Loading...
HomeMy WebLinkAboutEngineered Plan - 20170 k', H-kA­�!D LOCATION MAP I i ASSESSORS MAP: 1__.._ _ TEST HOLE LOGS 4�` PARCEL: 1) The installation shall corni�� with `Title V a�;J 1'owu ofq"�i Bo,u-d of. FLOOD ZONE - f) � C,.��2� SOIL EVALUATOR. I � l G 1lealth Regulations. ----- -- - WITNESS : \10 2) `lie installer shall verify the location of utiliti s, sewer inverts and septic REFERENCE: De3EL7-) )C' A OU -79 ��� DATE: 0 1 components prior to installation and setting ba a elevations. PERCOLATION RATE_ : 3) All gravity septic piping to be 4 inch Sch 40 P VC at 1/8" per foot. The first two feet out of the d -box to the leaching shall a level. 1� i� 4) This plan is not to be utilized for property line determination nor any other TH-1 TH-2 nummn other than the nronosed systen, inetatt tinn 12L . j1A �A G. GZ t1� 5) All septic components must meet Title V spec Ccations. 6) Parking shall not be constructed over II10 sep is components. 7) The property is bounded by property corners v nd property lines. 8) The property owner shall review design consi erations to approve of total �112. design flow and number of bedrooms to be co sidered for design. Receipt of payment for the plan and installation based on the plan shall be deemed do,,1 approval of the design flow by the owner. 9) The existing leaching or cesspools shall be pu iiped and filled with material per Title V abandonment procedures. Those ithin the proposed SAS shall. be removed along with contaminated soil and replaced with clean sand per Title V specs. 1(1) System components to be 10 feet from water ine. Sewer• lines crossing the I 0 .Wp,- - - ---- -- water line shall be sleeved with 4 inch SCE 14 PVC with ends grouted if applicable. 'rhe proposed SAS is being instal ed below the water service line. The line is to be sleeved as affiremendol ied and maintained in place. SEPTIC SYSTEM DESIGN 11) If a garbage grinder exists it is to be remove and is the responsibility of the owner to ensure such. FLOW ESTIMATE MATE 12) The installer is to take caution in excavation cround the gas line if such ' exists. BEDROOMS AT GAL/DAY/BEDROOM -yg2 GAL/DAY 13) Tne installer shall verify the location, quantity and elevation of the sewer lines exiting the dwelling"rior to the installation. SEPTIC TANK 14) This plan is representative only that a system can fit on a property meeting ,y Title V requirements. ��GAL/DAY x 2 DAYS GAL USE GALLON SEPTIC TANK SOIL ABSORPTION SYSTEM 0 J x IZ, x Zlx �, = I �,�-7'�,�� DAVID Q SIDE AREA: %�+ Z D t B. MASON c i BOTTOM AREA: X I YND t71 m Q v No. 1066 0 �� SEPTIC SYSTEM SECT IONr�, tOb`t� 4--eC'n1vv� ��A lo" I bk PR GAL SEPTIC TANK �- OU i --5 - Zr 7► 37 SITE AND S: -:WAGE PLAN LOCATION:�� Var>amouth-Healtri Deper-amen4 VEID t PREPARED FOR:_ C�4vlwl lgnme Date SCALE - DAVID B. MASON" DATE: Z-01 DBC ENVIRONMENTAL DESIGNS DATE HEALTH AGENT EAST SANDWICH. MA (508) 833-2177 i i