Loading...
HomeMy WebLinkAboutEngineered Plan - Rev. 2018b w ASSESSORS MAP: g TEST HOLE :.LOG$ PARCEL: j (o I) The installation shall comj.'� with Title V and Town of *04 Hoard of F i FLOOD ZONE: Qlfrl SOIL EVALUATOI : I 1 [ealth Regulations. WITNESS:- 2) The installer shall verify the location of a ilities, sewer inverts and septic REFERENCE:tet- DATE: ,h mponents prior to installation and setting base elevations. Y 1fJ�y„� PERCOLATION RATE •L. 111 It 3) All gravity septic piping to be 4 inch Sch X10 PVC at 1/8” per foot. The first -- - - - --- � two feet out of the d box to the Teaching s all be level. et 4) This plan is not to be utilized for property line determination nor any other TH- I TH-2 nnrnnea mt— fh.., fhm nrn»neait evetar 1" +4 11..ti.... 5) All septic components must meet Title V 1pecifications. 6) Parking shall not be constructed over H10 septic components. j 7) The property is bounded by propertycorn�rs and property lines. 8) The property owner shall review design considerations to approve of total b design flow and number of bedrooms to b� considered for design. Receipt of payment for the plan and installation based on the plan shall be deemed approval of the design flow by the owner. 9) The existing leaching or cesspools shall bt pumped and filled with material per Title V abandonment procedures. Those within the proposed SAS shall 4 be removed along with contaminated soil and replaced with clean sand per Title V specs. 10) System components to be 10 feet from water line. Sewer lines crossing the water line shall be sleeved with 4 inch SC 140 PVC with ends grouted if j applicable. The proposed SAS is being installed below the water service line. The line is to be sleeved as aforemei Boned and maintained in place. ,peva SEPT I C SYSTEM DES I GN 11) If a garbage gren der exists it is to be removed and is the responsibility of the owner to ensuresuch, FLOW . EST 1 MATE 12) The installer is to take 'caution in excavati n around the gas line if such exists. I 2 OD- GAL/DAY13) Tne installer shall veri the location uafttit and elevation of the sewer BEDROOMS AT GAL/DAY/BEDROOM fY. �q Y lines exiting the dwelling'prior to the instEllation. SEPTIC TANK 14) This plan is representative only that a system can fit on a property meeting r �- ► Title V requirements. _ VGAL/DAY x 2 DAYS -� GAL r USE IWO. GALLON SEPTIC TANK EVQ551 W41 1 _ L p/ ; y � �t SOIL ABSOR'PI' ON --SYSTEM �! � W SIDE . AREA:: 'LX Zfp �-l' �2►Q�?J� X Z X 1 ?. I + o=ff DAVID 4 ` % �� I BOTTOM AREA :' 2 x �2+ X O ,—f = Z��i, �,� MASON m �� \I ➢p,►\ "/'.-� l.v No -1066 0 OTA /Oc) SEPTIC SYSTEM SECTION O U f` 1 ,•0 ., , � Nvin _ xi� 2Of'InG Mei C��Siq 100C:>: GAL Ov ' SEPTIC TANK a, ,7(� 1 { 01 n _ I T ._. _ _ 7.9 • S I TE AND tEWAGE -PLAN LOCAT1 ON 4104 �T 11,0 PREPARED FORi?(G o , S ALE : W DAV I D B MASON DATE: P� Zti Z DBC ENVIRONMENTAL DESIGNS W DATE HEALTH AGENT EAST SANDWICH. M W (508) 33-2177 Z IZ 7-016 f4v - " 01 IV4 '0