Loading...
HomeMy WebLinkAboutEngineered Plan - 2002BENCMIM TOP OF FOUNDATION ELEV. = 100.00 _ - (ASSUMED) G, LIQUID D FLEET 5 FEET 6 FEET 7 FEET 8 FEET -N - FLOW LINE COLOR X'`_ 20 FT. MINIMUM FROM CELLAR 10 FT. MINIMUM 10 FT. MINIMUM FROM SLAB OR CRAWL SPACE CONCRETE COVERS 4" SCHEDULE 40 PVC PIPE MIN. PITCH 1/8" PER FT, 6 MA 4" CAST IRON PIPE6 MAX (ORPIT EQUAL) MINIMUM PITCH 1/4" PER FT. r_jNAY W. GUN CLEAN SAND - LOAM AND SEED 2" LAYER OF 1/8" TO 1/2" MAX. 991 WASHED STONE VENT MIN. NOT REQUIRED Z 1 CU. FT. OF CONCRETE 981 a, ANCHOR CAPACITYELEV. 94,7 INFILTRATORS WITH % HIGH S10NE IN AN II X 46' TRENCH FORMATION SOIL ABSORPTION WELL N/A ZONE SYSTEM! (SAS) INDEX ADJUST USGS PRCBABLE WATER TABLE ELEV. = N lF;_ OBSERVED WATER TABLE ( / / ) ELEV. = BOTTOM OF TEST HOLE ELEV. = ¢g f S.F. SOIL TEST 2i5_/02 DATE OF SOIL TEST SOIL TEST DONE BY WITNESSED BY _. MURf_'}iY OBSERVATION HOLE 1 ELEV.=_ g°•� PERCOLATION RATE _ < _ MIN./INCH AT 64 INCHES DEPTH HORIZ FLOW LINE COLOR ELEV. _ _ 97.0_ 10" _T MIN. 0 30 Fit -L 96.2 4 NUMBER OF BEDROOMS _ 1 ELEV. = 2'0" LEVEL ELEV. = 96.5 _ 'OYR 6✓6 GAS ELEV. _ 96.0 6" SUMP 95.8 ELEV. _ 5.8 - 45 132 C2 MEDIUM SAND _._ BAFFLE BAFFLE REQUIRED SEPTIC TANK CAPACITY GAL. = PROJ: MAI�i �9lt E 33 G U W71 ELEV. _ OUTLET TFF SOIL CLASSIFICATION I__ BOX 14 INCHES (TO BE PLACED ON FIRM BASE) TO BE WATER TESTED IINCHES 1500 GALLON IF MORE THAN ONE OUTLET 24 NCHES 29 34 SEPTIC SCALE 12 TANK (TO BE PLACED ON FIRM BASE) INCHES 444.7 LEACHING CAPACITY (AREA X RATE) GAL./DAY 3/4" TO 1 1/2" CLEAN RESERVE LEACHING CAPAC,T1Y��`�''`_ GAL./DAY DOUBLE WASHED STONE NOTES: I JOB N0. 247 ;" FREE OF FINES & SILT SEWAGE DISPOSAL SYSTEM PROFILE REGULATIONS FOR THE SuBSURFACEDDISPOSAL OF SEWAGE. NOT TO SCALE LOCATION MAP r_jNAY W. GUN CLEAN SAND - LOAM AND SEED 2" LAYER OF 1/8" TO 1/2" MAX. 991 WASHED STONE VENT MIN. NOT REQUIRED Z 1 CU. FT. OF CONCRETE 981 a, ANCHOR CAPACITYELEV. 94,7 INFILTRATORS WITH % HIGH S10NE IN AN II X 46' TRENCH FORMATION SOIL ABSORPTION WELL N/A ZONE SYSTEM! (SAS) INDEX ADJUST USGS PRCBABLE WATER TABLE ELEV. = N lF;_ OBSERVED WATER TABLE ( / / ) ELEV. = BOTTOM OF TEST HOLE ELEV. = ¢g f S.F. SOIL TEST 2i5_/02 DATE OF SOIL TEST SOIL TEST DONE BY WITNESSED BY _. MURf_'}iY OBSERVATION HOLE 1 ELEV.=_ g°•� PERCOLATION RATE _ < _ MIN./INCH AT 64 INCHES DEPTH HORIZ TEXTURE COLOR MOTT. I OTHER 0 30 Fit -L 4 NUMBER OF BEDROOMS _ FOR 30 45 Cl COARSE SAND 'OYR 6✓6 TOTAL ESTIMATED FLOW 30% COBBLES 45 132 C2 MEDIUM SAND IOYR 7/4 REQUIRED SEPTIC TANK CAPACITY GAL. = HOFM4Ss4 I:DUMAS ITW APPROVED: BOARD OF HEALTH -3 // z7 z -- DATE DATE AGENT NO WATER ENCOUNTERED AT _ {''__ ELEV. = _ 88_3-_ PROPOS2D SEPTIC DESIGN DESIGN CALCULATIONS 4 NUMBER OF BEDROOMS _ FOR GARBAGE DISPOSAL UNIT NO DESIGN - EDWARD . TOTAL ESTIMATED FLOW ( 110 GAL/13R./DAY X 4 BR.) 440 GAL./DAY REQUIRED SEPTIC TANK CAPACITY GAL. = PROJ: MAI�i �9lt E 33 G U W71 ACTUAL SIZE OF SEPTIC TANK r'Q GAL. SOIL CLASSIFICATION I__ TADCO ENVIRRIMENTAL CONSULTANTS DESIGN PERCOLATION RATE <_5__ MIN./IN. "" -�---� t EFFLUENT LOADING RAl 4 GAL./DAY/S.F. 2/06 LEACHING AREA 60-1_ SQ. FT. SCALE 12 11 X 46 + 57X 2 X 10 + 12 444.7 LEACHING CAPACITY (AREA X RATE) GAL./DAY RESERVE LEACHING CAPAC,T1Y��`�''`_ GAL./DAY REVISED NOTES: I JOB N0. 247 ;" 1. ALL WORKMANSHIP AND MATERIAI c SHALL CONFORM TO D.E.P. TITLE 5 AND THE TOWN OF _ YAlM0U -H --__ RULES AND REGULATIONS FOR THE SuBSURFACEDDISPOSAL OF SEWAGE. LOCATION MAP 2. ALL COVERS TO SANIT,-..<Y UNITS SHALL BE BROUGHT TO 1 OF 1 WITHIN 6" OF FINISHED C;:ADE. 3. ALL COMPONENTS OF, THE SANITARY SYSTEM SHALL BE CAPABLE OF WITHSTANDING H-10 LOADING UNLESS THEY ARE UNDER OR WITHIN 10 FT. OF DRIVES OR PAkKING AREAS, H-20 LOADING SHALL BE USED UNDER OR WITHIN 10 FT. OF DRIVES OR PARKING AREAS. LEGEND'_,__ -_7-----__-_-_-____4- ANY,MASONARY UNITS USED TO BRING COVERS TO GRADE SHALL EXISTING SPOT ELEVATION 00,0 Bf F.AOR TARED IN PLACE. EXISTING CONTOUR ----00 --- 5• NO DETERMINATION HAS BEEN MADE AS TO COMPLIANCE WITH FINAL SPOT ELEVATION 00. DEEDED OR ZONING REGULATIONS. OWNER / APPLICANT IS TO FINAL CONTOUR 0 OBTAIN SUCH DETERMIN 110N FROM APPROPRIATE AUTHORITY. SOIL TEST LOCATION ® 6. UTILITIES SHOWN ARE r., .'ROXIMATE ONLY, EXCAVATION CONTRACTOR "DIG UTILITY POLE -0-- IS TO CALL -SAFE" F,T 1-888-344-7233 AT LEAST 72 HOURS TOWN WATER —W W PRIOR TO COMMENCING V'ORK ON SITE. \ CATCH BASIN®� 7. CONTRACTOR IS TO VERIFY GRADES AND ELEVATIONS AS WELL AS ' GAS LINE G SITE CONDITIONS PRIOR TO COMMENCING WORK ON SITE. ANY VARIATION CLEAN OUT C.O. IS TO BE BROUGHT TO Tr1� ATTENTION OF THE DESIGN ENGINEER CESSPOOL C.P. O IMMEDIATELY, 8. PARCEL IS IN FLOOD ZONE ___C�_ 9. LOT IS SHOWN ON ASSE`..::ORS MAP _ AS PARCEL HOFM4Ss4 I:DUMAS ITW APPROVED: BOARD OF HEALTH -3 // z7 z -- DATE DATE AGENT C.' �S8),PROJj2271-00 �d.,,712271-00.DWG 0 T.A. DUMAS PROPOS2D SEPTIC DESIGN FOR EDWARD . �t.0 7F/3F PROJ: MAI�i �9lt E 33 G U W71 TADCO ENVIRRIMENTAL CONSULTANTS "" -�---� t 26 COMPASS b,NE, DENNIS, MA 02638 (50c) 385-2425 2/06 SCALE 12 REVISED I JOB N0. 247 ;" LOCATION MAP REVISED I IFSHEET 1 OF 1 C.' �S8),PROJj2271-00 �d.,,712271-00.DWG 0 T.A. DUMAS