Loading...
HomeMy WebLinkAboutEngineered Plan - 2018T m 0 0 W W 0 5 U Z 3 t ASSESSORS MAP:`j�j PARCEL: FLOOD ZONE: -- _ N REFERENCE:_��� LOCATION MAP J.: TEST HOL.ELOGSr .., n l) The installation shall cornt7� 4vith Title V a�►J 'Town of Board of SOIL EVALUATOR . ��I� I lealth Regulations. WI TNESS : ow 2) The installer shall verify the location of utilities, sewer inverts and septic DATE:- KYEIL, 111 LO lt7 I components prior to installation and setting base elevations. PERCOLATION RAT 1 3) All gravity septic piping to be 4 inch Sch 40 PVC at I/8" per foot. The first !-��o two feet out of [lie d -box to the leaching shall be level. �'v- 4) .This plan is not to be utilized for property line determination nor any other TN= I TH= 2 ; purpose other than the proposed system installation. 5) All septic components must meet Title V specifications. ! 1 6) Parking shall, not be constructed over 1-110 septic components. 7) The property is bounded by property corners and property lines. 8) The property owner shall review design considerations to approve of total design flow and number of bedrooms to be considered for design. Receipt 1' of payment for the plan and installation based on the plan shall be deemed r , approval of the design flow by the owner. 9) The existing leaching or cesspools shall be pumped and filled with material per Title V abandonment procedures. Those within the proposed SAS shall be removed along with contaminated soil and replaced with clean sand per Title V specs. k , 10) System components to be 10 feet from water line. Sewer lines crossing the i water line shall be sleeved with 4 inch SCf 140 PVC with ends grouted if applicable. The proposed SAS is being installed below the water service line. The line is to be sleeved as aforementioned and maintained in place. SEPT I C :SYSTEM DES I GN 11) If a garbage grinder exists it is to be removed and is the responsibility of (lie owner to ensure such. FLOW ESTIMATE 12)The installer is to take caution in excavation around the gas line ifsuch I exists. Z BEDROOMS AT 1 GAL/DAY/BEDROOM - GAL/DAY 13) Tae installer shall verify thelocation, quantity and elevation of the sewer lines exiting the dwelling prior to the installation. 14) This plan is representative only that a system can fit on a property meeting SEPTIC TANK Titlr e. V requirements. 2ZUGAL/DAY x 2 DAYS -GAL USE DOD GALLON ;SEPTIC TANK EY:,j 51WLr) T- OOPT-ION—SYSTEM S l CSE AREA: �( Z -f Zi . �- x I.7 I 117 0�� DAVID BOTTOM AREA: MASON m ` v p�No.106 6� Gyj SEPT I C SYSTEM SECT I ON i�1547, l w two bGAL 1� D SEPTIC TANK., D eXWAb , SITE AND SEWAGE PLAN LOCAT I ON: � 9 �S7A,j 0 ^PcV 6D Y rmouth Health Department VD x PREPARED FOR: L4D 1L,4 Al�� Gad �-�-✓ �(� '—�`T ill'' ` Name Date �\ SCALE:za4l 1(7 -AX-- !' DAVID B MASON b DATE: ll Zai DBC ENVIRONMENlfAL DESIGNS HATE HEALTH AGENT EAST SANDWICH,. MA (508) 833-•2177 f e � ; r i