HomeMy WebLinkAboutBLD-18-007308 ottlit TOWN OF YARMOUTH Building Department BUILDING
2 �O (508) 398-2231 ext.1261
til
�; . I �y PERMIT NO 'BLD-18-007308 •
PERMIT
M[}TKM[tf 1ya ' ISSUE DATE �O6/26/2018 JOB WEATHER CARD
-L-c. APPLICANT VITTORIO ARTIANO PERMIT TO ; Repair ,
AT(LOCATION) 150 WORKSHOP RD,SOUTH YARMOUTH,MA 026 I ZONING DISTRICT I I Bldg.Type: (Commercial
SUBDIVISION MAP BLOCK LOT 1097.6 BUILDING IS TO BE: CONST TYPE V B USE GROUP R-3 1
r CONTRACTOR I
I REMARKS Repair:Flashing repairs on roof (508-216-6256)
LICENSE 1156147il
I (Home Improvement
REBUILDEX OF PLYMOUTH 1;III
COUNTY
1l VITTORIO ARTIANO
AREA(SQ FT) 65,462,839,2, EST COST($) [0000.00 PERMIT FEE($) 190.00 I
6 COMMERCE WAY i t
OWNER TOWN OF YARMOUTH !CARVER, MA 02330 I!
_____._�__ ._____ BUILDING DEPT BY
ADDRESS (, 1146 ROUTE 28 I
LOUTH YARMOUTH 1MANI02664.4463j EQ._
1 PHONE _ '
THIS PERMIT CONVEYS NO RIGHT TO OCCUPY ANY STREET, ALLEY OR SIDEWALK OR ANY PART THEREOF, EITHER TEMPORARILY OF
PERMANENTLY. ENCROACHMENTS ON PUBLIC PROPERTY, NOT SPECIFICALLY PERMITTED UNDER THE BUILDING CODE, MUST BE
APPROVED BY THE JURISDICTION. STREET OR ALLEY GRADES AS WELL AS DEPTH AND LOCATION OF PUBLIC SEWERS MAY BE
OBTAINED FROM THE DEPARTMENT OF PUBLIC WORKS.THE ISSUANCE OF THIS PERMIT DOES NOT RELEASE THE APPLICANT FROM
MINIMUM INSPECTIONS REQUIRED FOR ALL APPROVED PLANS MUST BE RETAINED ON WHERE APPLICABLE SEPARATE
CONSTRUCTION WORK: 1)FOUNDATIONS OR JOB AND THIS CARD KEPT POSTED UNTIL PERMITS ARE REQUIRED FOR
FOOTINGS.2)PRIOR TO COVERING STRUCTURAL FINAL INSPECTION HAS BEEN MADE.WHERE ELECTRICAL PLUMBING/GAS
MEMBERS(READY FOR LATH OR FINISH COVERING) A CERTIFICATE OF OCCUPANCY IS AND MECHANICAL
3)FINAL INSPECTION BEFORE OCCUPANCY 4) REQUIRED,SUCH BUILDING SHALL NOT BE INSTALLATIONS.
REFER TO DETAILED INSPECTION SCHEDULE OCCUPIED UNTIL FINAL INSPECTION HAS
BEEN MADE.
POST THIS CARD SO IT IS VISIBLE FROM STREET
BUILDING INSPECTIONS APPROVALS
OTHER:
WORK SHALL NOT PROCEED PERMIT WILL BECOME NULL AND VOID IF INPSECTIONS INDICATED ON THIS CARD
UNTIL THE INSPECTOR HAS CONSTRUCTION WORK IS NOT STARTED WITHIN SIX CAN BE ARRANGED FOR BY TELEPHONE
APPROVED THE VARIOUS MONTHS OF DATE THE PERMIT IS ISSUED AS NOTED OR WRITTEN NOTIFICATION.
STAGES OF CONSTRUCTION .ApnvF