Loading...
HomeMy WebLinkAboutEngineered Plan - 2018KEY: eR00 EXISTING CONTOUR: - — — - �y/<< PROPOSED CONTOUR: •------------ �N EXISTING SPOT ELEVATION: 25.5 PROPOSED SPOT ELEVATION: 25.5 TEST HOLE: * Y9 UTILITY POLE: -O- gLF/Yp FENCE LINE: - HYDRANT: RETAINING WALL: o 'V /��--LOCUS I N LOCATION MAP LOT 5 (10,676 SF) ASSESSORS MAP: 22 PARCEL: 139 PLAN BOOK: 173, PAGE: 3 N .....250....... N LEACH AREA DETAIL SEPTIC SYSTEM DESIGN FLOW ESTIMATE: 3 BEDROOMS AT 110 GAL / DAY = 330 GAL / DAY SEPTIC TANK: 330 GAL / DAY x 2 DAYS = 660 GAL USE 1500 GALLON SEPTIC TANK LEACHING AREA: USE 2 - 500 GALLON CHAMBERS (8.5'x 4.8' x 2' EFF. DEPTH) WITH 4' OF STONE ALL AROUND (25'x 12.8'x 2' DEEP) SIDE AREA: (25'+ 12.81 x 2 x 2 = 151 SF (0.74) = 112 GAL/DAY BOTTOM AREA: 25'x 12.8'= 320 SF (0.74) =137 GAUDAY CAPACITY = 349 GAL/DAY M 17-74 rw SEPTIC SYSTEM SECTION FIRST FLOOR CI TEST HOLE LOGS O/AHORIZON ELEV. ENGINEER: THOMAS McLELLAN, P.E. 12" LOAMY SAND 10YR 3/3 101.0 TOP OF OUDATION1/4" B HORIZON PEF LOAMY SAND 10YR 5/8 99.0C HORIZON PREPARED FOR: MEDIUM SAND JAN SULLIVAN 99.8ELEV. IE per ft. DATE: 1-24-18 99.4 EL EV.. 1500 GAL SEPTIC TANK (6" OF STONE UNDER OR MECHANICALLY COMPACTED) TEE SIZES: INLET: 6" UP, 13" DOWN OUTLET: 6" UP, 14" DOWN BED KITCHEN I�1111 ROOM BATH DINING FAMILY AREA ROOM BED BED LIVING ROOM ROOM ROOM EXISTING FLOOR PLAN Yarmouth Realth Department 11�)APIPRQJVEA ID Date ✓ERS WITHIN 6" FINISHED GRADE T MAX. COVER (1' MIN) ELEV. D -BOX ELEV. (6" OF STONE UNDER OR MECHANICALLY COMPACTED) ELEV. - GAS BAFFLE AT OUTLET TEE 2" PEASTONE OR F - 3/4" - 1 1/2" DOUB WASHED STONE INSPECTION I H —25'x 12.8' 2 - 500 GALLON CHAMBERS WI' 4' OF STONE ALL AROUND (25'x 12.8'x 2' DEEP) NO GROUND WATER ENCOUNTERED NOTES: 1. VERTICAL DATUM: ASSUMED 2. MUNICAPAL WATER IS AVAILABLE. 3. SCHEDULE 40 - 4" PVC PIPE TO BE USED THROUGHOUT SEPTIC SYSTEM. 4. ALL PRECAST UNITS SUBJECT TO TRAFFIC LOADS TO CONFORM WITH AASHTO H-20 SPEI 5. PIPE PITCH = 1/4" PER FOOT (UNLESS NOTED OTHERWISE). 6. FIRST 2' OF PIPE OUT OF D -BOX TO BE SET LEVEL. 7. THE SEPTIC SYSTEM HAS NOT BEEN DESIGNED TO ACCOMODATE THE USE OF A GARBAG 8. ALL CONSTRUCTION DETAILS ARE TO BE IN CONFORMANCE WITH THE STATE OF MASS. E CODE (TITLE FIVE) AND LOCAL HEALTH REGULATIONS. 9. CONTRACTOR TO VERIFY LOCATIONS OF ALL UTILITIES PRIOR TO CONSTRUCTION. 10. GROUND COVER OVER ALL SEPTIC SYSTEM COMPONENTS NOT TO EXCEED T WITHOUT 11. FIELD SURVEY PROVIDED BY TERRY A. WARNER, P.L.S., HARWICH, MA. 12. THIS PLAN REQUIRES THE REVIEW AND APPROVAL OF ONE OR MORE TOWN DEPARTME' IS SUBJECT TO CHANGE UNTIL SUCH TIME. THIS PLAN HAS BEEN PREPARED FOR THE S PURPOSE OF CONSTRUCTION OF A NEW SEPTIC SYSTEM AND DOES NOT NECESSARILY REPRESENT A FULL DETAILED PROPERTY SURVEY. 13. EXISTING CESS POOLS ARE TO BE PUMPED AND FILLED WITH SAND OR REMOVED. 14. D -BOX TO BE WATER TESTED TO ENSURE LEVELNESS AND EQUAL FLOW. SITE PLAN TH-1 102.0 TEST HOLE LOGS O/AHORIZON ELEV. ENGINEER: THOMAS McLELLAN, P.E. 12" LOAMY SAND 10YR 3/3 101.0 WITNESS: AMY VON HONE, R.S. DATE: 1-18-18 PERCOLATION RATE: < 2 MIN/IN 36" B HORIZON PEF LOAMY SAND 10YR 5/8 99.0C HORIZON PREPARED FOR: MEDIUM SAND JAN SULLIVAN 2.5Y 7/4 NO GROUND WATER ENCOUNTERED NOTES: 1. VERTICAL DATUM: ASSUMED 2. MUNICAPAL WATER IS AVAILABLE. 3. SCHEDULE 40 - 4" PVC PIPE TO BE USED THROUGHOUT SEPTIC SYSTEM. 4. ALL PRECAST UNITS SUBJECT TO TRAFFIC LOADS TO CONFORM WITH AASHTO H-20 SPEI 5. PIPE PITCH = 1/4" PER FOOT (UNLESS NOTED OTHERWISE). 6. FIRST 2' OF PIPE OUT OF D -BOX TO BE SET LEVEL. 7. THE SEPTIC SYSTEM HAS NOT BEEN DESIGNED TO ACCOMODATE THE USE OF A GARBAG 8. ALL CONSTRUCTION DETAILS ARE TO BE IN CONFORMANCE WITH THE STATE OF MASS. E CODE (TITLE FIVE) AND LOCAL HEALTH REGULATIONS. 9. CONTRACTOR TO VERIFY LOCATIONS OF ALL UTILITIES PRIOR TO CONSTRUCTION. 10. GROUND COVER OVER ALL SEPTIC SYSTEM COMPONENTS NOT TO EXCEED T WITHOUT 11. FIELD SURVEY PROVIDED BY TERRY A. WARNER, P.L.S., HARWICH, MA. 12. THIS PLAN REQUIRES THE REVIEW AND APPROVAL OF ONE OR MORE TOWN DEPARTME' IS SUBJECT TO CHANGE UNTIL SUCH TIME. THIS PLAN HAS BEEN PREPARED FOR THE S PURPOSE OF CONSTRUCTION OF A NEW SEPTIC SYSTEM AND DOES NOT NECESSARILY REPRESENT A FULL DETAILED PROPERTY SURVEY. 13. EXISTING CESS POOLS ARE TO BE PUMPED AND FILLED WITH SAND OR REMOVED. 14. D -BOX TO BE WATER TESTED TO ENSURE LEVELNESS AND EQUAL FLOW. SITE PLAN MAS J. McLEkVAN, P.E.I I P.O. BOX 1163, EAST DENNIS, MA 508-364-9048 TER FABRIC 99.31 96.48 ELEV. DISPOSAL. /IRONMENTAL AND K, MA ALE: 1" = 20' FG 1 LOCATION: 11 YACHT AVE. W. YARMO PREPARED FOR: JAN SULLIVAN DATE: 1-24-18 BASS RIVER ENGINES MAS J. McLEkVAN, P.E.I I P.O. BOX 1163, EAST DENNIS, MA 508-364-9048 TER FABRIC 99.31 96.48 ELEV. DISPOSAL. /IRONMENTAL AND K, MA ALE: 1" = 20' FG 1