Loading...
HomeMy WebLinkAboutEngineered Plans - 2018VARIANCES REQUESTED 310 CMR 15.212 - DEPTH TO GROUNDWATER. FIVE FOOT SEPARATION REQUIRED - VARIANCE TO FOUR FOOT SEPARATION REQUESTED. 310 CMR 15.211() - SOIL ABSORPTION SYSTEM TO CELLAR WALL. 20 ft MIN REQUIRED - VARIANCE TO 16 ft SEPARATION REQUESTED. 310 CMR 15.211() - SOIL ABSORPTION SYSTEM TO DRAINAGE EASEMENT. 25 ft MIN REQUIRED - VARIANCE TO 11.5 ft SEPARATION REQUESTED. O JSG�A* A10�G� ELEVATION 61.59 TO P OF FOUND O3 `EFT0IN��� , I F -TES -H NOTES ABANDON EXISTING SEWER PIPE AND INSTALL NEW PIPE AT ELEVATION INDICATED EXISTING SEPTIC TANK AND LEACH PIT TO BE PUMPED AND REMOVED. SOIL REMOVAL AREA - REMOVE ALL FILL & UNSUITABLE SOILS DOWN TO THE C STRATUM AND REPLACE WITH CLEAN MEDIUM SAND PER TITLE 5 (310 CMR 15.255(3)). LL EGEND SEPTIC COMPONENTS EXISTING 1000 GAL SEPTIC TANK 1500 GAL SEPTIC TANK OEXISTING LEACH PITI CESSPOOL DISTRIBUTION BOX ED GE q PA V 60 nit valid for REPAIR OFtiFF'PIC JY, dItQ- t0 StAtP and f ..� IL --h RAISE SEI�'ER LINE IN l�/ / BASEMA T- SOIL / PLAN REMO AR SCALE: 1 in = 20 ft 20 40 1 )0 20 PRINT ON 8-1/2 x 14 in PAPER FOR PROPER SCALE THIS PLAN IS INTENDED SOLELY FOR INSTALLATION OF THE YARMOUTH, MA SEPTIC SYSTEM DEPICTED ON IT. FOR ANY OTHER CHANGES TO THE PROPERTY INCLUDING PLACEMENT OF ADDITIONS, SHEDS, L O C U S M A P AE MASSAOCHU ETTSI REGISTERED OND ESURVEEYOR. CONSULT WITH i R SHOULD NCES 1 � U( 1 THIS (S A 1 COLOR IPLAN USE COLOR PLAN ONLY FOR INSTALLATION FULL DETAIL IS BEST VIEWED IN 60 FULL COLOR 0 0 to / GARB 160 r R PROPOSED SOIL ABSORPTION SYSTEM SEE-'DETAfL" ON BACK �Go TES SEWAGE DISPOSAL ti SYSTEM PLAN -TO SERVE EXISTING DWELLING THOMAS E, AND MARY ANN HOUGH OWNER(S)109 QUARTERMASTERS ROW YARMOUTH, MA 155 Geo Ryder Rd 5 PROPERTY ADDRESS Chatham, MA 02633 - Dovidcou@HotmaiLcom DATE- MAY 5, 2018 508 364-069,411 PG.112 T jDe# ETE-4274 .Wg WENDY'S`-0 OF M4SS9 OF Mass OLD TOWN HOUSE RD o DAVID DAVID 9OyG s O NOT v 9COUGHANOWR D. N D. v COUGHANOWR _+ m TO No. 1093 No. 461 j SCALE r D N �FGI R�14 q RO z m ROw v s N 1 s / SUP WINDJAMMER m N ® THIS PLAN IS INTENDED SOLELY FOR INSTALLATION OF THE YARMOUTH, MA SEPTIC SYSTEM DEPICTED ON IT. FOR ANY OTHER CHANGES TO THE PROPERTY INCLUDING PLACEMENT OF ADDITIONS, SHEDS, L O C U S M A P AE MASSAOCHU ETTSI REGISTERED OND ESURVEEYOR. CONSULT WITH i R SHOULD NCES 1 � U( 1 THIS (S A 1 COLOR IPLAN USE COLOR PLAN ONLY FOR INSTALLATION FULL DETAIL IS BEST VIEWED IN 60 FULL COLOR 0 0 to / GARB 160 r R PROPOSED SOIL ABSORPTION SYSTEM SEE-'DETAfL" ON BACK �Go TES SEWAGE DISPOSAL ti SYSTEM PLAN -TO SERVE EXISTING DWELLING THOMAS E, AND MARY ANN HOUGH OWNER(S)109 QUARTERMASTERS ROW YARMOUTH, MA 155 Geo Ryder Rd 5 PROPERTY ADDRESS Chatham, MA 02633 - Dovidcou@HotmaiLcom DATE- MAY 5, 2018 508 364-069,411 PG.112 T jDe# ETE-4274 .Wg SOIL EVALUATOR: DAVID D. COUGHANOWR, ASE 0461 WITNESSED BY: AMY VON HONE, HEALTH DEPT. TEST PIT 1 GROUNDWATER ENCOUNTERED AT 74 In PERC AT 50 in — 2 MIN/INCH IN C SOILS ELEVATION FILL 18-20 O SANDY LOAM 10 YR 2/2 NONE FRIABLE 20-22 E 58.95 10 YR 4/1 NONE FRIABLE 22-28 A LOAMY SAND 55.62- 52.781 50.95- 1 DEPTH INCHES SOIL HORIZON USDA SOIL TEXTURE SOIL COLOR (MUNSELL) SOIL MOTTLES OTHER 0-18 FILL 18-20 O SANDY LOAM 10 YR 2/2 NONE FRIABLE 20-22 E LOAMY SAND 10 YR 4/1 NONE FRIABLE 22-28 A LOAMY SAND 7.5 YR 3/4 NONE LOOSE 28-40 B LOAMY SAND 10 YR 4/4 NONE LOOSE 40-96 C I MEDIUM SAND 1 10 YR 5/6 1 NONE I LOOSE C7 FROM BU/LDII NOT TO SCALE S' ft - 8 in INLET OUTLET CO VER CO VER O —BOX SEPARATION BETWEEN INLET & OUTLET TEES NO LESS THAN LIQUID DEPTH CROSS SECTION VIEW Lo �. • N 2I 12 in MIN FROM = TANK h h SO a 6 In STONE BASE CROSS SECTION VIEW DEMON CALCULATM NS DESIGN FLOW: 3 BEDROOMS X 110 GPD = 339 GPD SEPTIC TANK: 330 GPD X 2 DAYS = 660 GALLONS REMOVE EXISTING 1000 GALLON SEPTIC TANK AND INSTALL NEW 1500 GALLON SEPTIC TANK. DISTRIBUTION BOX: INSTALL UNIT DEPICTED BELOW. SOIL ABSORBTION SYSTEM: THE LONG TERM ACCEPTANCE RATE FOR A CLASS ONE SOIL WITH A PERCOLATION RATE BELOW 5 MINUj ES PER INCH = 0.74 GALLONS PER DAY PER SQUARE! FOOT. INSTALL 20 ADS ARC 36 HIGH CAPACITY BIODIF FUSERS 20 UNITS x 5.0 ft / UNIT = 100 L.F. 100.0 L.F. x 4.80 S.F./L.F = 480.0 S.F. 480.0 S.F x .74 G.P.D. / S.F. = 355.2 QPD USE 20 ARC 36 HC BIODIFFUSERS AS CONFIGURED 'BELOW — Vt = 355.2 GPD ) 330 GPD REQUIRED REFER TO DEP APPROVAL LETTER TRANSMITTAL * X264258 FOR CERTIFICATION OF INFILTRTATOR SYSTEMS BIODIFFUSER UNITS. • IL = S R ' TI SYS rEM CONSTRUCTIONDFTAIL USE ADS ARC 36 LP EIOD/FFUSERS (3.8 - ch INVERT) GRAVEL FREE INSTALLATION ;7, USE. DEP- APPROVED INSTALLATION PROCEDURES.., INSPECTION PORT 25.0 ft 20 UNITS TOTAL — 5.0, f't. PER UNIT CROSS SECTION VIEW RESTORE VEGETATIVE COVER BACKFILL WITH CLEAN PERC SAND TO TOP OF CHAMBERS 3.8 Jn HI—CAP ji 8 loch EFF DEPTH UNITS TOTAL DEPTH 2.875' EXISTING SUITABLE EFFECTIVE WIDTH = 4 x 2.875' = 11.5' MATERIAL USE 20 ARC -36 LOW PROFILE ADS B/ODIFFUSER UNITS -NO STONE —INSTALLER TO OBTAIN DISPOSAL WORKS PERMIT BEFORE STARTING WORK. —ALL COMPONENTS INSTALLED SHALL MEET THE: MINIMUM REQUIREMENTS OF MASSACHUSETTS TITLE SI SEPTIC CODE (310 CMR 15). —INSTALLER TO VERIFY LOCATIONS OF ALL UNDERGROUND UTILITIES BEFORE EXCAVATING FOR SYSTEM. —ECO—TECH ENVIRONMENTAL RECOMMENDS THE INSTALLATION OF LOW FLOW FIXTURES & APPLIANCES, AND 'PERIODIC PUMPING OF THE SEPTIC TANK. —SYSTEM IS NOT DESIGNED TO WITHSTAND VEHICULAR LOADING. DO NOT PARK OR DRIVE VEHICLES OVER SEPTIC SYSTEM. I TOP OF FOUNDATION RAISE COVERS TO WITHIN ALL PIPE TO 4 in BE SCH. 40 PVC EL = 61.59+— b in OF FINAL GRADE AND TO PITCH AT 1/8 in/ft MIN 59.50 -4 59.00 ®-B® 3 INSPECTION USE H-20 MAX PORT RAISE N S ALL 57.47 SEWER IPE TMI5®® GALL N � sO =_ __ __ __ 3 58.20 WPM TANK 57.55 in 57.20 ===-=======-== �=-===-== REFER TO DETAIL BOX STONE SOL ABSORPTMN 57.80 ONE A 57.37 BASE 57.12 SYSTEM -REFER TO 4 - IA I6 ft 16 ft 3-8 ft DETAIL BOX HISTORIC 56.80 HIGH GROUNDWATER _ 52.78 SEWAGE DISPOSAL SYSTEM PLAN 109 CJUARTERMASTERS ROW YARMOUTH, MA MAY 5, 2018 ETE-4274 PG 2/2