Loading...
HomeMy WebLinkAboutEngineered Plan - 2017N LOCUS \ 4 O ? VV_ Q- �Q Vii°/` LOT 4 (8,800 SF) ASSESSORS MAP: 39 PARCEL: 58 PLAN BOOK: 112, PAGE: 85 IM17-48 KEY: EXISTING CONTOUR: - - - - PROPOSED CONTOUR: ------------- EXISTING SPOT ELEVATION: 25.5 PROPOSED SPOT ELEVATION: 25.5 TEST HOLE: * UTILITY POLE: -o- FENCE LINE: HYDRANT: --6 - RETAINING WALL: v` I 107 107 v 106 25.0' ao N............. LEACH AREA DETAIL 106 SEPTIC SYSTEM DESIGN FLOW ESTIMATE: Il 3 BEDROOMS AT 110 GAL / DAY = 330 GAL / DAY SEPTIC TANK: 330 GAL / DAY x 2 DAYS = 660 GAL USE 1000 GALLON SEPTIC TANK (EXISTING) LEACHING AREA: USE 2 - 500 GALLON CHAMBERS (8.5'x 4.8'x 2' EFF. DEPTH) WITH 4' OF STONE ALL AROUND (25' x 12.8'x 2' DEEP) SIDE AREA: (25' + 12.8') x 2 x 2 = 151 SF (0.74) = 112 GAUDAY BOTTOM AREA: 25'x 12.8'= 320 SF (0.74) =_237 GAUDAY CAPACITY= 349 GAL/DAY \ � 9pp4 `\ O� z o 9 5 105- \ th-1 TH-1 105.0 I' 901 TEST HOLE LOGS O/A/EHORIZON ELEV. 5DK ENGINEER: THOMAS McLELLAN, P.E. LOAMY SAND 10YR 4/3 i _S' 103.9 B HORIZON X 104.7 5 r1i BENCHMARK AT PAINT ON SONOTUBE ELEVATION =105.07 104.5 SEPTIC SYSTEM SECTION LOOR COVERS WITHIN 6" 107.63 OF FINISHED GRADE 11 TOP OF 17 ^� FOUNDATION s �� L a (EXISTING) ELEV.�.1 X1000 GAL SEPTIC TANK TEE SIZES: (TO BE CONFIRMED) INLET: 6" UP, 13" DOWN OUTLET: 6" UP, 14" DOWN T MAX. COVER (1' MIN) ELEV. D -BOX ELEV. (6" OF STONE UNDER OR MECHANICALLY COMPACTED) -GAS BAFFLE AT OUTLET TEE ELEV. 2" PEASTONE OR FI ER FABRIC - 3/4" - 1 1/2" DOUBLE WASHED STONE INSPECTION PORT RT /- ELEV: 103.05 LAI ] ° 100.75 H ° ° ? ELEV. -25'x 12.8' 2 - 500 GALLON CHAMBERS WITH 4' OF STONE Al AROUND (25'x 12.8'x 2' DEEP) THOMAS J. McLE LdAN, P.E.I P•O. BOX 1163, EAST DENNIS, MA 1 508-364-9048 TH-1 105.0 I' 901 TEST HOLE LOGS O/A/EHORIZON ELEV. 5DK ENGINEER: THOMAS McLELLAN, P.E. LOAMY SAND 10YR 4/3 LIVING BED AREA ROOM 13.. WITNESS: AMY VON HONE, R.S. 103.9 B HORIZON DATE: 9-6-17 24" LOAMY SAND 10YR 5/8 103.0 Dianne Date 0 0� PERCOLATION RATE: < 2 MIN/IN C HORIZON o O = MEDIUM SAND �,� 5cn BED Zmp ROOM bath Z 2.5Y 7/4 PERC AT 42"' ;,� PREPARED FOR: DECK bh 120" 95.0 p-vl' NO GROUND WATER ENCOUNTERED EXISTING FLOOR PLAN 20' NOTES: 1. VERTICAL DATUM: ASSUMED 2. MUNICAPAL WATER IS AVAILABLE. 3. SCHEDULE 40 - 4" PVC PIPE BE USED UT SEPTIC SYSTEM., FICATIONS. • -- - ALL PRECAST UNITS SUBJECTTO TRAFFIC LOADS 4. AO CONFORM WITH AASHTO H-20 SPECT 5. PIPE PITCH = 1/4" PER FOOT (UNLESS NOTED OTHERWISE). 6. FIRST 2' OF PIPE OUT OF D -BOX TO BE SET LEVEL. 7. THE SEPTIC SYSTEM HAS NOT BEEN DESIGNED TO ACCOMODATE THE USE OF A GARBAGE DISPOSAL. 8. ALL CONSTRUCTION DETAILS ARE TO BE IN CONFORMANCE WITH THE STATE OF MASS. ENVIRONMEN' CODE (TITLE FIVE) AND LOCAL HEALTH REGULATIONS. 9. CONTRACTOR TO VERIFY LOCATIONS OF ALL UTILITIES PRIOR TO CONSTRUCTION. 10. GROUND COVER OVER ALL SEPTIC SYSTEM COMPONENTS NOT TO EXCEED 3' WITHOUT ARIANCE. 11. FIELD SURVEY PROVIDED BY TERRY A. WARNER, P.L.S., HARWICH, MA. 12. THIS PLAN REQUIRES THE REVIEW AND APPROVAL OF ONE OR MORE TOWN DEPARTMEN SAND IS SUBJECT TO CHANGE UNTIL SUCH TIME. 13. EXISTING LEACH PIT IS TO BE PUMPED AND FILLED WITH SAND OR REMOVED. 14. D -BOX TO BE WATER TESTED TO ENSURE LEVELNESS AND EQUAL FLOW. THOMAS J. McLE LdAN, P.E.I P•O. BOX 1163, EAST DENNIS, MA 1 508-364-9048 I' Yarmouth Health Department SITE PLAN c__ �P (OV' Dianne Date r LOCATION: 46 VACATION LN., W. YARMOUTH ;,� PREPARED FOR: 12U t ADAM MARCOTTE p-vl' 20' BASS RIVER ENGINEE G THOMAS J. McLE LdAN, P.E.I P•O. BOX 1163, EAST DENNIS, MA 1 508-364-9048