Loading...
HomeMy WebLinkAboutBLD-18-6843 Version#73.5 PIL Project/Job# 0263888 tN RE: Post Installation Letter ty7tyuyA, JR. Project Jean Residence $ No.50037 Ya Pond St. '1e@ ' Yarmouth MA 02664 Dateeoit Review 8/8/20BLD-18-8 006843 l Permit# BLD-18-006843 Gsi Date of Install 8/72018 AHJ Yarmouth SC Office South Shore To Whom It May Concern, On the above referenced project,the structure has been reviewed for additional loading due to the Installation of the solar PV addition to the roof.The structural review,including the plans and calculations only apply to the section of roof that Is directly supporting the solar PV system and Its supporting elements. The demand loading on the structure directly supporting the additional gravity loading due to the solar panel supports and modules had been reviewed post installation and determined to be in accordance with the requirements of the MA Res.Code,9th Edition/IEBC. The work has been completed In accordance of the provisions of the approved permits of the applicable code. Should you have any further questions or requirements pertaining to this project,please do not hesitate to contact me. Bill Digitally William A. Eldredge,PE signed by Bill ' Eldredge Professional Engineer Eldre Date: T: 888.765.2489 x58636 2018.08.08 email: weldredge@tesla.comry e 08:48:35- d -0a•00' RECEIVED AUG 14 2018 1 9!11LDING UEPAk lmL�r • Tesla,Inc. TESL t1 +O bcI!;aaa.v N,'>Y Fanfd,lr, (:,9145:, �r.�bDSP.n 19;C, f f',1153910 , Version#73.5 PIL Project/Job# 0263888 1Ntk RE: Post Installation Letter Project Jean Residence . 8 No.50037 • 72 Pond St. • Yarmouth MA 02664 7&Cra•11, Date oit Review 8/8/2018 BLD-18- I Permit# BLD-18-006843 Aka Date of Install 8/72018 AHJ Yarmouth SC Office South Shore To Whom It May Concern, On the above referenced project,the structure has been reviewed for additional loading due to the installation of the solar PV addition to the roof.The structural review,Including the plans and calculations only apply to the section of roof that is directly supporting the solar PV system and its supporting elements. The demand loading on the structure directly supporting the additional gravity loading due to the solar panel supports and modules had been reviewed post installation and determined to be in accordance with the requirements of the MA Res.Code,9th Edition/IEBC. The work has been completed in accordance of the provisions of the approved permits of the applicable code. Should you have any further questions or requirements pertaining to this project,please do not hesitate to contact me. Bill ' Digitally William A.Eldredge,PE i,signed by Bill Eldredge ProfessionalEldre Date: T: 888.765.2489 x58636 20t8.oe.o a RECEIVED email: weldredge@tesla.com08:48:35- dg e -04'00' II AUG 14 2018 BUILDING DEPARTMENT By: T = S L n Twig Inc. .,, p „3z1 _