Loading...
HomeMy WebLinkAboutEngineered Plan - 2013ACCESS COVERS MUST BE WI THIN 9" MINIMUM... 6" OF FINISH GRADE 3' MAXIMUM COVER FIRST 2'..TO ., BE LEVEL MIN 2" OF PEASTONE /,"� OR F I L TER FABRIC 4' DIAM PIPE 3/4" - l 1/2- DIA. IT /00. 7 5 99.6 2 ' H-20 % DOUBLE WASHED STONE 'v GAS $�$$ 99.412,% 97.4 l 00.5 BAFFLE 7 N3 OUTLET 3-500 GAL LEACHING CHAMBERS D -BOX W/4' STONE AROUND. 12.8'w x 33.5'1 x 2'd 1500 GAL H-20 SEPTIC TANK H-20 6" CRUSHED STONE OR COMPACTED BASE PROFILE : NOT TO SCALE I N VERT EL E VA T I ONS : DESIGN CRITERIA: GENERA L NO TES INVERT AT BUILDING: 100.7 DESIGN FLOW: INVERT IN SEPTIC TANK: 100.5 3 BEDROOMS AT 1/0 G.P.D. PER I. THIS PLAN IS FOR THE DESIGN AND CONSTRUCTION INVERT OUT SEPTIC TANK., 100.25 BEDROOM EQUALS 330 G.P.D. OF THE SEWAGE D l SPOSAL SYSTEM ONL Y. INVERT IN DIST. BOX: 99.77 . FENCE AS REQUIRED BY THE CONSERVATION COMMISSION. INVERT OUT DIST. BOX: 99.6 NO GARBAGE GRINDER 2. VERTICAL DATUM IS ASSUMED. FOR BENCH MARKS PREPARED FOR SET. SEE SITE PLAN. INVERT IN LEACH CHAMBER: 99.4 REMAIN IN PLACE UNTIL THE DISTURBED GROUND IS LEGEND TODD P E R R Y SEPTIC TANK REQUIRED: BOTTOM OF LEACH CHAMBER: 97.4 330 G.P.D. X 20OX -660 GAL. 3. ALL CONSTRUCTION METHODS AND MATERIALS AND ADJUSTED GROUND WATER: N/A SEPTIC TANK PROVIDED: 1500 GAL. MIN. MAINTENANCE OF THE SEPTIC SYSTEM SHALL OBSERVED GROUND WATER: N/A CONFORM TO MASS. D.E.P. TITLE 5 AND LOCAL BOTTOM OF TEST HOLE *3: 84.5 SOIL ABSORPTION SYSTEM REQUIRED: BOARD OF HEALTH REGULATIONS. HYDRANT SCALE: 20 D ECEM S E R P. 2013 DESIGN PERC RATE C 15 MIN/INCH G GAS LINE SOIL TEXTURAL CLASS - I1 4. ALL SEPTIC SYSTEM COMPONENTS LOCATED UNDER OVER HEAD WIRES STEPHEN A HAAS EFFLUENT LOADING RATE - 0.56 GPD/SF AREAS SUBJECT TO VEHICULAR TRAFFIC OR GREATER LIGHT POST E N G I NEER I N G INC 330 GPD / O 56 GPD/SF - 590 S F REQUIRED THAN 3' IN DEPTH SHALL BE CAPABLE OF WITH- STANDING H-20 WHEEL LOADS. PROVIDED: 3-500 GAL LEACHING CHAMBERS W/4' STONE AROUND. A-614 S.F. 5. ALL SEWER PIPE SHALL BE SCHEDULE 40 PVC OR 6/4 S.F. x 0.56 - 343 G.P.D. APPROVED EQUAL. VARIANCES REQUIRED: SOIL TEST P l T DA TA � 6. SEPTIC TANK AND D -BOX SHALL BE REINFORCED TOWN OF YARMOUTH SUBSURFACE SEWAGE DISPOSAL REGULATIONS PRECAST CONCRETE OR APPROVED POLYETHYLENE, REGULATION 3.7: LOCATION OF DISPOSAL FACILITIES INDICATES _� INDICATES BOTH SHALL BE WATERTIGHT. D -BOX SHALL BE WATER PERCOLATION = OBSERVED TESTED FOR LEVEL WHEN THERE IS MORE THAN ONE /00' I S REQUIRED BETWEEN THE SAS AND A WETLAND. 94' IS PROVIDED TO THE TEST = GROUNDWATER OUTLET. PRIMARY SAS. A 6' VARIANCE IS REQUESTED. 83' IS PROVIDED TO THE RESERVE ' TP #1 TP .2 AREA. A 17' VARIANCE IS REQUESTED. 7. BEFORE CONSTRUCTION CALL 'DIG -SAFE'. 0' HORIZON TEXTURE COLOR 101.8 0' HORIZON TEXTURE COLOR 10/.8 \ 1-888-DI6-SAFE AND THE LOCAL WATER DEPT. \ FILL A LOAMY 2/2R FOR L OCA T I ON OF UNDERGROUND UTILITIES. \ 5' --------------- 101.4 15' --------------- 100.6 \ A LOAM 2/212 LOAM 4/6 SANDY B SANDY IOYR 8_ SEPTIC SYSTEM INSTALLER SHALL NOTIFY THE \ 18' --------------- 100.3 32' --------------- 99.1 DESIGN ENGINEER TWO DAYS PRIOR TO CONSTRUCTION +102.6 SANDY IOYR SANDY IOYR \ B LOAM 4/6 C I LOAM AND Sia OF THE SYSTEM TO ALLOW FOR SCHEDUL I NG OF THE / \ 30' --------------- 99.3 STONES CONSTRUCTION INSPECTIONS. / BA. CB/OH FND � � � p�� C I SANDY IOYR FIRM IN EL 100.49 i IIE LOAM AND 5/4 PLACE / 18'MAPLE 36'MAPLE Fgo� STONES 9. EXISTING CESSPOOL TO BE PUMPED DRY, REMOVED / - - - - - - -S 86.02-'3f--------%0 _o' FIRM 1N AND BACKFILLED WITH SAND. / ! - - 145. 60 ' - , PLACE [r� / 36 -MAPLE // \ 102. _ o .'f 102.2 /0. ALL UNSUITABLE MATERIAL !A & B HORIZONS. Cl) TP+2�- - NO WATER No WATER ENCOUNTERED BELOW THE INVERT OF THE LEACHING / 12.-8 _ l20' F91.8 /32' 90.8 102--- �1 I EXISTING BUILDING �� DATE: SEPTEMBER 19. 2013 FACILITY TO BE REMOVED FOR A DISTANCE OF 5' _ / ��\ I PROPOSED THREE / CESSPOOL '� SOIL REMOVAL \ TP •3 TP +a AROUND AND REPLACED WITH SAND IN ACCORDANCE W l 5 SEE NOTE !0. .. BEDROOM DWELLING Q ( O , • - -- OHW 10' , _� - NOR/ZOM =' TEXTURE -COLOR - _ -` ' HORTZON TEXTURE" COL7fR �0' /01.5 - 101.5 Tf w L 0 T A RE4 A SANDY IOYR A SANDY IOYR ! I. NO DETERMINATION HAS SEEN MADE AS TO a • LOAM 2/2 LOAM 2/2 102.0 :..::..':.'' m '�1 + 15' --------------- 100.3 15' --------------- 100.3 1 9. 108- S . F . rn o COMPLIANCE WITH DEED RESTRICTIONS OR ZONING + j .... ' ' ' I s : • i SANDY IOYR SANDY IOYR Z \ /02.3 , D -BD -80)(""" a �„ B LOAM 4/6 � LOAM 4/6 B REGULATIONS. IT SHALL REMAIN THE CLIENTS • • • • • • • • • • � , ti Oma;3-500 GALLON O po 30" --------------- 99.0 30' --------------- 99.0 RESPONSIBILITY TO OBTAIN ALL PERMITS, SPECIAL LEACHING CNAMBERSl' - " O \\ �_ / "' • / w SANDY LOAM IOYR SANDY LOAM IOYR / ' • W/4' STONE AROU,IVD �� 8 CI AND STONES 5/4 C I AND STONES 5/4 PERMI TS. VARIANCES ETC. FOR THIS PROJECT. / _ :••••••• ` - - - - -FIRM /N PLACE_ 93.5 FIRM 1N PLACE_ 95.0 \ GRAVEL DR I VEWAY \ ® TPs4 . / \ - 88 - i' - SOUTH SOUTH 1500\G4LLON ��_ 10� n/ P�� ORTH - ORTH , AAAA SEPTI TANK p`y .��- io C\ - - ' - - - - _ `-- F 90.5 96 93.5 " �•MOFM,4 1 102 8 / \\ , C2 SANDY LOAM IOYR C2 SANDY LOAM IOYR AFP Sq� °v J r. ort a r _ _ - - - - - 0 AND COBBLES 5/4 AND COBBLES 5/4 \ 158- o s , /4 2 MAPLE, / F i 0. LOOSE l06' LOOSE TERRY �� 7 /� p r ?^1F 1S • y i ____ 6°0/' �y _ - yo - ANN \ \ \ \ \ + 01.4 / / STK/TCKf/J� NO WATER NO WATER a Np 387 R - - - - - - - - - - 204' 84.5 /44' 89.5 a 100- 9g.�' STK/TCK FND b €I I s•a..I G'�,. i A dy fi. .M2 �r.4`o• - / r � � � - "- - DATE: NOVEMBER l2. 2013 i - TEST BY: STEPHEN HAAS C`'J i' i a + BMB/DH FN i i IAN l �' / / 9 / WITNESSED BY: AMY VONHONE 100------- / / EL -97.72 PERC RATE: C IS MIN/INCH t ?c •• ~ '� EW -2 I /A& 1 larmitvalid for REPAIR OF SEPTIC SYS"1 F.h1 dtte to state ����, local selitic variances. S l T E P L ,A N/O L A l\/ F) / Board -I'll' lIt! LOCUS MAP 1. t revrety :tail alwrov<rl is required tiir any future additions/r-cnuA;rtions/alterations to CONSER VA T I ON NO TES : sewage facilities and/or Str'uctrrres/dwelling, I O RA I L ROAD A VENUE. MA P I 12, PARCEL 34 Ya mouth If '11110 Department I. THE WORK L IMI T SHOWN SHALL BE FI TTED WI TH A SIL T EW -3 APPROVE -Di/ /� YA R M O U T H P O R T. MA . FENCE AS REQUIRED BY THE CONSERVATION COMMISSION. THE FENCED WORK LIMIT SHALL CONSIST OF A CONTINUOUS. PREPARED FOR STAKED. DUG- I N FABRIC SILT FENCE. THE FENCE SHALL' +lame- Date REMAIN IN PLACE UNTIL THE DISTURBED GROUND IS LEGEND TODD P E R R Y STABILIZED COMPLETELY. PROVIDE ALTERNATE SILT FENCE SUCH AS STAKED STRAWBALES IF NEEDED AS DIRECTED BY THE CONSER VAT I ON COMMISSION. ® CB CONCRETE BOUND 9 MOODY ROAD. H A R W I C H P O R T. MA 025-46 -W WATER L I NE 2. NO CONSTRUCTION RELATED ACTIVITY SHALL OCCUR ON THE 4 HYDRANT SCALE: 20 D ECEM S E R P. 2013 WETLAND SIDE OF THE WORK LIMIT. G GAS LINE OHW- OVER HEAD WIRES STEPHEN A HAAS 3. INITIAL SOIL STABILIZATION WITHIN THE WORK LIMIT -• LIGHT POST E N G I NEER I N G INC SHALL BE ACCOMPLISHED BY APPLICATION OF MULCH AND/OR ---E- UNDERGROUND ELECTRIC LINE , �\ LOAM AND SEED WEATHER PERMITTING. -T- UNDERGROUND TELEPHONE L ! NE t 923 Route 6 A ° ��� -CTV- UNDERGROUND CABLEVISION LINE �. ��� Ya rrno u t h p o r t MA 02675 +40.4 SPOT ELEVATION �'�'«- % 1 \� \\ ( 508) 362-8132 --..40 ------- EXISTING CONTOUR 0 10 20 40 P-0-1 PROPOSED CONTOUR JOB NO: 13-091