Loading...
HomeMy WebLinkAboutEngineered Plan - Rev. 2018HILRMA L RDN DVCCN�ND N Y>O LOCUS4 ��. KEY: EXISTING CONTOUR: - - - - PROPOSED CONTOUR: --------- --- EXISTING SPOT ELEVATION: 25.5 PROPOSED SPOT ELEVATION: 25.5 TEST HOLE: * UTILITY POLE: -0 FENCE LINE: HYDRANT: �- RETAINING WALL: ROUTE 6 II LOCATION MAP LOT 36 (12,948 SF) ASSESSORS MAP: 107 PARCEL: 37 PLAN BOOK: 467, PAGE: 41 I M18-16 ........34.40........ in N N r LEACH AREA DETAIL SEPTIC SYSTEM DESIGN FLOW ESTIMATE: 4 BEDROOMS AT 110 GAL / DAY = 440 GAL / DAY SEPTIC TANK: 440 GAL / DAY x 2 DAYS = 880 GAL USE 1500 GALLON SEPTIC TANK (EXISTING) LEACHING AREA: USE 4 INFILTRATOR 3050 CHAMBERS WITH 4' OF STONE AROUND SIDES AND TAT ENDS (34.4'x 12.25'x 2' EFFECTIVE DEPTH) SIDE AREA: (34.4' + 12.25') x 2 x 2 = 187 SF (0.74) = 138 GAL/DAY BOTTOM AREA: 34.4'x 12.25'= 421 SF (0.74) = 312 GAL/DAY CAPACITY = 450 GAL/DAY EXISTING LEACH AREA (SEE NOTE 13) EXISTING FLOOR PLAN SEPTIC SYSTEM SECTION -10 90.2 ELEV. a COVERS WITHIN 6" OF FINISHED GRAC T MAX. COVER (1' MIN) PEASTONE OR FILTER FABRIC 3/4" - 1 1/2" DOUBLE WASHED STONE /-INSPECTION PORT � ELEV. 89.0 132"1 1 80.0 144' NO GROUND WATER ENCOUNTERED OLD TH 1 a _I a_nn A HORIZON LOAMY SAND 10YR 3/2 B HORIZON LOAMY SAND 10YR 5/6 Cl HORIZON MEDIUM SAND 10YR 7/4 C2 HORIZON LOAMY SAND 2.5Y 7/3 NOTES: 1. VERTICAL DATUM: ASSUMED 2. MUNICAPAL WATER IS AVAILABLE. 3. SCHEDULE 40_- 4" PVC PIPE TO BE USED THROUGHOUT SEPTIC SYSTEM. 4. ALL PRECAST UNITS SUBJECT TO TRAFFIC LOADS TO CONFORM WITH AASHTO H-20 SPECIFICATIONS. 5. PIPE PITCH = 1/4" PER FOOT (UNLESS NOTED OTHERWISE). 6. FIRST 2' OF PIPE OUT OF D -BOX TO BE SET LEVEL. 7. THE SEPTIC SYSTEM HAS NOT BEEN DESIGNED TO ACCOMODATE THE USE OF A GARBAGE DISPOSAL. 8. ALL CONSTRUCTION DETAILS ARE TO BE IN CONFORMANCE WITH THE STATE OF MASS. ENVIRONMENTAL CODE (TITLE FIVE) AND LOCAL HEALTH REGULATIONS. 9. CONTRACTOR TO VERIFY LOCATIONS OF ALL UTILITIES PRIOR TO CONSTRUCTION. 10. GROUND COVER OVER ALL SEPTIC SYSTEM COMPONENTS NOT TO EXCEED T WITHOUT VARIANCE, 11. FIELD SURVEY PROVIDED BY TERRY A. WARNER, P.L.S., HARWICH, MA. 12. THIS PLAN REQUIRES THE REVIEW AND APPROVAL OF ONE OR MORE TOWN DEPARTMENTS AND IS SUBJECT TO CHANGE UNTIL SUCH TIME. THIS PLAN HAS BEEN PREPARED FOR THE SOLE PURPOSE OF CONSTRUCTION OF A NEW SEPTIC SYSTEM AND DOES NOT NECESSARILY REPRESENT A FULL DETAILED PROPERTY SURVEY. 13. EXISTING LEACH AREA (3 - 500 GALLON CHAMBERS WITH STONE) IS TO BE PUMPED AND ABANDONED. WHEN OLD SYSTEM AND CONTAMINATED SOIL ARE WITHIN 5' OF PROPOSED LEACH AREA THEY ARE TO BE REMOVED AND REPLACED WITH CLEAN MEDIUM SAND. RECEIVED OF THOMAS J. SITE PLAN LOCATION: 16 RHINE RD., YARMOUTHPORT, MA PREPARED FOR: BOB & JANE GRAY LRE ATE: 4-2-18 VISED: 4-6-18 3050 CHAMBERS SCALE: J, BASS RIVER ENGINEERING P.E. P.O. BOX 1163, EAST DENNIS, MA 02641 508-364-9048 (EXISTING) 89.55 tLtV. 88.9 LJ 88.73 s V ELEV. O/AHORIZON ENGINEER: THOMAS McLELLAN, P.E. LOAMY SAND 10YR 413 ELEV, ELEV. ELEV. D -BOX 90.4 4"WITNESS: 86.5 1500 GAL (6" STONE UNDER OR MECHANICALLY COMPACTED) H H ELEV. 3�-4' 3'-4' SEPTIC TANK 30" PERCOLATION RATE: < 2 MIN/IN .E -34.4'x 12.25' TEE SIZES: (TO BE CONFIRMED) 88.54 INFILTRATOR 3050 CHAMBERS WITH INLET: 6" UP, 13" DOWN ELEV. 4' OF STONE AROUND SIDES AND TAT ENDS OUTLET: 6" UP, 14 DOWN (34.4'x 12.25'x 2' EFFECTIVE DEPTH) -PERC AT 54" 60 GAS BAFFLE AT OUTLET TEE 132"1 1 80.0 144' NO GROUND WATER ENCOUNTERED OLD TH 1 a _I a_nn A HORIZON LOAMY SAND 10YR 3/2 B HORIZON LOAMY SAND 10YR 5/6 Cl HORIZON MEDIUM SAND 10YR 7/4 C2 HORIZON LOAMY SAND 2.5Y 7/3 NOTES: 1. VERTICAL DATUM: ASSUMED 2. MUNICAPAL WATER IS AVAILABLE. 3. SCHEDULE 40_- 4" PVC PIPE TO BE USED THROUGHOUT SEPTIC SYSTEM. 4. ALL PRECAST UNITS SUBJECT TO TRAFFIC LOADS TO CONFORM WITH AASHTO H-20 SPECIFICATIONS. 5. PIPE PITCH = 1/4" PER FOOT (UNLESS NOTED OTHERWISE). 6. FIRST 2' OF PIPE OUT OF D -BOX TO BE SET LEVEL. 7. THE SEPTIC SYSTEM HAS NOT BEEN DESIGNED TO ACCOMODATE THE USE OF A GARBAGE DISPOSAL. 8. ALL CONSTRUCTION DETAILS ARE TO BE IN CONFORMANCE WITH THE STATE OF MASS. ENVIRONMENTAL CODE (TITLE FIVE) AND LOCAL HEALTH REGULATIONS. 9. CONTRACTOR TO VERIFY LOCATIONS OF ALL UTILITIES PRIOR TO CONSTRUCTION. 10. GROUND COVER OVER ALL SEPTIC SYSTEM COMPONENTS NOT TO EXCEED T WITHOUT VARIANCE, 11. FIELD SURVEY PROVIDED BY TERRY A. WARNER, P.L.S., HARWICH, MA. 12. THIS PLAN REQUIRES THE REVIEW AND APPROVAL OF ONE OR MORE TOWN DEPARTMENTS AND IS SUBJECT TO CHANGE UNTIL SUCH TIME. THIS PLAN HAS BEEN PREPARED FOR THE SOLE PURPOSE OF CONSTRUCTION OF A NEW SEPTIC SYSTEM AND DOES NOT NECESSARILY REPRESENT A FULL DETAILED PROPERTY SURVEY. 13. EXISTING LEACH AREA (3 - 500 GALLON CHAMBERS WITH STONE) IS TO BE PUMPED AND ABANDONED. WHEN OLD SYSTEM AND CONTAMINATED SOIL ARE WITHIN 5' OF PROPOSED LEACH AREA THEY ARE TO BE REMOVED AND REPLACED WITH CLEAN MEDIUM SAND. RECEIVED OF THOMAS J. SITE PLAN LOCATION: 16 RHINE RD., YARMOUTHPORT, MA PREPARED FOR: BOB & JANE GRAY LRE ATE: 4-2-18 VISED: 4-6-18 3050 CHAMBERS SCALE: J, BASS RIVER ENGINEERING P.E. P.O. BOX 1163, EAST DENNIS, MA 02641 508-364-9048 TH-1 91.0 TEST HOLE LOGS ELEV. O/AHORIZON ENGINEER: THOMAS McLELLAN, P.E. LOAMY SAND 10YR 413 7.. AMY VON HONE, R.S. 90.4 4"WITNESS: B HORIZON DATE: 3-29-18 LOAMY SAND 24 30" PERCOLATION RATE: < 2 MIN/IN 0Y 1 R 5/8 88 5 24 C HORIZON LOAMY SAND 2.5Y 7/4 ; -PERC AT 54" 60 132"1 1 80.0 144' NO GROUND WATER ENCOUNTERED OLD TH 1 a _I a_nn A HORIZON LOAMY SAND 10YR 3/2 B HORIZON LOAMY SAND 10YR 5/6 Cl HORIZON MEDIUM SAND 10YR 7/4 C2 HORIZON LOAMY SAND 2.5Y 7/3 NOTES: 1. VERTICAL DATUM: ASSUMED 2. MUNICAPAL WATER IS AVAILABLE. 3. SCHEDULE 40_- 4" PVC PIPE TO BE USED THROUGHOUT SEPTIC SYSTEM. 4. ALL PRECAST UNITS SUBJECT TO TRAFFIC LOADS TO CONFORM WITH AASHTO H-20 SPECIFICATIONS. 5. PIPE PITCH = 1/4" PER FOOT (UNLESS NOTED OTHERWISE). 6. FIRST 2' OF PIPE OUT OF D -BOX TO BE SET LEVEL. 7. THE SEPTIC SYSTEM HAS NOT BEEN DESIGNED TO ACCOMODATE THE USE OF A GARBAGE DISPOSAL. 8. ALL CONSTRUCTION DETAILS ARE TO BE IN CONFORMANCE WITH THE STATE OF MASS. ENVIRONMENTAL CODE (TITLE FIVE) AND LOCAL HEALTH REGULATIONS. 9. CONTRACTOR TO VERIFY LOCATIONS OF ALL UTILITIES PRIOR TO CONSTRUCTION. 10. GROUND COVER OVER ALL SEPTIC SYSTEM COMPONENTS NOT TO EXCEED T WITHOUT VARIANCE, 11. FIELD SURVEY PROVIDED BY TERRY A. WARNER, P.L.S., HARWICH, MA. 12. THIS PLAN REQUIRES THE REVIEW AND APPROVAL OF ONE OR MORE TOWN DEPARTMENTS AND IS SUBJECT TO CHANGE UNTIL SUCH TIME. THIS PLAN HAS BEEN PREPARED FOR THE SOLE PURPOSE OF CONSTRUCTION OF A NEW SEPTIC SYSTEM AND DOES NOT NECESSARILY REPRESENT A FULL DETAILED PROPERTY SURVEY. 13. EXISTING LEACH AREA (3 - 500 GALLON CHAMBERS WITH STONE) IS TO BE PUMPED AND ABANDONED. WHEN OLD SYSTEM AND CONTAMINATED SOIL ARE WITHIN 5' OF PROPOSED LEACH AREA THEY ARE TO BE REMOVED AND REPLACED WITH CLEAN MEDIUM SAND. RECEIVED OF THOMAS J. SITE PLAN LOCATION: 16 RHINE RD., YARMOUTHPORT, MA PREPARED FOR: BOB & JANE GRAY LRE ATE: 4-2-18 VISED: 4-6-18 3050 CHAMBERS SCALE: J, BASS RIVER ENGINEERING P.E. P.O. BOX 1163, EAST DENNIS, MA 02641 508-364-9048