Sewa e is under 10,000 d for parcel �.. 21.No garbage dis osal ; • 22. S stem ad uatel sized for its intended use �„i�' 23.Minimum 6"stone or com acted below tank and dbox 24.Manhole covers within 6"of grade, um chamber cover to grade �,�- ` 25.Inspection ort on plastic chambers/leach field �� 26.Electrical ermit for um chamber/S arate meter for du lexes 27.Pum system-2" line,wee hole,check valve,tee in dbo�pum size �..-� 28. Septic tank/ ump chamber to be factory waterproofed 29.Vent rovided if leaching below 3 feet, under driveway/ arking �� 30.Buoyancy calculations for tank/ um cha.mber 3 L En ' eer to ins ect and cert' soils: wall: commercial: 32.Engineer/Registered Sanitarian and Land Surveyor stam s/signature 33.H-20 loading is subject to vehicular traffic, groundwater �� 34.Title V A lication and ermit fee, installer signature '. 35.Foundation footing min. 2 feet above ad'usted ound water for new house L/' : 36.Deed Restriction r uired max. #bedrooms: max. flow: d 37.Check area lots for groundwater/Label groundwater in Assessor's Ma Plan reviewed by: �`� sio3io3 I ' � i