HomeMy WebLinkAboutEngineered Plan - Rev. 2017TOP OF FOUNDATION MINIMUM 20" DIAMETER CONCRETE
EL = 13.4 COVERS RAISED TO WITHIN 6" OF
FINISH GRADE (OR AS NOTED)
EXISTING EL 12.5+____
/\// MINIMUM 9 OF C
' A/i , F=9° 1.7f AST F
11.15 _LIQUID LEVEL_ t
INVERT EL) 10.60 - -
(Proposed INVERT EL 10 14"
10.5 TEE INSTALL TEE
INVERT EL AND GAS BAFFLE
(Existing) 1500 Gal' 750 Gal
27± I 2250 , GALLON
2 -COMPARTMENT
SYSTEM DESIGN CALCULATIONS SEPTIC TANK
SEWAGE DESIGN FLOW REQUIRED: 5 BEDROOM DWELLING @
110 GPD / BEDROOM = 550 GPD REQUIRED
SEWAGE DESIGN FLOW PROVIDED: THIRTY TWO (32) ADS ARC36LP UNITS IN BED
CONFIGURATION IN FOUR (4) ROWS OF EIGHT (8) UNITS.
CAPCITY = 32 UNITS X 5' LONG X 4,73 SF/LF = 756.80 SF/LF (MINIMUM 31 UNTIS)
756.80 X 0.74 GPD = 560 GPD
560 GPD PROVIDED > 550 GPD REQUIRED
MULTI FAMILY (3 UNITS) MINIMUM TWO COMPARTMENT TANK
FIRST COMPARTMENT CAPACITY REQUIRED: 550 GPD X 200% = 1100 GPD REQUIRED
SECOND COMPARTMENT CAPACITY REQUIRED: 550 GPD REQUIRED
PROPOSED: 2250 GAL TWO COMPARTMENT SEPTIC TANK
PROPOSED: 1500 GAL FIRST COMPARTMENT - 750 GAL SECOND COMPARTMENT
A GARBAGE DISPOSAL IS NOT PERMITTED WITH THIS DESIGN
CONSTRUCTION NOTES
1.) ALL WORK SHALL CONFORM TO THE STATE ENVIRONMENTAL CODE, TITLE 5 (310 CMR 15.000):
STANDARD REQUIREMENTS FOR THE SITING, CONSTRUCTION, INSPECTION, UPGRADE, AND
EXPANSION OF ON-SITE SEWAGE TREATMENT AND DISPOSAL SYSTEMS AND FOR THE TRANSPORT
AND DISPOSAL OF SEPTAGE, AND THE LOCAL BOARD OF HEALTH REGULATIONS.
2.) ANY SEPTIC SYSTEM COMPONENT INSTALLED IN A LOCATION WHERE THERE IS POTENTIAL FOR
VEHICLES OR HEAVY EQUIPMENT TO PASS OVER IT SHALL BE DESIGNED TO WITHSTAND AN H-20
LOADING. IF UNDER AN IMPERVIOUS SURFACE, SYSTEM SHALL BE VENTED TO THE ATMOSPHERE.
3.) TO MINIMIZE UNEVEN SETTLING, SEPTIC TANKS AND D -BOX SHALL BE INSTALLED ON A STABLE
MECHANICALLY -COMPACTED BASE ON SIX INCHES OF CRUSHED STONE.
4.) COVERS OVER THE INLET AND OUTLET TEES OF THE SEPTIC TANK, THE DISTRIBUTION BOX, AND
THE SOIL ABSORPTION SYSTEM SHALL BE RAISED TO WITHIN 6" OF FINAL GRADE. LEACHING
FIELDS, TRENCHES, AND OTHER SOIL ABSORPTION SYSTEMS WITHOUT ACCESS MANHOLES SHALL
HAVE AT LEAST ONE (1) INSPECTION PORT CONSISTING .OF PERFORATED 4" PVC PIPE PLACED
VERTICALLY TO THE BOTTOM OF THE SOIL ABSORPTION SYSTEM WITH A CAP, TIED WITH MAGNETIC
MARKING TAPE, ACCESSIBLE TO WITHIN 3" OF FINAL GRADE.
5.) PIPING SHALL CONSIST OF 4" SCHEDULE 40 PVC OR EQUIVALENT, PIPE SHALL BE LAID ON A
MINIMUM CONTINUOUS GRADE OF NOT LESS THAN 2% FROM THE BUILDING TO THE SEPTIC TANK,
AND NOT LESS THAN 1% OTHERWISE.
6.) DISTRIBUTION LINES FOR THE SOIL ABSORPTION SYSTEM SHALL BE 4" DIAMETER SCHEDULE 40
PVC (OR EQUIVALENT) LAID AT 0.005 FT/FT, UNLESS OTHERWISE NOTED. LINES SHALL BE CAPPED
AT END OR AS NOTED.
7.) LINES FROM THE DISTRIBUTION BOX TO BE LEVEL FOR THE FIRST TWO (2) FEET BEFORE
PITCHING TO THE SOIL ABSORPTION SYSTEM. DISTRIBUTION BOX SHALL BE WATER TESTED TO
ASSURE EVEN DISTRIBUTION.
8.) GROUT TO BE USED AT ALL POINTS WHERE PIPES ENTER OR LEAVE ALL CONCRETE STRUCTURES
IN ORDER TO PROVIDE A WATERTIGHT SEAL.
9.) HEAVY EQUIPMENT SHALL NOT BE ALLOWED TO OPERATE OVER THE LIMITS OF THE SEWAGE
DISPOSAL FIELD DURING THE COURSE OF CONSTRUCTION OF THE SYSTEM.
10.) IN ACCORDANCE WITH 310 CMR 15.221, ALL SYSTEM COMPONENTS SHALL BE MARKED WITH
MAGNETIC MARKING TAPE.
11.) THERE ARE NO KNOWN WELLS WITHIN 100' OF THE PROPOSED SOIL ABSORPTION SYSTEM.
12.) FROM THE DATE OF THE INSTALLATION OF THE SOIL ABSORPTION SYSTEM UNTIL RECEIPT OF
THE CERTIFICATE OF COMPLIANCE, THE PERIMETER SHALL BE STAKED AND FLAGGED TO PREVENT
USE OF THE AREA THAT MAY CAUSE DAMAGE TO THE SYSTEM.
13.) THE DESIGNER WILL NOT BE RESPONSIBLE FOR THE SYSTEM AS DESIGNED UNLESS
CONSTRUCTED AS SHOWN ON PLAN. ANY CHANGES SHALL BE APPROVED IN WRITING BY THE
DESIGNER.
14.) THE BOARD OF HEALTH REQUIRES INSPECTION OF ALL CONSTRUCTION BY AN AGENT OF THE
BOARD OF HEALTH AND THE DESIGNER. THE DESIGNER SHALL CERTIFY IN WRITING THAT THE
SEWAGE DISPOSAL SYSTEM WAS INSTALLED IN ACCORDANCE WITH THE TERMS OF THE PERMIT
AND THE APPROVED PLANS. 48 HOURS ADVANCE NOTICE IS REQUESTED.
15.) LOCATION OF UTILITIES IS APPROXIMATE AND CONTRACTOR SHALL BE RESPONSIBLE FOR
DETERMINING THE LOCATION OF ALL UNDERGROUND AND OVERHEAD UTILITIES PRIOR To
COMMENCEMENT OF ANY WORK. THIS INCLUDES, BUT IS NOT LIMITED TO, REQUESTS TO DIGSAFE,
ANY PRIVATE UTILITY COMPANIES, AND THE LOCAL WATER DEPARTMENT. ,
16.) CONTRACTOR SHALL VERIFY THAT ALL WASTELINES ARE CONNECTED BY WATER TESTING
WITHIN THE DWELLING PRIOR TO INSTALLATION OF ANY SEPTIC COMPONENTS.
17.) CONTRACTOR SHALL VERIFY EXISTING INVERT ELEVATIONS PRIOR TO INSTALLATION OF ANY
SEPTIC SYSTEM COMPONENTS.
18.) TEST HOLES COMPLETED PER STATE ENVIRONMENTAL CODE, TITLE 5. SOILS CAN BE
VARIABLE AND TEST HOLE DATA IS NO GUARANTEE OF SOIL CONDITIONS IN OTHER AREAS. IF
SOILS DIFFER FROM THOSE SHOWN IN THE SOILS LOGS, DESIGN ENGINEER IS TO INSPECT THE
SOILS PRIOR TO PROCEEDING WITH INSTALLATION OF ANY SEPTIC COMPONENTS.
19.) EXISTING SEPTIC COMPONENTS TO BE LOCATED, PUMPED DRY, FILLED WITH CLEAN SAND AND
ABANDONED IN PLACE OR REMOVED AS REQUIRED. AREA TO BE COMPACTED TO MINIMIZE SETTLING.
20.) 4" PVC WASTELINE SHALL BE SLEEVED WITH A 6" PVC PIPE WHEN WASTE PIPE
IS WITHIN 10' OF WATER LINE.
EXCAVATION NOTES
1) EXCAVATE ALL MATERIAL ABOVE SOIL HORIZON C (SEE DEEP OBSERVATION
HOLE LOG) AT APPROXIMATE ELEVATION 9.1, FOR A LATERAL DISTANCE OF 5'
(WHERE POSSIBLE) IN ALL DIRECTIONS BEYOND THE OUTER PERIMETER OF THE LEACHING AREA.
2) FILL MATERIAL SHALL CONSIST OF CLEAN GRANULAR SAND, FREE FROM ORGANIC
MATTER AND OTHER DELETERIOUS SUBSTANCES, WHICH MEETS THE TEXTURAL
CRITERIA PUT FORTH IN SECTION 15.255(3) OF TITLE 5.
3) SCARIFY THE BOTTOM SURFACE OF THE EXCAVATION PRIOR TO PLACEMENT
OF FILL INTO THE RETAINING STRUCTURE.
4) PLACE FILL ONLY WHEN BOTTOM SURFACE IS DRY.
D -Box Riser Extension
to within 6" of grade
PROVIDE INSPECTION PORTS TO
WITHIN 3" OF FINAL GRADE
9" Minimum Cover
to octuol D -box
10.35
INVERT EL 10,17 1
INVERT EL 6" STONE BASE INVERT EL 9 85
Proposed g,53
(DB 6)
l 15'± l 15'±
Longest Run
FLOW PROFILE
NOT TO SCALE
NOTE:
No existing abutting
foundations within
20' of Leach Chambers
Bed
#5 `Bot
Living coed
#4
_.- Kitchen
BeUnit 3
d
#3 Kitchen Bot
/Down
Living Unit 2
Floor Plan Second Floor
N. T. S.
JUnitl
Both Bed l#"�-�tBed#2
First Floor
11.9±
Filter Fabric
12.5"
THIRTY TWO (32) ADS ARC36LP LEACH CHAMBERS UNITS IN
BED CONFIGURATION IN FOUR (4) ROWS OF EIGHT (8) UNITS
- LEACH CHAMBERS
THIRTY TWO (32) ADS ARC36LP UNITS 5.03'
Top Concrete Bound
EL= 4.5 Adjusted Ground Water
EL= 1.9 Observed Ground Water
EL= 1.4 Bottom Test Hole
Leaching Field Detail
N. T. S.
42.0"
N O
INSPECTION PORTS
3 Estimated High Groundwater Calculation
Index Well # MIW - 29Zone A
Date of Reading 8/16
Depth to Groundwater 9.63
Groundwater Adjustment 2.6
Actual Groundwater Level 1.9
Estimated High Groundwater 4.5
oa 01
,e 0s
cpo
°c°' R°� Old Ma
`, --- -- -----r
Yarmouth, MA
i;
0
Street 31
TBM EL = 11.74
S 86'05'30" E Pleasant
79.50' 11.7
1n 12 11.7 Willow Street Street
Proposed "c) See _ _
32 Infiltrator ARC 36LP / L- Note °
Leach Chambers o 1p 0, #t 9 �2.0
'4 occas�;