Loading...
HomeMy WebLinkAboutEngineered Plans - 2017N S 2°4328„ S2• oo' E LOT 23 Plan Bk 304 Pg 6 0114j 34,340 SFt r7 Existing Swimming Pool Existing / House R�i- TOF ® EI 59.2 20' WIDE Cor 1 For UTILITY / EASEMENT 2 AS SHOWN ON < PLAN BOOK 550 PAGE 12 54.0 53.9 c \53.9,,- Paved 7 �e \ 53 •... Parking............. \ \ 52.9 •••• rExist. rS S~ \ 50 •.. 9 \ 9 Limit \ \ \ 507'......51"6 �. •..... 49.6..... S�„,e ef, \ avetfo 46. 4 \ ..... /. •D ive Permit valid for RF.PAttt OF SF11 FIC SVS' ONLY dne to State and I oval septic variant Board of 1jeatth.review and ;yproval is required for any,; future add itions/reito%ationVaIterations to 4 Sewage facilities and/or structures/dwelling. \ G S 6322, lg oo, F l _ s vr;:.47. SAS CONSTRUCTION DETAIL 500 GAL. I s LEACHING CHAMBER T w e Cl cy STONE I T4' 0 1 3 12.8'1 O O Ciser O I 4.8' I STONE I 4' LOCUS 1. ' ' ' Dennis Pond Muter Pond 4�e jlie 42' LOCATION MAP 58.2 57 56 53�K7G' �7 Ole Assessors Map 113 55 5462 Parcel 7 58.1:` 5 .55172 Deed: Bk.23327, Pg.39 Plan: Bk.304, Pg.6 Qo 58.2 n^` // : 51 /�C��'d'� Lot 23 �°7. Ch SYSTEM DESIGN 7.7 571. y / ............ 5 up/.. :' Q Design Flow: 5 bedrooms @ 110 gal/day = 550 gal. 56.3 ..••• frydr% /.. Septic Tank: 550 gal. x 200% = 1 100 gal. 5:. y� Use 1500 Gal. Tank 51 Leaching Facility: 12.8 x42 x2 d Chamber and Stone SAS Cleaner Bottom: 12.8'x 42' x 0.74 Gal/sf= 397 Gal �..... t..�%.... o/ /a :: j L fSides: (12.8'+42'.)x2'x2x0.74Gal/sf=162 Gal �� ,� TOTAL = 559 Gal o V.., Note: Note: Garbage disposal is not permitted with this design. ..�.... ...........r / O ✓ 4 0' �9 50 ut- OF BENCH MARKoDANIELs9cy MICHAEL9csc \ ® Survey nail P. G�� Paved /•• 49 EI. 5Q.0 o CROTEAU v LADUE lnstdll.• "DYlve' CIVIL a I"Pia i 'SAS '• \ � No. 46253 4 N0.37560 Vo Vent 3V�V, N �C/STS R�.N� sto 48 HEALTH DEPT Y,atrmo.uth 1161kb Departttnent \mad� r 45.5APROVL a'1•� .I 47 / \ \ ✓ 46 \4 \��''• .445 MaRAN ENGINEERING ASSOC.,LLC 508-432-2878 941 MAIN STREET (RTE 28), HARWICH, MA SEPTIC SYSTEM DESIGN PLAN IN YARMOUTH Prepared For: Henry Tufts 75 SUMMER STREET YARMOUTH PORT MA Sh t. I O f2 PROJECT: 16-264 1 SCALE: 1 "= 30'DA TE: 318177 T. 0. F. 55'f -� ELEV. 59.2 s- ELEV. ti ELEV. 46.6 4" Dome �- 9' -►� 22' max --� Charcoal Vent Covers Within 6" Access Cast Iron Frame & Covers of Grade Grade *MAINTAIN 6' MAX. COVER BETWEEN �1 TOP OF SAS AND FINISH GRADE Vi 0" - 14" 1500 GAL. SEPTIC TANK H-20 ELEV. GAS BAFFLE D—BOX H-20 SYSTEM PROFILE Not to Scale TEST HOLE 7 D. 45.5 Elev. I De th Horizon Texture Color 45.0 0-6" 0 Organic LEACHING AREA 6-10" A LOGMY Sand 10YR21 44.7 �Z�iOFPr�1 – SYSTEM COMPONENTS ARE TO BE SET ON A STABLE, COMPACTED BASE. – DISTRIBUTION BOX EXIT LINES ARE TO BE SET LEVEL FOR THE FIRST 2'. 10-24 10-30" B Loamy Sand 10YR5/8 43.0— 3.030-72" THE SEPTIC TANK AND AT GRADE ON THE DIST. BOX AND LEACH AREA. No.46253 Basement STISR�O� �SS�OiVAL EAG EXISTING FLOOR 24-48" JO– 72" C1 Loamy Sand 2.5YR5/4 39.5 48-120"C2 Medium Coarse Sand 10YR5/6 72 -132T -C2 Medium Sand 10YR5/6 6' MAX. COVER filter fabric or 1/8" to 1/2" double washed stone 314- to 1112" double washed stone � c oae- J o v o c c-eae-tJ o 0 0 0 � 000 ococ �0000000000 � 00 i000e000 000c o00000000o I � 00000 00000c 00 0 0 0000 0 0 � �------------- ELEV. 43.3 4'ends a 4-500 Gal Chambers �4'ends �4'sides 34 DO4'sides I 8.8' 12.8 x 42 x 2 Deep 500 Gal. Chamber & Stone B ELEV. 34.5 Btm. TH H-20 LEACHING FACILITY TEST HOLE 2 El. 50.2 Elev. Dejoth Horizon Texture Color 49.7 0-6" 0 Or onic LEACHING AREA 49.4 6-10" A Loamy Sand 10YR2 1 �Z�iOFPr�1 – SYSTEM COMPONENTS ARE TO BE SET ON A STABLE, COMPACTED BASE. – DISTRIBUTION BOX EXIT LINES ARE TO BE SET LEVEL FOR THE FIRST 2'. 10-24 B Loamy Sand 10YR5/8 48.2 GRADE ON THE SEPTIC TANK AND AT GRADE ON THE DIST. BOX AND LEACH AREA. No.46253 Basement STISR�O� �SS�OiVAL EAG EXISTING FLOOR 24-48" C1 Loamy Sand 2.5YR5/4 46.2 48-120"C2 Medium Coarse Sand 10YR5/6 Btm El. 34.5 No Groundwater Found Btm El. 40.2 No Groundwater Found Percolation rate: <2 min/inch @ 84" Percolation rate: <2 min/inch @ 84" Soil Test Date: 3/17/99, Performed By: Richard Learned, SE, Witness: Amy VonHone, HA SEPTIC SYSTEM NOTES 1 ST – CONTACT DESIGN ENGINEERING OFFICE (508)-432-2878 PRIOR TO START OF PROJECT – EXISTING SEWER ELEVATION IS TO BE VERIFIED PRIOR TO THE INSTALLATION OF NEW SYSTEM COMPONENTS. – INSTALL 4" PVC CLEAN OUTS TO GRADE BETWEEN DWELLING AND PROPOSED SEPTIC TANK AS SHOWN. – EXISTING 1500 GALLON SEPTIC TANK IS TO BE PUMPED, RUPTURED & SAND FILLED. PUMP & REMOVE EXISTING LEACHING AREA AND CONTAMINATED SOILS WITHIN 5' OF PROPOSED SAS. – UNSUITABLE SOILS ARE TO BE REMOVED BELOW AND FOR 5' AROUND THE LEACHING AREA AND REPLACED WITH TITLE -5 FILL SOIL. – ALL COMPONENTS ARE TO MEET TITLE 5 MATERIAL & CONSTRUCTION REQUIREMENTS. �Z�iOFPr�1 – SYSTEM COMPONENTS ARE TO BE SET ON A STABLE, COMPACTED BASE. – DISTRIBUTION BOX EXIT LINES ARE TO BE SET LEVEL FOR THE FIRST 2'. – DESIGN ENGINEER IS TO VERIFY SOILS OF ALL SAS EXCAVATIONS BEFORE SYSTEM INSTALLATION. P – DESIGN ENGINEER IS TO VERIFY SYSTEM INSTALLATION (LOCATIONS & ELEVATIONS) PRIOR TO BACKFILLING. – COMPONENTS ARE TO BE H2O and WITHIN 6' OF FINISH GRADE. ACCESS COVERS ARE TO BE WITHIN 6" OF FINISHED GRADE ON THE SEPTIC TANK AND AT GRADE ON THE DIST. BOX AND LEACH AREA. No.46253 s� 0 O� cq9� Bedrm 9� c Bath Bedrm Bedrm Bedrm Bath 2nd FLOOR Garage Rm c/ B th off i e TV Rm Dining Rm Living Rm Sh t: 20 f2 1 ST FLOOR trB �Z�iOFPr�1 DANIEL C � P a GROTE:AU CIVIL CP Bath No.46253 Basement STISR�O� �SS�OiVAL EAG EXISTING FLOOR LAYOUT Sh t: 20 f2