Loading...
HomeMy WebLinkAboutEngineered Plan - 2001MANHOLE COVERS TO EXTEND TO WITHIN 6" OF FINISH GRADE GAS BAFFLE REQ'D rl% NEW DIST. BOX REQ'D Li 11 - 11 D. B. LLJ U \ 46.41 D, B. ui w L NEW Li 46.3 I- -4 �61 5�p I 4 1,500 GAL t .1 . 1 r C6USH'ED 6 6 6bNE 6' CRUSHED STONE SOIL TEST LOG PERC RATE- < 2 MIN INCH ELEV.= 49.00 --ILL � LOAMY SAND 10YR 4/1 B LOAMY SAND 10YR 7/6 C MED SAND 10YR 8/3 120" 30 II SOIL TEST CONDUCTED ON SEPT 19, 2001 3- BY HUNTER ENGINEERING ASSIJU. WITNESSED BY: AMY VON HONE YARMOUTH HEALTH DEPARTMENT NO WATER OBSERVED ;EXISTING CONTOUR — — — 49 WATER SERVICE —W—W TEST HOLE BENCH MARK 1131 BM CESSPOOLS CP SPOT ELEV 49.0 NOTE: likl�;! CONTRACTOR SHALL PUMPOUT CESSPOOLS AND BACKFILL W/ CLEAN SAND 45.27' 20' MIN. -PROPOSED SEPTIC SYSTEM NO SCALE (SAS) SI-11�`,:_L BE 34-25' t!:'4G 11. o' v,,, 10" DEL, - NEVA` EI-P NEW ELEV=-46.62' 2" PEAS -')NE TOFPING .----CAP LI'DS -1/?" DOUBLE Y/ASHEtc 1t) STONE ALL AROUND f 311.25' 1.5' - --- ro 77VW FIVE (5) INFILTRATORS - STONE @ SIDES V P 4' O(-- c- 15 OF S-rnNE @ ENDS pI - 'FOP FND 50.00 Oil D SAGA DRIV_ L PI&AA A PLAN ll) -2n) j" OF A JOHN P. 9cy 0 o HUNTER R CIVIL 0 No. 36445 LOCUS PSP hIIIjS) h' LOCUS MAP GENERAL NO -FES: ELEVATIONS SI -OWN BASED ON U.S.G.S. DATUM. SYSTEM FIPE SHALL BE EITHER' C.I. OR SCHEDULE 40 P.V.C. THE BOARD OF' HEALTH SH/' 0_1 BE NOTIFIED PRIOR 1-0 BAC<FILLING OF SEPTIC SYS -11 -EM. SEP -11C SYSTEV STRUCTUR/kL COk.PONEiITS SHALL BE CAPABLE OF WITHS-.1-AINDING- A H-10 LOALING, UNLESS SPECIFILD OTHERWISE SEPTIC SYSTEM UiIDER !)RIVEWA',S SHAL'L' COMPLY WITH ."\ H-20 LOADING. —TH'L--- '_)ESIGN AND COMPONLN'I-'---)' OF THE SEPTIC SYSTE;'vl SHALL BE IN COQ,IPLI/I,NCE WITH THE STATE OF i',,AASSACHUSETTS SAI,lliA'RY CODE TITLE V, AND 'SHALL BE IN ( - OM; ­'l 1/,,NCE WITH THE LOCAL 3�'_ARD OF HEALTH RULES /,,ND REGUl.._/JlIC,i,:iS. THE CON_`,(ACI OR SI TALL BE RLSPOHSIBLE FOR LOCATION OF !{LL UNDERGROUND) UTILITIES AND Si -!AL .- f"I(.)TIc_y D!G - SAFE TO NO ''ARLA")E C"RINDER DESIGN C"RITERIA DESIGN FLOW 3 BEDROOMS AT 110 G.P.B. / DAY 330 G.P.D. REQUIRED SEPTIC TANK: NEW 1,500 GAILC�J__ SEPT!(" TANK PROVIDED NONE DESIGN PERCI RATE <2 MIN/INCH ,SIZE OF REQD (SAS) AREA - 330/0.7r ==. 4,6 E SIDEWALL (2)(0.83)(34.25)+('9-)(0.8,3)(11)=75.12 S BOTTOM (11)(34.25) :7, 3 / 1 �1'1.7 -S.F. j r- .. SIZE OF LEACHING FACILITY PR,.,./ADED: 376.75 S.F. + 75.12 S.F. 451.87 S.F. 334.4 4., G PD EFFECTIVE DEPTH: 10" EFFECTIVE LENGTH: 34.25' EFFECTIVE WIDTH: 11.0' CONSULTING ENGINEERS - D 7 WEEKS POND DRIVE 3 20011 SANDWICH, MA 026D1 7 (508) -,+il`--8268 epl OCT7HECATLTH DEPT. Hunter Engineering Ass)ciates, Inc. PROJE T: SEF',TIC SYSTEM REPAIR P 1_4.' FOR 2 OLD SAC;", DRIVE AS SHOWN DATE: c iv',AP 111 / LOT' 9 )/26/01 _VISED F;': 0,.,A/ N E f R: JOSEPH & PHYLLIS '.1CGONAGLE 4 STONEWA" D'-'IVE LYNNFIELD, ILIA 01940 FILE: