Loading...
HomeMy WebLinkAboutBLD-18-003379 oF•YgR TOWN OF YARMOUTH Building Department CERTIFICATE OF -2.4? • 4 (508) 398-2231 ext.1261 OCCUPANCY 04_ _ it . y PERMIT NO BLD-18-003379 { • Ia�fTKwtf�I 4. t..,..• ROBERT K LEE ' ADDRESS: 169 CRANBERRY LN, YARMOUTH PORT, MA 02675 ZONING DISTRICT Bldg.Type:[Residential 1 SUBDIVISION MAP BLOCK LOT 128.6 BEBUILDING IS TO REMARKS New Construction per approved plan 780 CMR MSBC, 8'h Edition,TOY Bylaws— 3 bedrooms, 3.5 baths,2 car garage, kitchen&family room as per plans dated 12/27/17. (781-248-2539) CERTIFICATE OF INSPECTIO � � A�,, � i ^1 DATE://) /36//l BUILDING OFFICIAL: prp k ¶r I! 6 Harvest Homes, Inc. BUILDING DEPT BY Robert Lee/600 Worcester Framingham, MA 01702 PHONE itS PERMIT CONVEYS NO RIGHT TO OCCUPOY ANY STREET, ALLEY OR SIDEWALK OR ANY PART THEREOF, EITHER TEMPORARILY OR ERMANENTLY.ENCROACHMENTS ON PUBLIC PROPERTY,NOT SPECIFICALLY PERMITTED UNDER THE BUILDING CODE,MUST BE APPROVED BY THE 1RISDICTION. STREET OR ALLEY GRADES AS WELL AS DEPTH AND LOCATION OF PUBLIC SEWERS MAY BE OBTAINED FROM THE DEPARTMENT OF JBLIC WORKS. CERTIFICATE OF OCCUPANCY BUILDING INSPECTIONS APPROVALS EIRE: OTHER pt#- DATE: /a/'Z3h1 DATE: /0//7 /4 INSPECTOR: c c�(� INSPECTOR: . . . . _ .'ce,/ ELECTRICALQ BOARD OF HEALTH paw/F��'/77 DATE: (,t)-'(I`t,V DATE: /0 '/ '7 '(2 SO /¢—..)-/ f S /I,EA/ArraaclsW 3 INSPECTOR: INSPECTOR: 6f l bCW ,G¢Giar -awS"le/' PLUMBING/GAS ) FINAL BUILDING DATE: 024/ I g DATE: /D/a-S hi INSPECTOR: n & INSPECTOR: >V2stEP .,P.ccpi COMMUNITY DEVELOPMENT: DATE NAME �� pf•YAlt TOWN OF YARMOUTH Building Department BUILDING 2A '�O (508)398-2231 ext.1261 ��' A L PERMIT NO :BLD-18-003379 r r PERMIT :' AC"...vo ISSUE DATE ;01/08/2018 JOB WEATHER CARD APPLICANT ROBERT K LEE PERMIT TO New Building AT(LOCATION) 1169 CRANBERRY LN,YARMOUTH,MA 02675 I ZONING DISTRICT I 1 Bldg.Type: 'Residential 'I SUBDIVISION MAP BLOCK LOT 128.6 BUILDING IS TO BE: CONST TYPE V B USE GROUP R-3 REMARKS New Construction per approved plan 780 CMR MSBC,8th Edition,TOY CONTRACTOR Bylaws-3 bedrooms, 3.5 baths,2 car garage,kitchen&family room as per LICENSE CS-091832 plans dated 12/27/17. (781-248-2539)NOTE:A CERTIFIED AS BUILT IS Construction Supervisor REQUIRED BEFORE FINAL INSPECTION. ROBERT K LEE ROBERT LEE AREA(SQ FT) 664,115,760. EST COST($) 210000.00 PERMIT FEE($) 1,712.00 Framingham,MA 01702 OWNER HARVEST HOMES, INC. BUILDING DEPT BY ADDRESS 'ROBERT LEE,600 WORCESTER ROAD FRAMINGHAM MA 01702 PHONE THIS PERMIT CONVEYS NO RIGHT TO OCCUPY ANY STREET, ALLEY OR SIDEWALK OR ANY PART THEREOF, EITHER TEMPORARILY OR PERMANENTLY. ENCROACHMENTS ON PUBLIC PROPERTY, NOT SPECIFICALLY PERMITTED UNDER THE BUILDING CODE, MUST BE APPROVED BY THE JURISDICTION. STREET OR ALLEY GRADES AS WELL AS DEPTH AND LOCATION OF PUBLIC SEWERS MAY BE OBTAINED FROM THE DEPARTMENT OF PUBLIC WORKS.THE ISSUANCE OF THIS PERMIT DOES NOT RELEASE THE APPLICANT FROM MINIMUM INSPECTIONS REQUIRED FOR ALL APPROVED PLANS MUST BE RETAINED ON WHERE APPLICABLE SEPARATE CONSTRUCTION WORK 1)FOUNDATIONS OR JOB AND THIS CARD KEPT POSTED UNTIL PERMITS ARE REQUIRED FOR FOOTINGS.2)PRIOR TO COVERING STRUCTURAL FINAL INSPECTION HAS BEEN MADE.WHERE ELECTRICAL PLUMBING/GAS MEMBERS(READY FOR LATH OR FINISH COVERING) A CERTIFICATE OF OCCUPANCY IS AND MECHANICAL 3)FINAL INSPECTION BEFORE OCCUPANCY 4) REQUIRED,SUCH BUILDING SHALL NOT BE INSTALLATIONS. REFER TO DETAILED INSPECTION SCHEDULE OCCUPIED UNTIL FINAL INSPECTION HAS BEEN MADE. POST THIS CARD SO IT IS VISIBLE FROM STREET BUILDING INSPECTIONS APPROVALS Foundation Other Frame Inspector Date Inspector Date Inspector Date Insulation Rough Frame Inspector Date Inspector Date WORK SHALL NOT PROCEED PERMIT WILL BECOME NULL AND VOID IF INPSECTIONS INDICATED ON THIS CARD UNTIL THE INSPECTOR HAS CONSTRUCTION WORK IS NOT STARTED WITHIN SIX CAN BE ARRANGED FOR BY TELEPHONE APPROVED THE VARIOUS MONTHS OF DATE THE PERMIT IS ISSUED AS NOTED OR WRITTEN NOTIFICATION. STAGES OF CONSTRUCTION Agr)VF f Cipro, Linda From: Vozella, Beth Sent: Wednesday, October 17, 2018 11:46 AM To: Cipro, Linda Subject RE: 169 Cranberry Lane Linda- OKH Chair called to let me know that 169 Cranberry passed inspection yesterday. I will forward copy of approved paperwork as soon as I receive it. -Beth From:Cipro, Linda Sent:Wednesday,October 17,2018 11:43 AM To: Inkley, Brad<binkley@yarmouth.ma.us>; Hall, Lee<lhall@yarmouth.ma.us>; Elliott, Ken <KElliott@yarmouth.ma.us>;Vozella, Beth<BVozella@yarmouth.ma.us>; Huck, Kevin<KHuck@yarmouth.ma.us>; Sawyer,Jon<jsawyer@yarmouth.ma.us>;Simonian, Philip<PSimonian@yarmouth.ma.us>;Smith,Scott <ssmith@yarmouth.ma.us> Subject:169 Cranberry Lane Good Morning, The Building Department is scheduled to conduct a final for occupancy inspection at 169 Cranberry Lane—new construction—on Monday 10/22/18 and would like for you to attend. The contact person is Robert Lee and he can be reached at 781-248-2539. Please notify me regarding your inspection results. Thank you, Linda 1 Of"YqR,,� TOWN OF YARMOUTH • �; c 1146 ROUTE 28,SOUTH YARMOUTH,MASSACHUSETTS 02664-4451 N , Telephone(508)398-2231 Ext.1292 Fax(508)398-0836 OLD KING'S HIGHWAY HISTORIC DISTRICT COMMITTEE Site Inspection Framing /� Occupancy Permit _Other(Specify) OKH Application #: /7-A059/4/ Property Address: /6 9 Cres.nZerr7 In. Owner: Aokor-4-- �P� Contractor: /n r, Contact Phone#: hone#: 7g -a21- T�d211'‘ g Contact Phone#: Findinngs: h//. cp -.tor-a--a- .-444-7-it rx-+ma --w. `L y 2 21 iGew d----e/ a Inspection by: ee//fly 61:6-c"/" .7-'4 Date:/D//i ( I g Time: 7:6"0 am I pm VPass Pass Pending Receipt of As-Built Plans As-Built Plans Received: Fail Remedy: New C/A_ Minor Change Letter 1/2016 L Ot.YgRTOWN OF YARMOUTH Building Department BUILDING 2f 4b (508)398-2231 ext.1261 O ' -C PERMIT NO BLD-18-003379 PERMIT o JOB WEATHER CARD �c�"„ ,5'o ISSUE DATE 01/08/2018 APPLICANT ROBERT K LEE PERMIT TO New Building IAT(LOCATION) 1169 CRANBERRY LN,YARMOUTH,MA 02675 ZONING DISTRICT i Bldg.Type: 'Residential SUBDIVISION MAP BLOCK LOT 1.128.6 i BUILDING IS TO BE: CONST TYPE V B I USE GROUP R-3 REMARKS New Construction per approved plan 780 CMR MSBC,8th Edition,TOY CONTRACTOR Bylaws-3 bedrooms,3.5 baths,2 car garage, kitchen&family room as per LICENSE .CS-091832 plans dated 12/27/17. (781-248-2539)NOTE:A CERTIFIED AS BUILT IS Construction Supervisor REQUIRED BEFORE FINAL INSPECTION. ROBERT K LEE ROBERT LEE ---T_ ------__.._ Framingham,MA 01702 AREA(SQ FT) 664,115,760. EST COST($) 210000.00 PERMIT FEE($) 1,712.00 OWNER HARVEST HOMES, INC. BUILDING DEPT BY ADDRESS ROBERT LEE,600 WORCESTER ROAD FRAMINGHAM MA 01702 a PHONE THIS PERMIT CONVEYS NO RIGHT TO OCCUPY ANY STREET, ALLEY OR SIDEWALK OR ANY PART THEREOF, EITHER TEMPORARILY OR PERMANENTLY. ENCROACHMENTS ON PUBLIC PROPERTY, NOT SPECIFICALLY PERMITTED UNDER THE BUILDING CODE, MUST BE APPROVED BY THE JURISDICTION. STREET OR ALLEY GRADES AS WELL AS DEPTH AND LOCATION OF PUBLIC SEWERS MAY BE OBTAINED FROM THE DEPARTMENT OF PUBLIC WORKS.THE ISSUANCE OF THIS PERMIT DOES NOT RELEASE THE APPLICANT FROM MINIMUM INSPECTIONS REQUIRED FOR ALL APPROVED PLANS MUST BE RETAINED ON WHERE APPLICABLE SEPARATE CONSTRUCTION WORK 1)FOUNDATIONS OR JOB AND THIS CARD KEPT POSTED UNTIL PERMITS ARE REQUIRED FOR FOOTINGS. 2)PRIOR TO COVERING STRUCTURAL FINAL INSPECTION HAS BEEN MADE.WHERE ELECTRICAL PLUMBING/GAS MEMBERS(READY FOR LATH OR FINISH COVERING) A CERTIFICATE OF OCCUPANCY IS AND MECHANICAL 3)FINAL INSPECTION BEFORE OCCUPANCY 4) REQUIRED,SUCH BUILDING SHALL NOT BE INSTALLATIONS. REFER TO DETAILED INSPECTION SCHEDULE OCCUPIED UNTIL FINAL INSPECTION HAS BEEN MADE. fr POST This CARD SO IT IS VISIBLE FROM STREET BUILDING INSPECTIONS APPROVALS 5)/A5 c iiiMe cpitAilifa940(4( 773/ti --/3—le -E,L2 x. 444? Itch i c 1 C . ") - �7� �(� 0a �?l:/J f'LG rlsi?S' nrr�y?u �' , i� er/Pe7e`r�� vr fel 1-p/n At/rkin- ) nc,W -.f O n�n - � a »` OTHER: z� llIs c v / WORK SHALL NOT PROCEED PERMIT WILL BECOME NULL AND VOID IF INPSECTIONS INDICATED ON THIS CARD UNTIL THE INSPECTOR HAS CONSTRUCTION WORK IS NOT STARTED 1MTHIN SIX CAN BE ARRANGED FOR BY TELEPHONE APPROVED THE VARIOUS MONTHS OF DATE THE PERMIT IS ISSUED AS NOTED OR WRITTEN NOTIFICATION. STAGES OF CONSTRUCTION AROVF