HomeMy WebLinkAboutEngineered Plan - 2017ASSESSORS MAP:
rnliccLl � ��
►�. /.� FLOOD
�Eli2. q_.'!D REFERENCE: - '/59-V - .tX&4 A I b is _\_-
Te
01
1
LOCATION MAP
t\
TEST HOLE LOSS'"
n
��kVA,,�
I) The installation shall cornptvith'1'itlt
V and Town ofd(iV(�I}C�' Board of
SO I L EVALUATOR :W
•
I lealth Regulations.
WI TNESS •
2) The installer shall verify the location o 7utilities,
sewer inverts and septic
DATE:
components prior to installation and seting
base elevations.
PERCOLAT I ON MT : .e_10''" 1
t
3) All gravity septic piping to be 4 inch S
h 40 PVC at 1/8" per foot. The first
1 P. g��� 1' � r '
two feet out of the d -box to the ieach4
shall be level.
TH-I TH=2
4) This plan is not to be utilized for propelty
line determination nor any other
purpose other than the proposed systen
installation. I
�'
5) All septic components must meet Title
specifications.
6) Parking shall not be constructed over H
7) The bounded by
10 septic components. ;
'
y�
�i
property is property corners
8) The property owner shall review design)
and property lines.
considerations to approve of total
'J
-14
design flow and number of bedrooms to be considered for design. Receipt i
of payment for the plan and installation` based on the plan shall be deemed
C.approval
r%
of the design flow by the own
9) The leaching
r.
existing or cesspools sliall
be pumped and filled with material
per Title V abandonment procedures. T
pose within the proposed SAS shall
be removed along with contaminated so
I and replaced with clean sand per
Title V specs.
i
10) System components to be 10 feet fromater
water line shall be sleeved with 4 inch
line. Sewer !fines crossing the
51140 PVC with ends grouted if
'
applicable. The proposed SAS is being
nstalled below (lie water service
'
SEPT f C SYSTEM DESIGN
line. The line is to be sleeved as aforemEdoned
11) If a garbage grinder exists it is to be rettioved
and maintained in place.
and is the responsibility of the
owner to ensure such:
FLOW ESTIMATE
12) The installer is to take caution in excavation
around the gas line if such '
B DROOMS AT ID GAL/DAY/BEDROOM - - 7iO GAL/DAY
exists.
13) Tine installer shall verify the location, quntity and elevation of the sewer I
lines exiting the dwelling'prior to the ins allation.
SEPTIC. TANK
14) This plan is representative only that a systtem can fit on a property meeting
f
Title V requirements.
Y-9-0 GAL/DAY x 2 DAYS - GAL
USE ; GALLON ,SEPTIC TANKY�,�flWtr)�j'''j
SOIL �iBS RPTION SYSTEM
r
S I DE AREA: Z -#- L�►.
BOTTOM AREA: q275 5 1�G -
SEPTIC SYSTEM SECTION
X • ? % ! o DAVIDB.
l'.j `1 ?jZ✓7 MASON m
No. 1066
T,E�
GAL
SEPT I C TANK '`
LMEALTHDEPT
IVED.
8 2017
Lj
er i
IV Q AM
34
�r
S(TE AND SEWAGE PLAN
LOCATION .. IoI & W ��•��%�
Yarmouth Health Dep"nrtmcmt
P 121
(� � r U
PREPARED. ,.FOR : I
Ninme Date
A 1
SCALE:
DAVID Bi MASON DATE: lO
DBC ENVIRONMENTAL DESIGNS
EAST SANDWICH MA
DATE HEALTH AGENT. ( 508) 833= 2 177: