Loading...
HomeMy WebLinkAboutFormatted - Fire Clean Up62 HIGH BANK RD. 12-1-2017 BASS RIVER GOLF CLUB PESTICIDE STORAGE SHED FIRE -17 z _;_ LEFT: The shed on the right had an electrical fire that ruptured pesticide containers. RIGHT: The steel flooring of the shed below which is containment capacity. ABOVE RIGHT, ABOVE LEFT AND BELOW: Containerized liquid and dry pesticides and ruptured containers that were packed by Clean Harbors and evaluated by an LSP from Tighe & Bond before removal by Clean Harbors.