HomeMy WebLinkAbout2017 Oct 17 - HOLD - Sign Off Transmittal, Stamped Plans were NOT picked up by builder - Re: Increase Size of Deckcn Buildiag HeLcht CCT
Avg. Natural Grade 0 Street Sides of Found. = 12.4+12.1+12.2+12.014 = El 12.2
Sa�Proposed Top of Foundation = El 14.5
0 Proposed Roof Ridge above TOF = 28.0'
Proposed Bldg, Height= El 14.5+28.0' -El 12.2 = 30.3'
Nantucket
Sound
LOCATION MAP
Assessors Map 26
Parcel 34
Deed: 8k.29207, Pg.325
Plan: Bk, 79, Pg. 119
Lot 36
On Front Setback 30.
)W;n Side Setbock y
,09'26'
10.64 0.0 --� --_. _
FOGF OA
0.0OA AVBMFNT
CRA N, &ERR Y
40' A)VE
WIDe I -A Your
'Y NAIL SET
10.82
*Elevation Datum is NAVD-88
Entire Proposed Structure is Outside
100 yr SFHA
(Zone X Shaded)
per FIRM 25001 C0589
SCALE.• 1 20'
0 20 40 60
PROPOSED LEACHING TRENCHES
60' LONG BY 5' WIDE X P DEEP
Sht: W2
GRAN ENGINEERING ASSOC. LLC
508-432-2878 941 MAIN STREET (RTE 28 5,. HARWICH, MA
SITE & SEPTIC SYSTEM DESIGN PLAN IN YARMOUTH
Prepared For: Lenny Lozinsky
228 CRANBERRY LANE SOUTH YARMOUTH
PROJECT: 16-007SCALE. 1 Pil = 20'1 DA TE.- 911j11 6