Loading...
HomeMy WebLinkAboutEngineered Plan - 1999bh;.NNL;kWA tK HORIZ LOAM AND SEED COLOR TOP OF FOUNDATION OTHER 20 FT. MINIMUM FROM CELLAR ELEV. = 10 0 0 10 FT. MINIMUM 10 FT MINIMUM FROM SLAB OR CRAWL SPACE (ASSUMED) ADJUST NOTREQUIRED Z 1 CU. Ff. OF CONCRETE CALCULATIONS CONCRETE 7, COVERS ANCHOR OBSERVED WATER TABLE ( / / ) ELEV. = GARBAGE. DISPOSAL 4' SCHEDULE 40 PVC PIPE 71 BOTTOM OF TEST HU.E ELEV. - E2, L TOTAL ESTIMATED FL MIN. PITCH 1/8' PER FT. ( 110 GAL/BR./D Y X 8R.) 0 0 4' CAST IRON PIPE X.• GAL. I (OR EQUAL) MINIMUM TIC TANK 1500 PITCH 1/4' PER FT. FLOW UNE ej 3_? ELEV._ 10' Z 7, 2'0` ELEV. _ �p GAS ELEV. - `'i 7, U 6• SUMP _ _ Le ~ BAFFLE DISTRIBUTION LIQUID DEPTH OUTLET TEE _ BOX 4 FEET 14 INCHES (TO BE PLACED ON FIRM BASE) TO BE WATER TESTED 6 FEET 2424 INCHES 1500 GALLON IF MORE THAN ONE OUTtET 8 FEET 34 INCHES SEPTIC TANK (TO BE PLACED ON FIRM BASE) 3/4' TO 1 1/2'—J WASHED STONE SEWAGE DISPOSAL SYSTEM PROFILE NOT TO SCALE CLEAN SAND HORIZ LOAM AND SEED COLOR 2' LAYER OF OTHER 1/8' TO 1/2' ZONE INDEX WASHED STONE ADJUST NOTREQUIRED Z 1 CU. Ff. OF DESIGN CALCULATIONS CONCRETE 7, ANCHOR 0 0 10* yELEV. HIGH CAPACITY TES N AN TORS WITH � 3 iGx 3 7 X 1p+r TRENCH FORMATION LEGEND: EXISTING SPOT ELEVATION 00,0 EXISTING CONTOUR----00---- FINAL SPOT ELEVATION 00.0 FINAL CONTOUR 0 SOIL TEST LOCATION UTILITY POLE -0- TOWN WATER —W -- CATCH BASIN �® j GAS LINE G `" CLEAN OUT C.O. CESSPOOL C.P.0 DA OF SOUL TEST SOIL '�j SOIL ST DONE B SWEETSER ENGINEERING WITN SSED BY Jfr Pa /Y OBSERVATION HOLE 1 ELEV.= PERCOLATION RA - MIN./1NCH AT INCHE; DEPTH HORIZ TEXTURE COLOR MOTT. OTHER SYSTEM (SAS) ZONE INDEX ADJUST USGS PROBABLE WATER TABLE ELEV. = DESIGN CALCULATIONS NUMBER 0BEDR S .� OBSERVED WATER TABLE ( / / ) ELEV. = GARBAGE. DISPOSAL NIT Nom, BOTTOM OF TEST HU.E ELEV. - E2, L TOTAL ESTIMATED FL W 3 ( 110 GAL/BR./D Y X 8R.) GAL/DAY \ REQUIRED SEPTIC TA4K CAPACITY v GAL. ACTUAL SIZE OF crt TIC TANK 1500 ej 3_? SOIL ABSORPTION WELL'�, WATER ENCO NTERED AT S ELEV. SYSTEM (SAS) ZONE INDEX ADJUST USGS PROBABLE WATER TABLE ELEV. = DESIGN CALCULATIONS NUMBER 0BEDR S .� OBSERVED WATER TABLE ( / / ) ELEV. = GARBAGE. DISPOSAL NIT Nom, BOTTOM OF TEST HU.E ELEV. - E2, L TOTAL ESTIMATED FL W 3 ( 110 GAL/BR./D Y X 8R.) GAL/DAY \ REQUIRED SEPTIC TA4K CAPACITY v GAL. ACTUAL SIZE OF crt TIC TANK 1500 GAL SOIL CLASSIFICATION I DESIGN PERCOLATION RATE < 5 MIN./IN. EFFLUENT LOADING[TE 0.74 GAL/DAY/S.E )ZACHING AREA 1 �� s SQ. FT`LEACHII`. G CAPACITYEA X RATE) �31' GAL./DAY �Y eai h' 0, 74`RESERVE LEACHINGACITY GAL/DAY NOTES: 1. ALL WORKMANSHIP D MATERIALS SHALL CONFORM TO D.E.P. TITLE 5 ANDTHE T WN OF YFJ fi' <'T'��T✓ RULES AND REGULATIONS FOR E SUBSURFACE DISPOSAL OF SEWAGE. 11.AREA OF THE SOIL ABSORPTION SYSTEM IS TO BE EXCAVATED 2. ALL COVERS TO S ITARY UNITS SHALL BE BROUGHT TO AND INSPECTED BY THE DESIGN ENGINEER AND HEALTH DEPARTMENT WITHIN 6' OF FINI GRADE. AND IF DEEMED UNACCEPTABLE, AN OVERDIG OF 3. ALL COMPONENTS 0 THE SANITARY SYSTEM SHALL BE CAPA13LE 0 ALL UNSUITABLE MATERIAL SHALL BE REMOVED FROM UNDER AND WITHSTANDING H-1 LOADING UNLESS THEY ARE UNDER OR WITHIN FOR A MINIMUM OF 5' AROUND SOIL ABSORPTION SYSTEM AND BE 10 FT. OF DRIVES OR2 PARKING AREAS. -H-20 LOADING SHALL BE REPLACED NTH MATERIAL AS SPECIFIED IN 310 CMR 15.255:(3). USED UNDER OR WI f HIN 10 FT. OF DRIVES OR -PARKING AREAS. 12. VARIANCES TO TITLE 5 AND YARMOUTH REGULATIONS: 4. ANY MASONARY UNf'''rSS USED TO BRING COVERS TO GRADE SHALL. A. SOIL ABSORPTION SYSTEM LESS THAN 20' FROM CELLAR. BE MORTARED IN PdACE. B. SOIL ABSORPTION SYSTEM LESS THAN 10' FROM LOT LINE. 5. NO DETERMINATION AS BEEN MADE AS TO COMPLIANCE WITH C. NO RESERVE AREA. DEEDED OR ZONING REGULATIONS_ OWNER /. APPLICANT IS TO 3 OBTAIN SUCH D MINATION FROM APPROPRIATE AUTHORITY. U ..... n10",-44 _nc►.: �.c+s�c�r+�tt�leTF 0."-!.Y- EXCAVATION WNTRACTO? IS TO CALL I'DIG—SAFE' AT 1-888-344-7233 AT LEAST 72 HOURS PRIOR TO COMMEN NG WORK ON SITE. 7. CONTRACTOR IS VERIFY GRADES AND ELEVATIONS AS WELL AS1 SITE CONDITIONS P OR TO COMMENCING WORK ON SITE. ANY VARIA IS TO BE BROUGHT TO THE ATTENTION OF THE DESIGN ENGINEER IMMEDIATELY. :., 8. PARCEL IS IN FL ZONE 9. LOT IS SHOWN ON SSESSORS MAP AS PARCEL r 10. EXISTING SEPTICS TO BE PUMPED AND i<A. FEB 1 9 1399 APPROVED: BOARD OF HEALS H;. A7 LTH ... L2 C/� , DATE AGENT r .t� a T. DU'AS -1 too, Gig' vs 1 1 PROPO�ED SEPTIC DESIGN /J FOR PROJECT LOCATION 71 S ffT ETSER ENGINEERING g> 235 GREAT WESTERN ROAD —39 SOUTH DEBOX N S,�MASS. r 39$--3922 D266d DATES 1999. scALE REVISER JOB NO. LOCATION MAP I IREVISED SHEET / OF / 01999 SWEETSER ENGINEER 1