Loading...
HomeMy WebLinkAboutEngineered Plan - 1995BENCHMARK TOP OF FOUNDATION ELEV. = (ASSUMED) 10 FT. MINIMUM j 4" CAST IRON PIPE IPITCH ° /4) PER IFT. ELEV. = 7, 7 /ExisT>�jsJ ELEV. 20 FT. MINIMUM SOIL TEST DATE OF SOIL TEST ; " SOIL TEST DONE BY WITNESSED BY OBSERVATION HOLE 1 ELEV.= OBSERVATION ' HOLE , 2 ELEV.= PERCOLATION RATE MIN./INCH AT INCHES PERCOLATION RATE MIN./INCH AT INCHES CLEAN SAND CONCRETE COVERS 4" SCHEDULE 40 PVC PIPE MIN. PITCH 1/8" PER FT. 2' LhYER OF 1/8- TO 1/2- 6" A 6" MA WASHED STONE VENT 6" NOT REQUIRED Z 1 CU. FT. OF CONCRETE FLOW LINE all ANCHOR 10" -THIN. 19" T l 7 2.0. °° o o m o 0 0 0 �; o CrR : ELEV. = LEVEL 6" SUMP o 0 o n o 0 0 12" ° ° ELEV. _ q O ELEV. = a V. ° ° ° ° ° °�° DISTRIBUTION ° ° ° 0 ° ° o ° ° ° ° ELEV. _ `i �.S ELEV. = P. BOX 6.n 3 Fc°-jQ,CrUS-z� r -13 -a TO BE PLACED ON FIRM BASE)1 T0. BE WATER TESTED f^ '>4 (� 1500 GALLON `0 IF MORE THAN ONE OUTLET � I fay /. i TRENCH FORMA 3io,I WELL SEPTIC TANK SOIL ABSORPTION _ ZONE 3/4' TO 1 1/2" SYSTEM (SAS) Ill INDEX WASHED STONE ADJUST SEWAGE DISPOSAL SYSTEM PROFILE BOTTOM OF TEST HOLE OR USCS PROBABLE WATER TABLE ELEV. OBSERVED WATER TABLE ( / / ) ELEV. _ NOT TO SCALE SOIL TEST DATE OF SOIL TEST ; " SOIL TEST DONE BY WITNESSED BY OBSERVATION HOLE 1 ELEV.= OBSERVATION ' HOLE , 2 ELEV.= PERCOLATION RATE MIN./INCH AT INCHES PERCOLATION RATE MIN./INCH AT INCHES