Loading...
HomeMy WebLinkAboutEngineered Plans - Rev. 2018LOCUS DATA CURRENT OWNER ELAINE I BERKE 2014 TRUST PLAN REFERENCE 72-51 DEED REFERENCE 28143-23 ZONING DISTRICT R-25 FLOOD ZONE AE, ELEV 11 ASSESSORS MAP 34 PARCEL 171 OVERLAY DISTRICT NONE LOT AREA 4,617± S. F. SITE & SEWAGE REPAIR PLAN Del NBUR Y S TREE T IN S. YARMOUTH, MASS DATE: JANUARY 5, 2018 REV: FEBRUARY 13, 2018 OWNER/APPLICANT: ELAINE BERKE 37 RIVERVIEW DRIVE WESTPORT, MASS SHEET 1 OF 2 PREPARED BY: EAS SURVEY, INC. P.O. BOX 1729 SANDWICH, MA 02563 PH. (508) 888-3619 CELL (508) 527-3600 EAS.SURVEY@YAHOO.COM J� X" P / ( X� O cJ 8.0) 1 / xs.s / 4z:o 'z-/ / 8.8 w UTILITY\,/ POLE L O T 186 / ONO G / Oy g EDWARD A STONE No.28980 2' 0 10 15 20 GRAPHIC SCALE: 1 INCH = 10 FEET 0 D.T.H. #1 BED#1 Yarmouth Health Department AP62 �LP ED ., Date 8.9 / / KITCHEN / DININ LIVING ROOM BATH BED#2 N 06022 M oyF 92 PROPOSED 1,500 — GALLON SEPTIC TANK PROPOSED OBSERVATION PORTS S 0602. 20., � 9 e o� 23�; 28 wk ow ST 0 N a 0 0 0 z a 0 CL DANBURY ST. Z D z LOCUS n0. BREEZY LOCUS MAP NOT TO SCALE: 17-0133 BENCHMARK: TOP CORNER OF CONCRETE STOOP. ELEV 9.35 ,9 O.S. O 16. 11 9' X 9. 0 C. S i // 8.5 PROPOSED LEACHING S.A.S. 11.33'x24.0'(24) QUIK 4 LOW PROFILE LEACHING CHAMBERS. 1 PROP. 16. -BOX/ S/ y O o� h� 1 0.0' � z /PUMP, CRUSH &— ABANDON EXISTING CESSPOOL IN ACCORDANCE WITH 8.5 TITLE 5 RAISE COVERS TO WITHIN 6" OF FINISH GRADE OSEATION PORTS SILL ELEV. 9.77 FINISH GRADE GRADE / SC EW ON CAP TO GRADE ELEV. 8.9 ELEV. 9.3 k __1�X__7/�4_1A1\� - ELEV. 9.2 g,p GROUND ELEVATION 8.50 CLEANOUT - TO GRADE 12" MIN. COVER S=16'00.02 4"1 P,®C 0. 15 6' ®S= 0.02 TOP ELEV 6.35 1 } DRY I & 4 rrvc 5GH 4u INV.= c Mm -0 MAIC - EL 3.5 INV.= 7.62 7.16 10"TEE 14 -TEE INV.= f: EXISTING 6.95 6" TO REMAIN I I GAS BAFFLE a H-10 DB6 Lo 4'-3" LIQUID LEVEL fO D -BOX I �t INV.= 6.45 VERTICAL DATUM: NAVD-1988 BENCH MARK USED: TOP OF CONCRETE PAD ELEVATION 9.35 17-0133 es e e a e a n' 12.41 6" BASE OF CRUSHED STONE OR MECHANICALLY COMPACTED 1,500 GALLON NORWESCO POLYETHYLENE S. TANK L=13'-0", W=4'-7", H=5'-6" SITE & SEWAGE REPAIR PLAN ,73 DA NBVR Y S TFE-F T IN S. YARMOUTH, MASS DATE: JANUARY 5, 2018 REV: FEBRUARY 13, 2018 OWNER/APPLICANT: ELAINE BERKE 37 RIVERVIEW DRIVE WESTPORT, MASS SHEET 2 OF 2 PREPARED BY: EAS SURVEY, INC. 141 RT. 6A SANDWICH, MA 02563 PH. (508) 888-3619 CELL (508) 527-3600 EAS.SURVEY@YAHOO.COM 00 (24) QUIK-4"s LOW PROFILE INFILTRATORS INV,- 5.95 4 ROWS OF 6 UNITS 20 EACH UNIT 34" x 48" x 12" 0 �----- 24.0' - I CL : V 5.68 0o 0 11.33'x24.0' LEACHING AREA � ui IN FIELD CONFIGURATIONELEV, 0.1 ADJ. G.WATER TH#1 CONSTRUCTION NOTES: 1. CONTRACTORS / INSTALLERS SHALL VERIFY GRADES AND ELEVATIONS AND SITE CONDITIONS PRIOR TO COMMENCING WORK ON THE SITE. 2. NO DETERMINATION HAS BEEN MADE AS TO COMPLIANCE WITH DEEDED OR ZONING REGULATIONS. OWNER / APPLICANT IS TO OBTAIN SUCH DETERMINATION FROM APPROPRIATE AUTHORITY, 3. VEHICULAR TRAFFIC, PARKING OF VEHICLES AND PLACING MATERIALS OVER THE SEPTIC TANK IS PROHIBITED. GENERAL NOTES: 1. ALL WORKMANSHIP AND MATERIALS SHALL CONFORM TO D.E.P. TITLE V AND THE TOWN OF YARMOUTH RULES AND REGULATIONS FOR SUBSURFACE DISPOSAL OF SEWERAGE. 2. AT LEAST ONE ACCESS POINT OVER TANK TEES SHALL BE ACCESSIBLE WITHIN 6" OF FINISH GRADE, WITH ANY REMAINING ACCESS PORTS BROUGHT TO WITHIN 12" OF FINISH GRADE. 3. ALL COMPONENTS OF THE SANITARY SYSTEM SHALL BE CAPABLE OF WITHSTANDING H-10 LOADING UNLESS THEY ARE UNDER OR WITHIN 10' OF DRIVES OR PARKING AREAS THEY MUST WITHSTAND H-20 LOADING. 4. THE EXCAVATION CONTRACTOR SHALL VERIFY THE LOCATION OF ALL UTILITIES PRIOR TO ANY EXCAVATION. 5. ANY MASONRY UNITS USED TO BRING COVERS TO GRADE OR WITHIN 6" OF GRADE SHALL BE MORTARED IN PLACE. 6. FINISH GRADE SHALL HAVE A MINIMUM OF 0.02 FEET PER FOOT OVER THE S.A.S. AND DISTRIBUTION BOX. 7. SEPTIC TANK SANITARY TEE'S SHALL BE CONSTRUCTED OF SCHEDULE 40 PVC AND SHALL EXTEND A MINIMUM OF 6" ABOVE THE FLOW LINE AND SHALL BE ON THE CENTERLINE AND LOCATED DIRECTLY UNDER THE CLEAN OUT MANHOLES. 8. THE INLET PIPE INVERT ELEVATION SHALL BE NO LESS THAN 2 INCHES NOR MORE THAN 3 INCHES ABOVE THE INVERT ELEVATION OF THE OUTLET PIPE. 9. THE SEPTIC TANK SHALL HAVE A MINIMUM COVER OF 9 INCHES 10. THE OUTLET SANITARY TEE SHALL BE EQUIPPED WITH A GAS BAFFLE, 4 INCHES IN DIAMETER AND CONSTRUCTED OF 4" PVC 11. ALL PIPES SHALL BE SCHEDULE 40 PVC SEWER PIPE AND SHALL BE SLOPED 1/4 INCH PER FOOT MIN. EXCEPT FOR THE FIRST TWO FEET OUT OF THE DISTRIBUTION BOX WHICH SHALL BE LEVEL 12. CHANGES OR REVISIONS TO SEPTIC DESIGN REQUIRE NOTIFICATION TO EAS SURVEY INC. FOR B.O.H. AND DESIGN ENGINEERS REVIEW AND APPROVAL. 13. MAGNETIC TAPE OVER ALL COMPONENTS. OBSERVATION PORT(S) // SCREW CAP 2.83'-+-2.8,3'-4- 2.83'- 2.83' - 11.33' SIDE VIEW SYSTEM DESIGN EXISTING DESIGN FLOW 2 BEDROOMS AT 110 GPB/D 22- GPD PROPOSED DESIGN FLOW 3 BEDROOMS AT 116 GPB/D 300 GPD REQUIRED SEPTIC TANK 330 x_2 __ = _____660 GAL. PROPOSED POLYETHYLENE TANK = _1 500_GAL. SIZE OF LEACHING FACILITY REQUIRED DESIGN PERC RATE ___<_Z ____MIN./INCH LONG TERM APPL. RATE-21-4-GPD/S.F. SIZE OF LEACHING SYSTEM PROVIDED: 330 _ 0.74 SF/GPD = 445 S.F. MIN. REQ. USING 24 QUIK-4 LOW PROFILE INFILTRATORS CHAMBERS - NO STONE AROUND 4.73 SF / LF X (4 x 24) = 454 S.F 484 x 0.74 G/SF = 336 GPD 336 GPD PROV > 330 GPD REQ. = 6 GPD RES. NO (GARBAGE DISPOSAL / GRINDER ALLOWED) GROUNDWATER ADJUSTMENT DATE OF WELL: 11/17 INDEX WELL: MIW-29 WELL ZONE: A WELL DEPTH: 8.04 WELL ADJUSTMENT: 1.5 DEPTH OF WATER: 10.0 DEPTH OF ADJ.: 8.5 DTH #1 ib INDICATES DEEP TEST HOLE VARIANCES REQUESTED NONE: INDICATES P-1 24" PERC TEST NO MOTTLING NO WEEPING 102" INDICATES ADJ. GROUNDWATER 120" INDICATES OBS. GROUNDWATER D.T,H. #1 i DATE: 11-20-17 GROUND ELEV. 8.6 ADJ G.WATER 0.1 A/O/E LOAMY SAND 10YR 5/2 ELEV = 8.1 B LOAMY SAND 7.5YR 6/6 C MED./FINE SAND 2.5Y 7/6 6" (8.1) 24" (6.6) 26" (6.4) 102" (0.1) 120" (-1.4) 132" (-2.4) B.O.H. AMY VON HONE SOIL EVALUATOR ED. STONE BACKHOE OPERATOR. ELLIS BROTHERS (KEVIN) SOIL TYPE: _1_ PERC RATE: <2 MIN. PER INCH LOADING RATE: 0_74 GAL/SF/MIN