HomeMy WebLinkAboutBLD-18-6843 Version#73.5
PIL
Project/Job# 0263888 tN
RE: Post Installation Letter ty7tyuyA,
JR.
Project Jean Residence $ No.50037
Ya Pond St. '1e@ '
Yarmouth MA 02664
Dateeoit Review 8/8/20BLD-18-8
006843
l
Permit# BLD-18-006843 Gsi
Date of Install 8/72018
AHJ Yarmouth
SC Office South Shore
To Whom It May Concern,
On the above referenced project,the structure has been reviewed for additional loading due to the Installation of the solar PV addition to the
roof.The structural review,including the plans and calculations only apply to the section of roof that Is directly supporting the solar PV system
and Its supporting elements.
The demand loading on the structure directly supporting the additional gravity loading due to the solar panel supports and modules had been
reviewed post installation and determined to be in accordance with the requirements of the MA Res.Code,9th Edition/IEBC.
The work has been completed In accordance of the provisions of the approved permits of the applicable code.
Should you have any further questions or requirements pertaining to this project,please do not hesitate to contact me.
Bill Digitally
William A. Eldredge,PE signed by Bill
' Eldredge
Professional Engineer Eldre Date:
T: 888.765.2489 x58636 2018.08.08
email: weldredge@tesla.comry e 08:48:35-
d -0a•00'
RECEIVED
AUG 14 2018 1
9!11LDING UEPAk lmL�r
•
Tesla,Inc.
TESL t1 +O bcI!;aaa.v N,'>Y Fanfd,lr, (:,9145:,
�r.�bDSP.n 19;C, f f',1153910 ,
Version#73.5
PIL
Project/Job# 0263888 1Ntk
RE: Post Installation Letter
Project Jean Residence . 8 No.50037 •
72 Pond St. •
Yarmouth MA 02664 7&Cra•11,
Date oit Review 8/8/2018
BLD-18- I
Permit# BLD-18-006843
Aka
Date of Install 8/72018
AHJ Yarmouth
SC Office South Shore
To Whom It May Concern,
On the above referenced project,the structure has been reviewed for additional loading due to the installation of the solar PV addition to the
roof.The structural review,Including the plans and calculations only apply to the section of roof that is directly supporting the solar PV system
and its supporting elements.
The demand loading on the structure directly supporting the additional gravity loading due to the solar panel supports and modules had been
reviewed post installation and determined to be in accordance with the requirements of the MA Res.Code,9th Edition/IEBC.
The work has been completed in accordance of the provisions of the approved permits of the applicable code.
Should you have any further questions or requirements pertaining to this project,please do not hesitate to contact me.
Bill ' Digitally
William A.Eldredge,PE i,signed by Bill
Eldredge
ProfessionalEldre Date:
T: 888.765.2489 x58636 20t8.oe.o
a RECEIVED
email: weldredge@tesla.com08:48:35-
dg e -04'00'
II
AUG 14 2018
BUILDING DEPARTMENT
By:
T = S L n Twig Inc.
.,,
p „3z1 _