Loading...
HomeMy WebLinkAboutEngineered Plan - Rev. 2018ASSESSORS MAP , 4 PARCEL: µ TEST' HOLE LOGS ! , ��j _ 0 3 t + 1) The installation shall cornp� with Title V and Town of FLOOD .ZONE; /`!o/ ,c���/G �jL•� , S I L, EVALUATOR • V� �/ Health Board ol. j --- ---'- E S • He Regulations. . W I TNS q VC) ' g REFERENCE ..�E �# Zzv�� �,QC+` Zf�' DATE:'+ --; �/ 2) The installer shall verify the location of utilities, sewer inverts and septic I r components prior to installation and setting base elevations. J -(3C) ;PERCOLATION RATE: L. Z l� 1 � r_3) All bravity septic piping to be 4 inch Sch 40 PVC at 1/8" per foot. The first LD `:ll,t'. two feet out of the d -box to the it: chi shall be level TH= I TH-2 4) This plan is not to be utilized for property line determination nor any other po 5. purpose other than the proposed system installation. ;t It33 I 5) All septic components must meet Title V specifications. q 1 6) Parking shalt not be constructed over H10 septic components. � r +, �b ;�"✓ i 7) The property is bounded by property corners and property lines. 1 f g P P Y . ! LOCATION MAP ) The property owner shall review design considerations to approve of total I ' I design flow and number of bedrooms to be considered for design, Receipt of payment for the plan and insta P Y P llatton based on the plan shall be deemed approval of the design flow by the owner. �(� it.`�' 9) The existing leaching or cesspools shall be pumped and filled with material per Title V abandonment procedures. Those within the proposed SAS s P P hall � be removed along with contaminated soil and replaced with clean sand per ' Title V specs. i 10) System components to be 10 feet from water line. Sewer !fines crossing the water line shall be sleeved with 4 inch SCSI 40 PVC with ends grouted if / I The d applicable. o e li a ie pr pos SAS is being installed below tire water service line. The line is to be sleeved as aforementioned and maintained in place. -----... -- - -v--- SEPT I C SYSTEM* DES I GN is be rem � %7. � ----� --- _ : 11) owner ato ensure surhexis removed and is ns t is it ' to ed a is responsibility of he FLOW E3T 1 MATE ! 12) The installer is to take caution in excavation around the gas line if such' exists. I BEDROOMS AT IID GAL/DAY/BEDROOM - GAUDAY 13) Tne installer shall verify the location' quantity and elevation of the sewer i k� lines exiting the dwelling prior to the installation. I' SEPTI C 'TANK 14)This plan is representative only that a system can fit on a property meeting I I' Title V requirements.: Gf';L/DAY x 2 DAYS (�� GAL _.i.iKlf1. USE I �� GALLON'SEPTIC TANK l SOIL AUS0APTi0N SYSTEM 04AXaCd�-� labor, MM __ i I DE . AREA Z -l- i �j pAVID fIg B. G 1. N I>�•TTOM AREA. b c—I �jlet ME MASON m l: i v NO. 1066IQ o Gni f == �- q �, C EPT—L,. SYSTEM M SECT I ON � m o u�Zola o HFALT H W i r Fja _ �. r b - _GAL SEPTIC TANK --6 `1wo ►4�eat� i SITE AND SEWAGE PLAN ;}} LOCATION Z •�I-1J 1 �5FQE.�n 97,0 lth, Department a 00 p ID � PREPARED FOR: dinp■T®q♦p i SCALE:• ! I I DAV I D B , MASON DATE: 11Z l DBC ENVIRONMEN AL DESIGNS DATE HEALTH AGENT EAST SANDWICH. MA t08) 833-2177 �j �- `'