Loading...
HomeMy WebLinkAboutEngineered Plans - 2017INS' TOP B01 99.65 99.74 . EDGE OF 100.13 PAVEMENT 100.45 PK SET 100.00 WOODBINE AVE. OF MgSsgcyo o PETER T. McENTEE � CIVIL No. 35109 OWNER OF RECORD TORRES, FELIX DIMITROVA—TORRES, TEODORA 15 WOODBINE AVENUE WEST YARMOUTH, MA 02664 LEGEND X 100.98 EXISTING SPOT GRADE - _- 9 .__ --- EXISTING CONTOUR e;/ j4 I, �— OVERHEAD WIRES ___ G ------- EXISTING GAS SERVICE 1/11 EXISTING WATER SERVICE TEST PIT 44 BENCHMARK OWNER OF RECORD TORRES, FELIX DIMITROVA—TORRES, TEODORA 15 WOODBINE AVENUE WEST YARMOUTH, MA 02664 LOCUS MAP NOT TO SCALE GENERAL NOTES: 1. ALL CHANGES TO THIS PLAN MUST BE APPROVED BY THE LOCAL BOARD OF HEALTH AND THE DESIGN ENGINEER. 2. ALL WORK AND MATERIALS SHALL CONFORM TO THE REQUIREMENTS OF THE STATE ENVIRONMENTAL CODE, TITLE V, AND ANY APPLICABLE LOCAL RULES AND REGULATIONS, EXCEPT AS REQUESTED BELOW: —310 CMR 15.405(1)(a)&(b): 1) A 5' variance, S.A.S. to Property Line(rear), for a 5' setback. 2) An 8' variance, S.A.S. to Property Line(side), for a 2' setback. a+ 3) A 9' variance, S.A.S. to cellar wall(bulkhead), for an 11' setback. 4) A 6' variance, septic tank to cellar wal, for a 4' setback. 3. THE SEWAGE DISPOSAL SYSTEM SHALL NOT BE BACKFILLED PRIOR TO INSPECTION AND APPROVAL BY THE BOARD OF HEALTH AND THE DESIGN ENGINEER. 4. ANY CONDITIONS ENCOUNTERED DURING CONSTRUCTION DIFFERING FROM THOSE SHOWN HEREON SHALL BE REPORTED TO THE DESIGN ENGINEER BEFORE CONSTRUCTION CONTINUES. 5. ALL ELEVATIONS BASED ON AN ASSUMED DATUM. 6. THE DESIGN ENGINEER IS NOT RESPONSIBLE FOR THE FAILURE OF THE CONTRACTOR OR OWNER TO NOTIFY THE LOCAL BOARD OF HEALTH FOR PROPER INSPECTIONS DURING CONSTRUCTION. 7. WATER SUPPLY PROVIDED BY TOWN WATER SERVICE. 8. THERE ARE NO PRIVATE WELLS WITHIN 100' OF THE PROPOSED S.A.S. 9. ALL AREAS CLEARED FOR CONSTRUCTION SHALL BE RESTORED AS AGREED UPON BY OWNER AND CONTRACTOR OR AS OTHERWISE DIRECTED BY THE APPROVING AUTHORITIES. 10. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE THE LOCATION OF ALL UNDERGROUND UTILITIES, PRIOR TO BEGINNING CONSTRUCTION. 11. WHERE REQUIRED, CONTRACTOR SHALL REMOVE ALL UNSUITABLE SOILS IN THE AREA BENEATH AND ON ALL SIDES OF THE S.A.S. AND REPLACE WITH CLEAN SAND AS SPECIFIED IN 310 CMR 255(3). 12. AREAS REQUIRING STRIPOUT OF UNSUITABLE MATERIALS SHALL BE INSPECTED BY HEALTH DEPARTMENT PRIOR TO BACKFILL. 13. ENGINEERING WORKS, INC. IS NOT RESPONSIBLE FOR ANY UNDOCUMENTED SEPTIC SYSTEM COMPONENTS THAT MAY EXIST ON THE PROPERTY. MAP ID: 37-94 PROPOSED SEPTIC SYSTEM UPGRADE PLAN 15 WOODBINE AVENUE, WEST YARMOUTH, MA Prepared for: D.A. Brown, Inc., P.O. Box 145, Centerville, MA 02632 Engineering by: Survey Review by: SCALE DRAWN JOB. NO. Engineering Works, Inc. JC Engineering, Inc. 1 "=20' P.T.M. 245-17 12 West Crossfield Road 2854 Cranberry Hwy. DATE CHECKED SHEET NO. Forestdale, MA 02644 E.Warehom, MA 02538 (508) 477-5313 (508) 273-0377 9/21/17 P.T.M. 1 Of 2 N LOCUS ® .0 o m c a a o Mill c —'Pond = 3 30Q o 0 Rte 28 0 3 �l0 3 m ¢' D Mill Creek LOCUS MAP NOT TO SCALE GENERAL NOTES: 1. ALL CHANGES TO THIS PLAN MUST BE APPROVED BY THE LOCAL BOARD OF HEALTH AND THE DESIGN ENGINEER. 2. ALL WORK AND MATERIALS SHALL CONFORM TO THE REQUIREMENTS OF THE STATE ENVIRONMENTAL CODE, TITLE V, AND ANY APPLICABLE LOCAL RULES AND REGULATIONS, EXCEPT AS REQUESTED BELOW: —310 CMR 15.405(1)(a)&(b): 1) A 5' variance, S.A.S. to Property Line(rear), for a 5' setback. 2) An 8' variance, S.A.S. to Property Line(side), for a 2' setback. a+ 3) A 9' variance, S.A.S. to cellar wall(bulkhead), for an 11' setback. 4) A 6' variance, septic tank to cellar wal, for a 4' setback. 3. THE SEWAGE DISPOSAL SYSTEM SHALL NOT BE BACKFILLED PRIOR TO INSPECTION AND APPROVAL BY THE BOARD OF HEALTH AND THE DESIGN ENGINEER. 4. ANY CONDITIONS ENCOUNTERED DURING CONSTRUCTION DIFFERING FROM THOSE SHOWN HEREON SHALL BE REPORTED TO THE DESIGN ENGINEER BEFORE CONSTRUCTION CONTINUES. 5. ALL ELEVATIONS BASED ON AN ASSUMED DATUM. 6. THE DESIGN ENGINEER IS NOT RESPONSIBLE FOR THE FAILURE OF THE CONTRACTOR OR OWNER TO NOTIFY THE LOCAL BOARD OF HEALTH FOR PROPER INSPECTIONS DURING CONSTRUCTION. 7. WATER SUPPLY PROVIDED BY TOWN WATER SERVICE. 8. THERE ARE NO PRIVATE WELLS WITHIN 100' OF THE PROPOSED S.A.S. 9. ALL AREAS CLEARED FOR CONSTRUCTION SHALL BE RESTORED AS AGREED UPON BY OWNER AND CONTRACTOR OR AS OTHERWISE DIRECTED BY THE APPROVING AUTHORITIES. 10. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE THE LOCATION OF ALL UNDERGROUND UTILITIES, PRIOR TO BEGINNING CONSTRUCTION. 11. WHERE REQUIRED, CONTRACTOR SHALL REMOVE ALL UNSUITABLE SOILS IN THE AREA BENEATH AND ON ALL SIDES OF THE S.A.S. AND REPLACE WITH CLEAN SAND AS SPECIFIED IN 310 CMR 255(3). 12. AREAS REQUIRING STRIPOUT OF UNSUITABLE MATERIALS SHALL BE INSPECTED BY HEALTH DEPARTMENT PRIOR TO BACKFILL. 13. ENGINEERING WORKS, INC. IS NOT RESPONSIBLE FOR ANY UNDOCUMENTED SEPTIC SYSTEM COMPONENTS THAT MAY EXIST ON THE PROPERTY. MAP ID: 37-94 PROPOSED SEPTIC SYSTEM UPGRADE PLAN 15 WOODBINE AVENUE, WEST YARMOUTH, MA Prepared for: D.A. Brown, Inc., P.O. Box 145, Centerville, MA 02632 Engineering by: Survey Review by: SCALE DRAWN JOB. NO. Engineering Works, Inc. JC Engineering, Inc. 1 "=20' P.T.M. 245-17 12 West Crossfield Road 2854 Cranberry Hwy. DATE CHECKED SHEET NO. Forestdale, MA 02644 E.Warehom, MA 02538 (508) 477-5313 (508) 273-0377 9/21/17 P.T.M. 1 Of 2 NOTE: TO PREVENT BREAKOUT, THE PROPOSED FINISH GRADE SHALL NOT BE < EL:98.80 FOR A DISTANCE OF 15' AROUND THE PERIMETER OF THE S.A.S. i //7777771 ;//r. r 7 ! Iii/ SEPTIC TANK PROPOSED S.A.S. .-' % / INSTALL RISERS & COVERS OVER INLET & PROPOSED D -BOX PROVIDE ONE ACCESS MANHOLE TO WITHIN 3" i/f lei EXISTING OUTLET AND SET TO 6" OF FINISH GRADE INSTALL RISER & COVER OF FINISH GRADE FOR INSPECTION PURPOSES / ` T.O.F.=102.3E SET TO 6" OF GRADE F.G. EL.=101.0± HOUSE(#1 ),, r/ F.G. EL.=101.5E F.G. EL.=101.3± F.G. EL.=101.1 t /MAINTAIN OVER S.A.S. r, 2% GRADE (MIN.) ,; L = 4' +. L = 5' L - 5' O ' 2'Dc�� @S=1% (MIN.) ®S=1% (MIN.) ®S=1% (MIN.) ,, 4"SCH40 PVC 6" 4'SCH40 PVC 4"SCH40 PVC N M '. 14 INV.=98.82 48" LIQUID LEVEL INV.=98.57 INV.=98.52 INV.=98.35 aaaMONO m' 4' 4.8 4' , CO ov S AOS. GAS BAFFLE PROPOSED D -BOX EFFECTIVE WIDTH = 12.8 255p___ INV.=98.30 SHED _�� AM jmim Am PROPOSED SEPTIC TANK -500 GALLON LEACHING CHAMBERS CONTRACTOR SHALL CONNECT TO EXISTING SURROUNDED WITH STONE AS SHOWN H-10 RATED 3" LAYER OF 1/8" To 1/2" S.A.S. LAYOUT SUITABLE 4" C.I. OR SCH 40 PVC SEWER DOUBLE WASHED STONE AT, OR ABOVE, INV. EL.=98.90 (OR APPROVED FILTER FABRIC) TOP CONC. ELEV.=99.0± NOTES: BREAKOUT ELEV.=98.80 1) CONTRACTOR SHALL VERIFY ALL EXISTING PIPE INV. ELEV.=98.30 ®®®a ooaw® 0aa®oo ®®®® ® ®®® INVERTS, PRIOR TO INSTALLATION. BOTTOM ELEV.=96.30 ® E3 Ea E3 U E3 U E2 E3 E3 E3 33" 2) SEPTIC TANK & D -BOX SHALL BE SET LEVEL & 4' 85 4 N > ®®®®®®®®®®® TRUE TO GRADE ON A MECHANICALLY COMPACTED 4' OF NATURALLY OCCURRING VARIES -REFER TO SKETCH ® �®® ®® U E31 E3 E3 U 6" CRUSHED STONE BASE, AS SPECIFIED IN 310 PERVIOUS MATERIAL Z CMR 15.221(2). 5' MIN. SEPARATION TO G.W. LEACHING SYSTEM SECTION 3) INSTALL INLET & OUTLET TEES AS REQUIRED. NO G.W. EL.=90.5 - 3/4" TO 1-1/2" DOUBLE - [J WASHED STONE 102" 4) CONTRACTOR SHALL INSTALL A GAS BAFFLE ON THE OUTLET TEE. SEPTIC SYSTEM PROFILE SECTION 4" KNOCKOUT SOILLOG 20" DIA. COVER DESIGN CRITERIA I --21.3'--I DATE: AUGUST 31, 2017 / r -------'T � SOIL EVALUATOR: PETER I McENTEE PE, (SE#1542) WITNESS: AMY VON HONE RS 4" KNOCKOUT 4" KNOCKOUT 62" NUMBER OF BEDROOMS: 2 BEDROOMS -DESIGN FOR 3 BOTTOM AREA N HEALTH AGENT SOIL TEXTURAL CLASS: CLASS I 0-)l ( bo 320.0 S.F. ELEV. TP DEPTH DESIGN PERCOLATION RATE: <2 MIN/IN ( 011 4" KNOCKOUT DAILY FLOW: 330 GPD r--j� 1 LL__ � 3 7' 100.5 A LOAMY D DESIGN FLOW: 330 GPD X12 8 /2 4" 500 GALLON CAPACITY, H-10 LOADING GARBAGE GRINDER: NO 8.5' 100.2 B PLAN PROPOSED SEPTIC TANK: 1500 GALLON CAPACITY PERIMETER=75.6' LOAMY SAND 10YR 5/6 CHAMBERS LEACHING AREA REQUIRED: (330 GPD) = 445.9 SF SAS DIMENSIONS 99.018" C .74 GPD/SF SKETCH PERC 18"/36" N.T.S. PROPOSED SEPTIC SYSTEM UPGRADE PLAN USE 2-500 GALLON LEACHING CHAMBERS IN SERIES 15 WOODBINE AVENUE, WEST YARMOUTH, MA SURROUNDED BY 4' DOUBLE WASHED STONE -ALL SIDES MED. SAND 2.5Y 6/6 Prepared for: D.A. Brown, Inc., P.O. Box 145, Centerville, MA 02632 SIDEWALL AREA: 76.4'(PERIMETER LENGTH) x 2'(EFF. DEPTH) = 151.2 SF Engineering by: Survey Review by: SCALE DRAWN JOB. NO. BOTTOMAREA: I ............ = 320.0 SF ............................................................... Engineering Works, Inc. JC Engineering, Inc. NTS P.T.M. 245-17 TOTAL AREA: .................................................................................... 471.2 SF 90.5 120' 12 West Crossfield Road 2854 Cranberry Hwy. DATE CHECKED SHEET N0. DESIGN FLOW PROVIDED: 0.74 GPD/SF(471.2 SF) = 348.7 GPD NO GROUNDWATER, PERC RATE: <2 MIN JIN. Forestdole, MA 02644 (508) 477-5313 E.Warehom, MA 02538 (508) 273-0377 9/21/17 P.T.M. 2 Of 2