HomeMy WebLinkAbout2018 Jun 26 - Sign Off Transmittal, Plan - PoolTOP OF FOUNDATION
ELEV. _ 100.00_ 10 FT. MINIMUM
(ASSUMED)
z
20 FT. MINIMUM FROM CELLAR OR CRAWL SPACE
10 FT. MINIMUM FROM SLAB
CONCRETE
COVERS —
4" SCHEDULE 40 PVC PIPE
MIN. PITCH 1/8" PER FT.
CLEAN SAND
INSPECTION PORT
LOAM AND SEED OR ASPHALT DRIVE
2" LAYER OF
1L 17ST
DATE OF SOIL TEST DECEMBER 8-, 2017 -
SOIL TEST DONE BY SWEETSER ENGINEERING
WTNESSED BY
OBSIEM'N HOLE i ELEV.=--98.1N
1/8 TO 1/2 a PERCOLATION RATE _ <_?__ MIN./INCH AT 49 __ INCHES
WASHED STONE t -
I
'
TEXTURE
4.4T
OTHEIR
I6
4" CAS? IRON PIPE
MA MAX. A
NO
94,05 MAX. OR FILTER FABRIC
91.8 MIN.
VENT
LOAMY SAND
w
55-72" B
MAX.
2.5Y7/2
(OR EQUAL) MINIMUM
72-120" C
IMEDIUM SAND
2.5Y6/3
NOT REQUIRE D„
'
PITCH 1/4" PER FT.
FLOWZ
TEE
-
LEVELERS
FLOW LINE
91.05
.�`
DEPTH HORIZ
TEXTURE
ICOLOR I MOTT.
OTHEIR
0-48"
FILL
NO
48-55" A
LOAMY SAND
1OYR4/2
55-72" B
LOAMY SAND
2.5Y7/2
72-120" C
IMEDIUM SAND
2.5Y6/3
.,
94, -77-
-Vo
r