HomeMy WebLinkAboutEngineered Plans - 2018Wells not shown exceed 150' from the proposed SAS
BENCHMARK: EI. 50.0 r7l,'_�
(Assumed Datum)
Survey Nail
Sewage Permit 06-47 Trowbridge
System Behind Dwelling path
-n
N S2' 22' 26
1 51 2 O
- 5
51.2 /
50.9
Garage
.Zj�l
100.00'
XIST/NG FLOOR LAYOUT
retYittit valid for REPAIR M SEPTK SYS'I'F
ONLY, dtie to State and 1 oval septic variances.
Board.of Health review and approsal is reyur ed tctr, nished pace
any future additions/ren u% a (ionsiatteratir s to
sewage facilities and/or structures/dwelling, W open Stairwell
to first floor living rm.
Yarmouth IIC-Mtlt I)ehartntent
/5�e/yaP PR() V LU
�51.2 C/0
�Xf�
OR: Open Loft
cr
�o CL
C 1
51 _ [501 49.2
51.8 111
51.5 \ �I
51.57 1 1
- 1,1 a
1 49.6
,I G ►►
1 i BM
J II • 50.0
51.4 J \ II W
1
20.0' "1'
56.-7-' Existing o 50.9 5.1 II c
50.8 - t
Dwelling �I III
i
_Z 50.� TOF ® EI. 52.0 51.3_ w 1 _ I
J I (00P i, �.. 51.6 Stone c°r
J pO D°e k C �I parking 9.9 �{
W Cov.
porch --- , _-
I 51.6
50.3
ISE /
paved Drive
50.3
50 49.7
/ 51.7 51
LOT 3'7
51.3WATER MAIN IS LOCATED
8,5.40 SF f
100 _ _ _... ON EAST SIDE, OF ROAD
0.20 AC f 51 00 _ PER YARMOU7H WATER
- - I DEPARTMENT.
S 82 2226„
Dining Bedrm
Kitchen Rm I�
Garage
PROPOSED SEPTIC SYSTEM
1500 H-20 SEPTIC TANK
DB -31H-20
3-500 GALLON CHAMBERS H-20
W/STONE (SEE DETAIL)
SCALE: V=20'
0 20 40 60
C 2018 Moran Engineering Associates, LLC
130H VARIANCE REQUIRED
1. Per 310 CMR 15.405 (1) (a): distance between kc t lines
& SAS: 10' required. 5' & 5.1' proposed. Varlance
requests of 5' & 4.9'.
Livi
Rm ng Bedrm
1 ST FLOOR
LEACHING AREA
DETAIL AIR VENT W/
l• =
161 DOME F/L TER
o
C: A LD
•�1
V
.0'
DB -3/H 20
(3) 8.5' X 4.8' X 2.0' CHAMBERS (H-20) W/ /. P STONE
ALONG SIDE AND 2.0' ALONG ENDS. PROVIDE A METAL
COVER ACCESS COVER, AT CENTER CHAMBER, TO
WITHIN 3" OF FINISH GRADE.
ZF1 OF 17
H OF plgss �� gssq'�
RICHARD 9c�� MICHAEL cyGN,
Q
J S.
JU D J LADUE
1 No. 37560 v
c °SFS
ITAR,Pa 9_ Si V 0
Old Town /House
Pie
ce
3 Capstan
C.)
fCr rr
LOCUS
Deed: Book 7428, Page 82
Plan: Book 220, Page 149, Lot 37
LEGEND
21 Trowbridge Path
West Yarmouth, MA
Pauline Judge
Sir:
86/176 1 of 2
1/19/18 1 18-004
Moran Engineering Associates, LLC
941 Route 28 N PO Box 183
South Harwich, MA 02661
508-432-2878
Existing Building
•...•..I•...••.•
Edge of Pavement/Driveway
50 -
Existing Contour
®
Proposed Septic Tank
Existing Cesspool
Proposed Leaching Area:
29.5' L x 7.0'W x 2.0'b
52.7
Existing Spot Elevation
- OHu --
Overhead Utility Lines
-- w -
Existing Water Line
Q
5pticRfi0f6WED
AN 2 5 2018
HEALTH DEPT I
SITE AND SEWAGE PLAN
21 Trowbridge Path
West Yarmouth, MA
Pauline Judge
Sir:
86/176 1 of 2
1/19/18 1 18-004
Moran Engineering Associates, LLC
941 Route 28 N PO Box 183
South Harwich, MA 02661
508-432-2878
1. Provide 4" PVC dean -out caps (CIO) SEPTIC TANK
PROFILE
to grade between dwelling and septic tank.
Not to Scale Install irrigation control box cover over C/0.
EL.52.0 A„DN
METAL COVERS (2) TO BE WITHIN 6. OF GRADE MIN. 9- COVER
O. t ACCESS PORTS'----= MAX. 36' COVER
on itBOX
H-20
EL. 51.5±
ACCESS PORT
OF PNAI. 4RADE
L.48.95 �ZhkrN.
NEW EXIT LINE PROPOSED --5 `
EL.48.20 -f 1. 4.0' 1 t- EI -47.95 EL.47.
GALLON WT E
PERMITI PITCH: 0.02
PWIMBING M
1. REROUTE SEWER/FAT LINE TO NORTH SIDE OF DWELLING AT
MINIMUM ELEVATION OR HIGHER.
2. A PLUMBING PERMIT IS REQUIRED.
ELEV.
50.50
49.33
47.67
40.50
LEVEL STABLE BASE
SEPTIC TANK NOTES
1. Extend inlet tee 10" min. below flow line; extend
outlet tee 14" below flow line.
2. Provide 20" manholes over center of tank,
inlet and outlet with readily removable impermeable covers.
3. Install access port over inlet and outlet
with precast concrete or equivalent watertight
riser within 6" min. of final grade.
DEEP HOLE LOGS
DATE. 1/17/2018
DEEP OBSERVATION HOLE 11 TEST Br: RICK JUDD TIME: 1:00
From HOR TEXTURE COLOR
Surface (MUNSELL)
REDOX
FEATURES
STRUCTURE
CONSISTENCY, OTHER
14' HTM Fill NIA
NO
Stone parking overfill
34• Bwb Loamy Medium Sand 10YR 415
NO
Massive, very liable
120' C Medium - Coarse Sand 10YR 616
NO
Loose, single grain. 10% cobbles
Bottom of Perc: 66" (24 Gallons of water in 08:23)
RA 7E: < 2 MIN/INCH
WITNESS: Amy von Hone, R.S., Yarmouth Health Department
D�a,+"'0A1
® 2018 Moran Engineering Associates, LLC
6' OF STONE
UNDER D -BOX
6' ±
H• 0 01
EL.50.5±
EL. 48.50
7.65 EL.47.50
EL.45.50 -
14'. 5' 7' ±
"D" BOX NOTES
1. When system is dosed or slope of inlet pipe
exceeds 0.06/11. install inlet tee artoff one
inch above outlet inverL
2. Install outlet pipes level 2 feet minimum.
3. Provide a minimum sump of 6" below outlet invert.
4. Install access port over "D" Box with precast concrete or equivalent
watertight riser within 6" min. of final grade.
DESIGN DATA
1. REQUIRED FLOW: "2 - BEDROOMS X 110 - GPD/B.R.= 220 - GPD
2. SEPTIC TANK CAPACITY: 220 - GPD X 2 = 440 - GPD
USE (1)1500 - GALLON (H-20) SEPTIC TANK
3. LEACH FACILITY DESIGN: 29.6 X 7.0'X 2.0'
SIDE WALL AREA: 2 (29.5 + 7.0) X 2 X 0.74 GPD/SF =108.04
BOTTOM AREA: 29.5 X 7.0 X 0.74 GPD/SF =152.81
TOTAL = 260.85
260 - GPD PROVIDED > 220 - GPD REQUIRED
' 2 - BEDROOM MINIMUM DESIGN FLOW PER 310 CMR 15.203 (2)
PROPERTY IS LOCATED WITHIN A YARMOUTH ZONE II OF GROUND WATER
CONTRIBUTION. 2 -BEDROOM DEED RESTRICTION REQUIRED.
'x9 1
11 1'
MIN. 2X SLOPE
MIN. 9' COVER
MAX 36•. COVER
rACCESS PORT: 1 -METAL COVER
INSTALL. ACCESS PORT OVER LEACH CHAMBERS
w/WIECAW CONCRETE (OR EOW) WATER1144T
YDOUBLEER OF 1 WASHEDSTO TONE /2'
GENERAL NOTES
1.) ALL SYSTEM COMPONENTS SHALL BE INSTALLED IN ACCORDANCE W/ITTLE 5 OF THE SANITARY CODE & ANY
APPLICABLE REGULATIONS.
2.) PRIOR TO BACK FILLING THE INSTALLATION, THE DESIGNER & HEALTH AGENT SHALL BE NOTIFIED FOR INSPECTION.
3.) ANY ALTERATIONS OF THIS DESIGN MUST BE APPROVED BY THE DESIGNER & BOARD OF HEALTH, IN WRITING.
4.) SYSTEM IS NOT DESIGNED FOR A GARBAGE GRINDER.
5.) THE INSTALLER IS TO VERIFY THE LOCATION(S) OF UTII ITIES, CESSPOOL(S) AND SEWER INVERTS PRIOR TO
CONSTRUCTION.
6.) ALL UNSUITABLE MATERIAL WITHIN 5 FT. IN ALL DIRECTIONS FROM THE SOIL ABSORPTION SYSTEM SHALL BE
REMOVED & REPLACED W/CLEAN, COARSE SAND.
7.) ALL FILL MATERIAL UTUMD FOR THE SOIL ABSORPTION SYSTEM SHALL BE CLEAN, COARSE SAND FREE FROM
DELETERIOUS MATERIAL AND SHALL HAVE A PERCOLATION RATE OF LESS THAT 2 MIN /IN BEFORE & AFTER
PLACEMENT.
8.) EXISTING CESSPOOL(S) TO BE PUMPED AND BACK FILLED PER TITLE 5 ABANDONMENT PROCEDURES.
9.) DURING INSTALLATION, THE CONTRACTOR IS RESPONSIBLE TO PROVIDE A SAFE EXCAVATION AREA. -
10.) GROUND COVER OVER SEPTIC SYSTEM COMPONENTS SHALL NOT EXCEED 36".
11.) ALL GRAVITY SEWER PIPE SHALL BE 4" DIA. SCH 40 PVC UNLESS OTHERWISE NOTED. THE MINIMUM SLOPE OF 4" DIA.
SCH 40 PVC SHALL NOT BE LESS THEN 0.01 FTRT.
12.) WHEREVER SEPTIC LINES CROSS WATER SERVICE LINES OR WHEN WATER SERVICE LINES COME WITHIN 10' OF THE
PROPOSED S.A.S.- PIPES SHALL BE CLASS 150 PRESSURE PIPE & SHOULD BE PRESSURE TESTED TO ASSURE WATER
TIGHTNESS. COORDINATE WITH LOCAL WATER DEPARTMENT.
13.) PLACE MAGNETIC MARKING TAPE OVER ALL COMPONENTS.
I. CONTACT OFFICE A MINIMUM OF 48 -HOURS PRIOR TO START OF PROJECT.
2. A PLUMBING PERMIT IS REQUIRED. REROUTE SEWER LINE TO NORTH SIDE
OF DWELLING AT PROPOSED ELEVATION OR HIGHER. ALL PLUMBING WORK
IS TO CONFORM TO STATE AND LOCAL CODES.
3. LOCATE, PUMP AND FILL ALL CESSPOOLS. CONFIRMATION INSPECTION IS
REQUIRED.
4. A SOIL INSPECTION IS REQUIRED PRIOR TO PLACEMENT OF LEACHING AREA
COMPONENTS.
5. ALL COMPONENTS ARE TO BE H-20.
6. A FINAL INSPECTION IS REQUIRED WITH THE DESIGN AND YARMOUTH
HEALTH DEPARTMENT PRIOR TO FILLING SYSTEM
7. ALL LANDSCAPE CONSIDERATIONS ARE TO BE BETWEEN THE PROPERTY
OWNER AND SEPTIC SYSTEM INSTALLER.
21 Trowbridge Path
West Yarmouth, MA
PREPARED FOR
Pauline Judge
ASSESSORS' ID: JOB NUMM'
86/176 1 18-004
1/19/18 1 SHEET 2 of 2
Moran Engineering Associates, LLC
PO Box 183
South Harwich, MA 02661
508-432-2878
3 vC y1:
O O O Osy�; 2.0' EFFECRVE
}t'iiH,�X
.Rr�•Y"St�r\.`
l� D l� D D •J�y
DEPTH
2, 0'
3/4' TO 1-1/2' DOUBLE WASHED STONE 2.0'
STONE
25.5' LENGTH INSTALLED STONE 5,0' To
D�a,+"'0A1
i= 29.5' OVERALL LENGTH INSTALLED
EL.40.50
NO WATER ENCOUNTERED
GENERAL NOTES
1.) ALL SYSTEM COMPONENTS SHALL BE INSTALLED IN ACCORDANCE W/ITTLE 5 OF THE SANITARY CODE & ANY
APPLICABLE REGULATIONS.
2.) PRIOR TO BACK FILLING THE INSTALLATION, THE DESIGNER & HEALTH AGENT SHALL BE NOTIFIED FOR INSPECTION.
3.) ANY ALTERATIONS OF THIS DESIGN MUST BE APPROVED BY THE DESIGNER & BOARD OF HEALTH, IN WRITING.
4.) SYSTEM IS NOT DESIGNED FOR A GARBAGE GRINDER.
5.) THE INSTALLER IS TO VERIFY THE LOCATION(S) OF UTII ITIES, CESSPOOL(S) AND SEWER INVERTS PRIOR TO
CONSTRUCTION.
6.) ALL UNSUITABLE MATERIAL WITHIN 5 FT. IN ALL DIRECTIONS FROM THE SOIL ABSORPTION SYSTEM SHALL BE
REMOVED & REPLACED W/CLEAN, COARSE SAND.
7.) ALL FILL MATERIAL UTUMD FOR THE SOIL ABSORPTION SYSTEM SHALL BE CLEAN, COARSE SAND FREE FROM
DELETERIOUS MATERIAL AND SHALL HAVE A PERCOLATION RATE OF LESS THAT 2 MIN /IN BEFORE & AFTER
PLACEMENT.
8.) EXISTING CESSPOOL(S) TO BE PUMPED AND BACK FILLED PER TITLE 5 ABANDONMENT PROCEDURES.
9.) DURING INSTALLATION, THE CONTRACTOR IS RESPONSIBLE TO PROVIDE A SAFE EXCAVATION AREA. -
10.) GROUND COVER OVER SEPTIC SYSTEM COMPONENTS SHALL NOT EXCEED 36".
11.) ALL GRAVITY SEWER PIPE SHALL BE 4" DIA. SCH 40 PVC UNLESS OTHERWISE NOTED. THE MINIMUM SLOPE OF 4" DIA.
SCH 40 PVC SHALL NOT BE LESS THEN 0.01 FTRT.
12.) WHEREVER SEPTIC LINES CROSS WATER SERVICE LINES OR WHEN WATER SERVICE LINES COME WITHIN 10' OF THE
PROPOSED S.A.S.- PIPES SHALL BE CLASS 150 PRESSURE PIPE & SHOULD BE PRESSURE TESTED TO ASSURE WATER
TIGHTNESS. COORDINATE WITH LOCAL WATER DEPARTMENT.
13.) PLACE MAGNETIC MARKING TAPE OVER ALL COMPONENTS.
I. CONTACT OFFICE A MINIMUM OF 48 -HOURS PRIOR TO START OF PROJECT.
2. A PLUMBING PERMIT IS REQUIRED. REROUTE SEWER LINE TO NORTH SIDE
OF DWELLING AT PROPOSED ELEVATION OR HIGHER. ALL PLUMBING WORK
IS TO CONFORM TO STATE AND LOCAL CODES.
3. LOCATE, PUMP AND FILL ALL CESSPOOLS. CONFIRMATION INSPECTION IS
REQUIRED.
4. A SOIL INSPECTION IS REQUIRED PRIOR TO PLACEMENT OF LEACHING AREA
COMPONENTS.
5. ALL COMPONENTS ARE TO BE H-20.
6. A FINAL INSPECTION IS REQUIRED WITH THE DESIGN AND YARMOUTH
HEALTH DEPARTMENT PRIOR TO FILLING SYSTEM
7. ALL LANDSCAPE CONSIDERATIONS ARE TO BE BETWEEN THE PROPERTY
OWNER AND SEPTIC SYSTEM INSTALLER.
21 Trowbridge Path
West Yarmouth, MA
PREPARED FOR
Pauline Judge
ASSESSORS' ID: JOB NUMM'
86/176 1 18-004
1/19/18 1 SHEET 2 of 2
Moran Engineering Associates, LLC
PO Box 183
South Harwich, MA 02661
508-432-2878