Loading...
HomeMy WebLinkAboutEngineered Plans - 2017TOP OF FOUNDATION EL. 100.0' EL. 98.0' (DATUM: ASSUMED) 11=IIcI1 I1�IL�::11'11 41iiMEE11.=11 11 �� - • _ _ __ '11c11 I�'II II 1l- II II it ll.11l 11 11 lel I �I ILILCILILII` IIFLOW LINE � ��.>�1 �_•_ •-•r_..__..r_.._..r_-..__.._..r ..r_ -:.r � .:..:.r_...��:.r_.r:..r_..r_:.:_..r_:.r_:.� 1000 GALLON SEPTIC TANK (EXISTING) LOT 32 12,632 SFt CD 1 k 94 TEMP, SHED 94 1-1-20 DBOX I&M(VARIABLE) 6" CRUSHED STONE OR MECHANICALLY COMPACTED 16.9' 174.73' / TH-1 EXIST. S,T, LP EXIST. L.P, 42. TH-2 PIT 15.4' " 1 150. BENCHMARK: TOP OFFNDN EL. 100,01 DECK EXISTING 4 BR DWELLING laherty Environmental Services P.O, Box 81 Yarmouth Port, MA 02675 _ 774.994.1 966 .5' CLEAN, DOUBLE - SOIL ABSORPTION SYSTEM WASHED" TO 1 (2) TRENCHES 3'W X 441 X 2'D USING 4.6' PERFORATED PIPE AND SURROUNDED — BY DOUBLE -WASHED 3" TO 1" STONE EL. 86.01 BOTTOM OF TEST HOLE EL. 86.0' USGS ADJUSTMENT: N/A LOCATIONMAP GROUNDWATER ELEV: N/A N TH German Hill Rd. 98 r Gu. NUV U to y / a rt %YE�i� i �`➢ DEPT i. "C"•�- --SCG EDRD STONE NO 89 'G ?v� NTS I f1 �j Dutch/and Dr. .o J Rhine Rd. LOCUS Rt. 6 M/d-Cape H/ghway DAV v c ' .pz D LrZ 1`, t� i1Q JJ tI/ \y�� CRUSHED SHELL STO-k L_DRIVEWAY IT 9.\ X cc is DATE:11/95/2017 REVISED: �s Yarmouth Health Department PP OVED /Z —7 SITE AND SEWAGE PLAN FOR ame Date B & B EXCAVATION INC./ DAVID D. FLAHERTY JR. 42 RHINE ROAD SCALE: 1 = 40' YARMOUTH PORT, MA REP PB 467 PG 41 PAGE 1 OF2 GENERAL NOTES 1. ALL PRECAST COMPONENTS TO BE H-10 RATED. ALL COMPONENTS WITH ANY ANTICIPATED VEHICULAR TRAFFIC TO BE H-20 RATED. 2. THE DESIGN OF THIS SYSTEM DOES NOT ALLOW FOR THE USE OFA GARBAGE GRINDER. 3. MUNICIPAL WATER IS AVAILABLE. 4. ALL CONSTRUCTION TO CONFORM WITH 310 CMR 15.000 AND ALL OTHER APPLICABLE LOCAL, STATE AND FEDERAL CODES AND REGULATIONS, 5, INSTALLER/CONTRACTOR TO REVIEW & VERIFY ALL ELEVATIONS AND DETAILS AND REPORT ANY DISCREPANCIES TO DESIGNER PRIOR TO CONSTRUCTION OR ASSUME ALL RESPONSIBILITY. 6. INSTALLER/ CONTRACTOR IS RESPONSIBLE FOR MAINTAINING SAFE WORK AREA, VERIFYING ALL UTILITIES AND NOTIFYING "DIG SAFE" (1-888-344-7233) 72 HOURS PRIOR TO CONSTRUCTION. 7. ANY CHANGES TO OR DEVIATIONS FROM THIS PLAN MUST BE APPROVED IN WRITING BY FLAHERTY ENVIRONMENTAL SERVICES AND LOCAL BOARD OF HEALTH. 8, FINISH COVER OVER COMPONENTS IS NOT TO EXCEED 3' PER 310 CMR 15.000 UNLESS SHOWN PER PLAN. 9, ALL ABANDONED SEPTIC SYSTEM COMPONENTS TO BE PUMPED DRY AND FILLED WITH CLEAN SAND OR REMOVED AND REPLACED WITH CLEAN SAND. 10.ALL COMPONENTS TO BE PROVIDED WITH WATERTIGHT ACCESS PORTS WITHIN 6" OF FINISH GRADE. 11.ALL SEPTIC TANKS, DISTRIBUTION BOXES AND PIPING TO BE INSTALLED WATERTIGHT. 12.NO KNOWN WETLANDS OR WELLS WITHIN 100 FEET OF PROPOSED LEACHING. 13. THIS IS NOT A CERTIFIED PLOT PLAN AND UNDER NO CIRCUMSTANCES IS THIS PLAN TO BE USED FOR ZONING OR BUILDING PURPOSES. 14. LOT IS SHOWN AS ASSESSOR'S MAP 107 PARCEL 41, 15. LOCUS PROPERTY`S PROPOSED SYSTEM APPEARS TO BE PARTIALLY WITHIN AN AQUIFER PROTECTION DISTRICT (ZONE II). DESIGN CALCULATIONS NUMBER OFACTUAL BEDROOMS 4 GARBAGE DISPOSAL UNIT NO TOTAL ESTIMATED FLOW LS 10 YR 2/1 (110 GAUBR/DAYX4 BR) 440 GALADAY REQUIRED SEPTIC TANK CAPACITY 880 GAL. SIZE OF SEPTIC TANK 1000 GAL. (EXISTING) SOIL CLASSIFICATION 1 DESIGN PERCOLATION RATE < 5 MIN.ANCH EFFLUENT LOADING RATE 0.74 GALADAY/FT2 LEACHING AREA 31"-41" BOTTOM. (3'X 44) X 2 = 264 F7-2 SIDES. 41"-120" [(2'X44)X2+(2'X39X21X2= 376 FT- TOTAL = 640 FT2 X 0.74 = 473 GAUDAY USE (2) TRENCHES OF PERFORATED PIPE SURROUNDED BY j" TO 1 J"STONE, EACH TRENCH CONFIGURED AS X WIDE X 44' LONG AND 2' DEEP RESERVE LEACHING CAPACITY N/A SOIL EVALUATION TEST HOLE #1 Evaluator: David D. Flaherty Jr., RS, REHS LS 10 YR 2/1 SE#2755 BOH Witness: Phil Renaud, BOH Date: November 15, 2017 TH-1 ELEV. 96.0' 0"- 31" FILL 31"-41" AIB LS 10 YR 3, EL. 926' 41"-120" C MS 25Y614 5 % cobbles G. W. ELEV. N/A BOTTOM TH-1 ELEV. 86.0' Ci SYSTEM DETAIL nnc- r)nn-r Flaherty Environmental Services (NTS) TEST HOLE #2 Evaluator: David D. Flaherty Jr., RS, RENS SE#2755 BON Witness: Phil Renaud, BOH Date: November 15, 2017 TH-2 ELEV. 96.0' 0"- 12" 12--24- 24--34- ,W'- 1202" 2"-24"24"-34"34"-1202" G.W. ELEV. WA BOTTOM TH-1 ELEV. 86.0' FILL AIE LS 10 YR 2/1 B LS 10YR 6/6 C MS 25Y6/4 5 % cobbles EL. 91.7' 9' MIN. OF S❑IL 2' PEAST❑NE OR FILTER FABRIC P. 0. Box 89 Yarmouth Port, MA 02675 774.994.9 966 TRENCH END VIEW certify that on November 12, 2002, I have passed the examination approved by the Department of Environmental Protection and that the above analysis has been performed by me consistent with the required training, expertise, and experience described in 310 CMR 15.018(2)." PERC BOTTOM OF PERC AT 52" 15 min. soak 12--9- = 6 mins 9"- 6" = 10 mins Pero Rate = <5minsrnch SITE AND SEWAGE PLAN FOR B & B EXCAVATION INC./ DAVID D. FLAHERTY 1R. 42 RHINE ROAD YARMOUTH PORT, MA PAGE2 0F2