Loading...
HomeMy WebLinkAboutEngineered Plan - 2018TOP OF FOUNDATION ELEV. _ 1_0900__-\ (ASSUMED) 4.4t i SLAB ELEV. = Q�•22t 4 FEET 5 FEET 6 FEET 7 FEET 8 FEET LEGEND: Ml WES, 20 FT. MINIMUM FROM CELLAR OR CRAWL SPACE DATE OF SOIL TEST MARCH 22`2018 __ 10 FT, MINIMUM 10 FT. MINIMUM FROM SLAB ; CLEAN SAND SOIL TEST DONE BY SWEETSER ENGINEERING CONCRETE ! WITNESSED BY _A._VQN MANE-_--__-_ INSPECTION PORT COVERS 4" SCHEDULE 40 PVC PIPE �COAM AND SEED P��*` }'' -1�' °''� ? ELEV.=__95.09 MIN. PITCH 1/8" PER FT. 2" LAYER OF +� "''"' aZ e: x ` �' 1/8" TO 1/2" PERCOLATION RATE :_ 2__ MIN./INCH AT 44 INCHES 6'MAX.. WASHED STONE r--------- AX. 95.0 MAX. OR FILTER FABRIC VENT I DEPTH I HORIZ TEXTURE COLOR MOTT. OTHER 4" CAST IRON PIPE 6" MAX. 93.75 MIN. NOT REQUIRED '0-8" A LOAMY SAND 10YR4/1 NO ROOTS (OR EQUAL) MINIMUM PITCH 1/4" PER FT. FLOIh' TEE Z fB LOAMY SAND 10YR7/4 ROOTS _ LEVELERS 4} 121-132" iC COARSE SAND 2,5Y7/4 FLOW LINE 93.0 µ °' NO WATER ENCOUNTERED AT -132" ELEV. = 84.09 ELEV. 95_6±- r�0" 6" SLEEVE ELEV. _ _95.20_ 210,. . ° LEVEL ° ° "00101 0 ELEV. _ _91.67_ DESIGN C �`,i. �, LAMONS ELEV, = 95.37 ADD GAS 6" SUMP _ _ ° BAFFLE ELEV. _ _ 92_67 ELEV. = 92.0 NUMBER OF BEDROOMS 3 6� IE g $a GARBAGE DISPOSAL UNIT�- •"+ ELEV. _ ¢HIGH CAPACITY INFILTRATORS WITH TOTAL ESTIMATED FLOW OUTLET l: _�Z,. 2Q_ STONE IN AN � ( 110 GAL/BR./DAY X __3 BR.) --330- GAL./DAY TEE (EXISTING) ! z REQUIRED SEPTIC TANK CAPACITY _-O-GQ-GQGAL, 14 INCHES TO BE WATER TESTED ! 7.58 EXISTING 100 GAL. 19 INCHES $- f IF MORE THAN ONE OUTLET it X 35 X 10 TRENCH FORMATION ; 1 N ACTUAL SIZE OF SEPTIC TANK (EXISTING) _ 24 INCHES i 0 st •1 : , ti I `�' 1 WELL SOIL CLASSIFICATION 29 INCHES - �,! �. (TO BE PLACED ON FIRM BASE) � SO # t I NULL N A DESIGN PERCOLATION RATE <_,�� MIN./IN. ZONE 34 INCHES *10 r!`* 3/4" TO 1 1 /2" CLEAN �,r ^�^! INDEX EFFLUENT LOADING RATE Q,Z4_ GAL./DAY/S.F. S"(ST C E ir, ( ��� g LEACHING AREA AMAM SQ. FT. DOUBLE WASHED STONE ADJUST - .(11X35)+(47X2X10/12) FREE OF FINES & SILT LEACHING CAPACITY (AREA X RATE) X5100 GAL./DAY t� �,fia.�1., Imo,. ��:P- USGS PROBABLE WATER TABLE ELEV, = ------ 474.33 X 0.74 .. �;- +��-' » 1 *� I �-<'Y ILE OBSERVED WATER TABLE ( / / }ELEV. _ RESERVE LEACHING CAPACITY NQNE GAL./DAY NOT TO SCALE BOTTOM OF TEST HOLE ELEV. = EXISTING SPOT ELEVATION 00,0 EXISTING CONTOUR----00---- FINAL SPOT ELEVATION 00.0 FINAL CONTOUR - SOIL TEST LOCATION UTILITY POLE -O- TOWN WATER -W ��1"Ja------ CATCH BASIN GAS LINE " CLEAN OUT C. CESSPOOL C.P.0 ' 2 9 WF F �au Mme -` 1. ALL WORKMANSHIP AND MATERIALS SHALL CONFORM TO D.E.P. TITLE 5 AND THE TOWN'S RULES AND REGULATIONS FOR THE SUBSURFACE DISPOSAL OF SEWAGE. i ` 2. ALL COVERS TO SANITARY UNITS SHALL BE BROUGHT TO WITHIN 6" OF FINISHED GRADE. 3. ALL COMPONENTS Or THE SANITARY SYSTEM SHALL BE CAPABLE OF s Pte( , ` WITHSTANDING H-10 LOADING UNLESS THEY ARE UNDER OR WITHIN ��°� ,+ 10 FT. OF DRIVES OR PARKING AREAS. H-20 LOADING SHALL BE 82� SOIL USED UNDER OR WITHIN 10 FT. OF DRIVES OR PARKING AREAS. 143• p 1 !�EOts�`�\P2 a 4. ANY MASONARY UNITS USED TO BRING COVERS TO GRADE SHALL TEST 94.4 % r savoy ` BE MORTARED IN PLACE. 36 .00 5. NO DETERMINATION HAS BEEN MADE AS TO COMPLIANCE WITH o DEEDED OR ZONING REGULATIONS. OWNER / APPLICANT IS TO � OBTAIN SUCH DETERMINATION FROM APPROPRIATE AUTHORITYTION _. ' 96.71 --, 6 ISLITIES SHTO CALL "DIG -SAFE" FAT 1 888 04L 7233 AT LEAST 72 HOURS PRIOR TO COMMENCING WORK ON SITE. BOX 7. CONTRACTOR IS TO VERIFY GRADES AND ELEVATIONS AS WELL AS til '~� rtUK SITE CONDITIONS PRIOR TO COMMENCING WORK ON SITE, ANY VARIATION 95.6 �� pF t� 4� IS TO BE BROUGHT TO THE ATTENTION OF THE DESIGN ENGINEER QQ �ai� IMMEDIATELY. �- 98. `1�6 7 �3 n` . 8. PARCEL IS IN FLOOD ZONE _ pgN o X 6 0 - - R t �-`�'. _-9. LOT 1S_SHOWN ON ASSESSORS MAP ._-__§!' PARCEL 3 97.25; i gy 198•� K: 0 U' 10. EXISTING PIT IS TO BE PUMPED AND BACKFILLED WITH SAND. r ..,.._r , f ` �� �1 c� 11. WASTE LINE FROM TANK TO SOIL ABSORPTION SYSTEM IS TO BE PLACED 98 Y5< = - 96.2 _.. o• �4 w INSIDE A 6" 150 PSI PRESSURE PIPE AS SHOWN AT LEFT OVER WATER SERVICE. FG1S� 97.7 �.� • 1�S�ONAt 97 ,SHED '1 � -`Y.7 98 �3 97.8 97.7 } y ' ' 00vl 6 GALLON s 1.: Yf rmaouth Health Department SEPTIC TANK P 1 LOT 2 4 t 99tz�.3 15, 733.4 f S.F. o Marne Date �.f:'�i' � !f ,--------- 98.5 ��;~ """'. / � � 97.4 I ,` - 96.7 98'11 97,6 I DATE AGENT _ f • X7.7 �7 -.� K. "-' x p.'.M� YY(�a$�A 4� litl V4 Yi' Y A�. w plat p y " !f b.Y' i R 71 . 4 Y'v i Y. i?. "f �T i x 98.28 �- a p° s iF M "RI 5 5 4 ' yS 98.5 a <�-" gz �� Ut-R� . � 3i4,fAS'3. (, s� 6u, � e b�.� :: FOR 117. i 1 41MY� #I�i�el�1 'FYI 01■ , 5 I ss LOOS;.a #^? 1 t tl� 5177 . i S' ISLAND 203 SETUCKET ROAD - -- 508- P. 0. BOX 713 385-6900 SOUTH DENNIS, MASS. 02660 R� DATE MAR. 26, 2018 SCALE 1„ = 20' -� REV. JOB N0. F 9 4 0 0 LOCATION MAP (REV. i� SHEET 1 OF 1 C.SB PP,O✓ 7994 -OD dw X7994-SAS.DWG 0 2018 S'O,`EETSER ENGINEERING