Loading...
Engineered Plan - 2007TOP OF Raise covers to within 6" of FOUNDATION finish grade install risers as needed EL 100. 3 GROUND SURFACE Rl,--L0LQ-0 Top EL L.Two 500 Gal Concrete chambers w14' slona all aro6i--d (4=10" x 8'-6" x 2'-10) ani 'Ci 170-94,y AT g5-5820 E e TBm EL = 100.00 Top Step Cor 2 Car �q D6 Z Garage Proposed (96. 8) Pump, fill and/or remove _ Foyer 1,500 Gal as required per Title 5 Kit S— Tank Water Line E2d9 J42 Q� Edr �000-1) Lot 157 Tap 100.3 9.,0 Proposed 16,988-:& Sq. Ft. Liv Din Deck 1' D—Box Q-) '?0 �6 00 th ('00-5) Bed Ii 41. 0' .9 Bed 2 0 Gas Line 9- Cl- Fence 01- --------- f — -------- PROPOSED LEACHING FACliffy 170-09 Two 500 Gal. Cont Chambers S 8528'20" W with 4' stone all around Total Area = 25'-0" x 12°-10" STANDARD NOTES 1) THIS PLAN IS FOR REPAIR OF A SEPTIC SYSTE V 2) ALL INSTALLATION PROCELiVPES AND MATERIALS SHALL CONFORM TO 310 CMP. 15.000, THE STATE ENWROArALENT4L CODE TITLE 5, AND THE TOWN OF ---. Yarmouth SUBSURFACE 9ISPOSAI REGULATIONS. 3) No DETERMINATION HAS BEEN MADE AS TO COMPLIANCE OFA VAILAI LE PROPERTY INFORMATION WITH RECORDED DEEDS OR ZONING REGULATIONS. 4) THIS PROPERTY JS SERWCE0 BY TOWN WATER 5) THERE ARE NO KNOWN WELLS It'THIN 200' OF THE PROPOSED SOIL ESORP77ON SYSTEM 6) ALL COVERS OF SYSTEM COMPOM 'WTS SHALL BE BROUGHT TO Jf7THIA 6" OFTINISHED GRADE MIN 2' LAYER DOUBLE WASHED SHALL BE L CATED DIRECTLY 1/8'- 1/2' STONE 7) ALL SYSTEM COMPONENTS SHALL REMAIN ACCESSIBLE FOR )WSPECT10 V NO STRUCTURES 0 Y 24 UPON OR ABOVE THE COMPONTAr? ACCESS LOCATIONS WHICH WOULD INTERFERE WITH THE PERFORMANCE ACCESS INSPECTION EFFECTIVE PUMPING OR REPAIR. SIDE WALL 8) NO DRIVEWAY PARKING OR TURMNG AREA, OR OTHER IMPERVIOUS A ?EA SHALL BE LOCATED ABOVE A SOIL ABSORPTION 1 1/2' DOUBLE SYSTEM EXCEPT WHEN VENTING HAS BEEN PROVIDED. WASHED STONE 9) SEPTIC TANKS, GREASE TRAPS DOSING CHAMBERS AND DISTRIBUTIO.A BOXES SHALL BE PLACED ON A 6" STONE EASE 94.14- BOTTOM EL TO ENSURE STABILITY AND PREVAINT SEYTMAG R G jo) OUTLET DISTRIBUTION LINES SHALL REMAIN LEVEL FOR A MINIMUM T THE FRSTTWO FEETOFTH . L7 LEV H T 11) ALL SYSTEM COMPONENTS SHALL BE CAPABLE OF WITHSTANDING H—i0 LOADING UNLESS THEY ARE UNDER OR WITHIN 10' 70M LL USED. OF DRIVEWAYS OR PARKING OR. TURNING AREAS IN WHICH CASE H— "n COMPONENTS SHA BE U E - 10) ALL BUILDING SEWER LINES ShAil, HAVE AN INNER DIAMETER OF 4" AND SHILL BE CAST—IRON OR SCHEDULE 40 PVC EL BOTTOM OF TEST HOLE 13) THE DEPTH OF THE TOP OF ALL SYSTEM COMPONENTS SHALL NOT E YCEED 3E" UNLESS VENTING HAS BEEN PROVIDED. 14) IN THE AREAS OF EXCAVATION F)OSTING GRADES SHALL BE REESTABLISHED irNLEFS NOTED AS PROPOSED CONTOURS. 15) IF SOILS ARE ENCOUNTERED D UpINC THE EXCA VA TjoN OF THE SOIL , BSORPTON SYSTEM, THAT DIFFER NO TARL Y FROM THE DEEP OBSERVATION HOLE LOG, CONTACT THE ENGINEER BEFORI PROCEEDING. 16)CONTRACTOR TO VERIFY LOCATIOPT OF ALL UNDERGROUND UTILITIES. PRIOR TC CONSTRUCTION DEEP OBSERVATION HOLE LOG Test Hole #1 (EL = Proposed D — Box .p Dt, nP �le ft) Soil Horizon Soil Soil Texture Color (110 Gal/BR /Dal x Number of BR) (USDA) (Munsell) (Typical) 99.9 AOE 977 6- 30- 2 "MIN— 3VA X B LOAMY SAND 1. I0YR6/6 30" 144" i L 88.4 N R INVERT N VERT EL COARSE SAND 1;2.5Y714 10 2/21/07 Soil Evaluator: ED STONE Witnessed By: P. Renaud .Perc Rate:, (Existing) Soil Survey Description: CARVER Geologic Material: GLACIAL OUTWASR MORRAIKE Depth to Standing Water: NA Depth to Weeping Water: NA Depth to Mottling(Color): NA Est Seasonal High GW: NA USGS Observation Well: NA Date of Last Measurement: NA ALL A IN,.; GAS 'TLE AIJ E L Z. ..... * ........ 4 (�' ........ .... .. I . .. ......... .............................. .................................. ......... 6" STONE EASE Proposed > 1,500 Gal Septic Tank 22' (Typical) .30, S = 0.03 S = 0.01 GROUND SURFACE Rl,--L0LQ-0 Top EL L.Two 500 Gal Concrete chambers w14' slona all aro6i--d (4=10" x 8'-6" x 2'-10) ani 'Ci 170-94,y AT g5-5820 E e TBm EL = 100.00 Top Step Cor 2 Car �q D6 Z Garage Proposed (96. 8) Pump, fill and/or remove _ Foyer 1,500 Gal as required per Title 5 Kit S— Tank Water Line E2d9 J42 Q� Edr �000-1) Lot 157 Tap 100.3 9.,0 Proposed 16,988-:& Sq. Ft. Liv Din Deck 1' D—Box Q-) '?0 �6 00 th ('00-5) Bed Ii 41. 0' .9 Bed 2 0 Gas Line 9- Cl- Fence 01- --------- f — -------- PROPOSED LEACHING FACliffy 170-09 Two 500 Gal. Cont Chambers S 8528'20" W with 4' stone all around Total Area = 25'-0" x 12°-10" STANDARD NOTES 1) THIS PLAN IS FOR REPAIR OF A SEPTIC SYSTE V 2) ALL INSTALLATION PROCELiVPES AND MATERIALS SHALL CONFORM TO 310 CMP. 15.000, THE STATE ENWROArALENT4L CODE TITLE 5, AND THE TOWN OF ---. Yarmouth SUBSURFACE 9ISPOSAI REGULATIONS. 3) No DETERMINATION HAS BEEN MADE AS TO COMPLIANCE OFA VAILAI LE PROPERTY INFORMATION WITH RECORDED DEEDS OR ZONING REGULATIONS. 4) THIS PROPERTY JS SERWCE0 BY TOWN WATER 5) THERE ARE NO KNOWN WELLS It'THIN 200' OF THE PROPOSED SOIL ESORP77ON SYSTEM 6) ALL COVERS OF SYSTEM COMPOM 'WTS SHALL BE BROUGHT TO Jf7THIA 6" OFTINISHED GRADE MIN 2' LAYER DOUBLE WASHED SHALL BE L CATED DIRECTLY 1/8'- 1/2' STONE 7) ALL SYSTEM COMPONENTS SHALL REMAIN ACCESSIBLE FOR )WSPECT10 V NO STRUCTURES 0 Y 24 UPON OR ABOVE THE COMPONTAr? ACCESS LOCATIONS WHICH WOULD INTERFERE WITH THE PERFORMANCE ACCESS INSPECTION EFFECTIVE PUMPING OR REPAIR. SIDE WALL 8) NO DRIVEWAY PARKING OR TURMNG AREA, OR OTHER IMPERVIOUS A ?EA SHALL BE LOCATED ABOVE A SOIL ABSORPTION 1 1/2' DOUBLE SYSTEM EXCEPT WHEN VENTING HAS BEEN PROVIDED. WASHED STONE 9) SEPTIC TANKS, GREASE TRAPS DOSING CHAMBERS AND DISTRIBUTIO.A BOXES SHALL BE PLACED ON A 6" STONE EASE 94.14- BOTTOM EL TO ENSURE STABILITY AND PREVAINT SEYTMAG R G jo) OUTLET DISTRIBUTION LINES SHALL REMAIN LEVEL FOR A MINIMUM T THE FRSTTWO FEETOFTH . L7 LEV H T 11) ALL SYSTEM COMPONENTS SHALL BE CAPABLE OF WITHSTANDING H—i0 LOADING UNLESS THEY ARE UNDER OR WITHIN 10' 70M LL USED. OF DRIVEWAYS OR PARKING OR. TURNING AREAS IN WHICH CASE H— "n COMPONENTS SHA BE U E - 10) ALL BUILDING SEWER LINES ShAil, HAVE AN INNER DIAMETER OF 4" AND SHILL BE CAST—IRON OR SCHEDULE 40 PVC EL BOTTOM OF TEST HOLE 13) THE DEPTH OF THE TOP OF ALL SYSTEM COMPONENTS SHALL NOT E YCEED 3E" UNLESS VENTING HAS BEEN PROVIDED. 14) IN THE AREAS OF EXCAVATION F)OSTING GRADES SHALL BE REESTABLISHED irNLEFS NOTED AS PROPOSED CONTOURS. 15) IF SOILS ARE ENCOUNTERED D UpINC THE EXCA VA TjoN OF THE SOIL , BSORPTON SYSTEM, THAT DIFFER NO TARL Y FROM THE DEEP OBSERVATION HOLE LOG, CONTACT THE ENGINEER BEFORI PROCEEDING. 16)CONTRACTOR TO VERIFY LOCATIOPT OF ALL UNDERGROUND UTILITIES. PRIOR TC CONSTRUCTION DEEP OBSERVATION HOLE LOG Test Hole #1 (EL = 100.4 .p Dt, nP �le ft) Soil Horizon Soil Soil Texture Color (110 Gal/BR /Dal x Number of BR) (USDA) (Munsell) 0 6" 99.9 AOE LOAMY SAND ' 10YR412 IOYR511 6- 30- 97.9 B LOAMY SAND 1. I0YR6/6 30" 144" i L 88.4 C COARSE SAND 1;2.5Y714 Deep Obs Hole Date: 2/21/07 Soil Evaluator: ED STONE Witnessed By: P. Renaud .Perc Rate:, 2 MIN/IN @ 54" Soil Survey Description: CARVER Geologic Material: GLACIAL OUTWASR MORRAIKE Depth to Standing Water: NA Depth to Weeping Water: NA Depth to Mottling(Color): NA Est Seasonal High GW: NA USGS Observation Well: NA Date of Last Measurement: NA Comments: GRAPHIC SCALE 0 0 10 20 40 80 Y. IN FEET 1 inch = 20 ft. DE,) T IGN DATA Number of Be rooms .2 Garbage Grinder: NO Design Flow (110 Gal/BR /Dal x Number of BR) Septic Tank: o o --zed) 11500 (Minimum = Des ign Flow x 200%) Gal. Leaching Area 8s) y 2 x 2 'ottoM: -7 Ft X FV} Leaching Area Design Capacity: 471 SF (Sidewall Area Bottom Area) x LTAR x 0. 74 CPD Provided 349, 349 GPD Provid---3d GPD Required Reserve C"I Plan Sep JjC 'It.e & J— J 67 -D Upgra de 42 Pebble Beach Road in Sc uth Yarmouth, MA 02664 Scale: I" = 20' DATE. 3/01/07 . RE OAR 2 0 20( R• V 7 Prepared For. - Deed Reference eanor Fairman EK 1033 PG "54 42 Pebble Beach Road 1"Jema Map Ref. S uth Yarmouth, MA 02664 250001-5C Prepared By.- Zone C 5 Plan Referenc-e A & M Land Services 24 Commonwealth Avenue LJ C. Plan 28477F South Yarmouth, M4 02664 (508) 737-1777 130 ASSESSORS MAP 90 LOT - - Dwg No .3312 Midiron Dr, LOCUS Bakers Path LOCATION MAP t EDWARD A. , STONE No. 28930 � 7/aTA