HomeMy WebLinkAbout2018 Apr 20 - Sign Off Transmittal, Plans - Garage Addition, Remodeloti TOWN OF YARMOUTH
HEALTH DEPARTMENT
PERMIT APPLICATION SIGN OFF TRANSMITTAL SHEET
♦U♦V � To a completed by Applicant:
l n
uilding Site Location: G v .'t � I `/ ck k
oN o , 1+ o > '
Proposed Improvement: ( o
OVC✓'
Applicant: J �� ✓,
Address:
**Ifyou would like a-m ' n
Owner Name:
Owner Address: Q
of sign off, please provide e-mail address:
_Tel. No.: 5-6 -7 12 5
Date Filed: 7 ( i
Owner Tel. No.: c) _2SS - 3 i Y- rogzU
------------............................................................................................................
RESIDENTIAL AND/OR COMMERCIAL BUILDING
HEALTH DEPARTMENT: Determines Compliance to State and Town Regulations; i.e., Requirements
For Septage Disposal and other Public Health Activities.
Please submit three (3) copies of plans, to include:
(1.) Site Plan showing existing buildings, water line location,
and septic system location;
(2.) Floor plan labeling ALL rooms within building'
(all existing and proposed) --
Note: Floor plans not required for decks, sheds, windows, roofing;
- (3.) If necessary, Title 5 application signed by licensed installer
with fee.
............................................................................._.........................................................................................................................................................................................................................................................................................
REVIEWED BY:
COMMENTS/CONDITIONS :
PLEASE NOTE
.iPC G 0 i� owl
DATE: / — � 0 [ a -
11v^a cA7
iP 133
T 36
NOTES:
1. LOT LINES BASED ON L.C. PLAN 23134 C SHEET 2
2 HOUSE SURVEY AND WETLAND EDGE DASED ON "PROPOSED SEPTIC
SYSTEM UPGRADE, MARCH 22,2011"
CCrS'CfldEFP)
O 90 20 40 80 FEET
APR 2 0 20'18
HEALTH DEPT.
-SCALE-
PROJECT TITLE: Proposed Renovation at:
PROJECT N0:
14 Dauphine Drive -Yarmouth Port -SEE SCALE
DRAWING TITLE: SCALE:
Massachusetts 02675 SITE PLAN
-for-
DWG. No: Z
Lewis & Maura Capriccio DATE: o9 -APR -2o18 SHEET 2 of 19 SIZE: D
rL
IITCHEN
r i
GARAGE:.
I n
I I
MASTER
I I I I
BEDROOM
I I II
I I I I
CL.
t=—L_
II
II
I L------------
L----
II
LIBRARY CL.
�>
<
BATH
CL. '
CL.
BEDROOM
J
L
IF
I
CL.
>
ROOF OVERHANG
.
BATH==
REMOVAL OF INTERIOR WALL
II
DEMOLISH EXISTING GARAGE AND SLAB.
II
KEY: ADD FOOTINGS AND FOUNDATION
NOTE:
EXISTING FOR GARAGE AND 2ND FLOOR CONSTRUCTION
EXISTING ROOF STRUCTURE 15 TRUSS
CONSTRUCTION.
� ,�"[uv�D
.REMOVE
APR 2 0 2018
HEALTH E EPT. y
r ADD
PROJECT TITLE: Proposed Renovation at:
PROJECT NO:
11411=1t -Off
14 Dauphine Drive -Yarmouth Port-
SCALE:
DRAWING TITLE:
Massachusetts 02675
EXISTING FLOOR PLAN -DEMO -ADD
-for-DWG.
No:
DATE: o9 -APR- 2018
SHEET
3 of 19
SIZE: D
Lewis & Maura CaprICC10
ri r^1n
1 II 171 A 1 II
Ml
_O.
gIgo 11 I� - 1 1
7'-11" _2�I 31� -1
2 u4
1 I I O
A
15'-7" '
27' , 16.101 26'_01, 10 20'-511 [E CG 4 2
APR 2 0 2018
B � G HEALTH DEPT.
3, 3 A3 l
3.
PROJECT TITLE: Proposed Renovation at:
PROJECT N0:
14 Dauphine Drive -Yarmouth Port- DRAWING TITLE: SCALE: 1/4 If= 1t -off
Massachusetts 02675FIRST FLOOR PLANAIR
-for-
- DWG. No:
Lewis & Maura Capriccio DATE: 09 -APR -2018 SHEET 4 of 19 SIZE: D
f
F
�2
3.
O
O
O
!O
O
gIgo 11 I� - 1 1
7'-11" _2�I 31� -1
2 u4
1 I I O
A
15'-7" '
27' , 16.101 26'_01, 10 20'-511 [E CG 4 2
APR 2 0 2018
B � G HEALTH DEPT.
3, 3 A3 l
3.
PROJECT TITLE: Proposed Renovation at:
PROJECT N0:
14 Dauphine Drive -Yarmouth Port- DRAWING TITLE: SCALE: 1/4 If= 1t -off
Massachusetts 02675FIRST FLOOR PLANAIR
-for-
- DWG. No:
Lewis & Maura Capriccio DATE: 09 -APR -2018 SHEET 4 of 19 SIZE: D
32
104"
12'-104
CL.
15-101 L
A -SECTION-
0 1_5
� 31,E 4 4'-' 2 -
12 -�
APR 2 Q 2018
A HEALTH DEPT.
A13
PROJECT TITLE: Proposed Renovation at: PROJECT NO:
14 Dauphine Drive -Yarmouth Port- DRAWING TITLE: SCALE: 114 If= 1t -off
Massachusetts 02675 SECOND FLOOR ABOVE GARAGE--
-for-
DWG. No:
Lewis & Maura Capriccio DATE: o9 -APR -201$ SHEET 5 of 19 SIZE: D