Loading...
HomeMy WebLinkAbout2017 Aug 15 - Email to Peter McEntee, PE vonHone, Amy From: vonHone, Amy Sent: Tuesday, August 15, 2017 11:52 AM To: 'PETER MCENTEE' Subject: 6 Copper Brook Rd Pete- I am approving the plan, however, I have added a 40 ml polyliner between the foundation and the leach trench due to the setback variance. Liner to be placed 5' off leach and set at Top: EL. 95.1 and Bottom: EL. 94.0 (miminum bottom of foundation slab floor). I will also need a floor plan prior to releasing the permit. Thanks, Amy Amy L.von Hone, R.S., C.H.O. Assistant Health Director Yarmouth Health Department 1146 Route 28 South Yarmouth, MA 02664 (0) 508-398-2231 X1241 (F)508-760-3472 avonhoneCcDyarmouth.ma.us 1