Loading...
HomeMy WebLinkAbout2018 Jun 26 - Sign Off Transmittal, Plan - PoolTOP OF FOUNDATION ELEV. _ 100.00_ 10 FT. MINIMUM (ASSUMED) z 20 FT. MINIMUM FROM CELLAR OR CRAWL SPACE 10 FT. MINIMUM FROM SLAB CONCRETE COVERS — 4" SCHEDULE 40 PVC PIPE MIN. PITCH 1/8" PER FT. CLEAN SAND INSPECTION PORT LOAM AND SEED OR ASPHALT DRIVE 2" LAYER OF 1L 17ST DATE OF SOIL TEST DECEMBER 8-, 2017 - SOIL TEST DONE BY SWEETSER ENGINEERING WTNESSED BY OBSIEM'N HOLE i ELEV.=--98.1N 1/8 TO 1/2 a PERCOLATION RATE _ <_?__ MIN./INCH AT 49 __ INCHES WASHED STONE t - I ' TEXTURE 4.4T OTHEIR I6 4" CAS? IRON PIPE MA MAX. A NO 94,05 MAX. OR FILTER FABRIC 91.8 MIN. VENT LOAMY SAND w 55-72" B MAX. 2.5Y7/2 (OR EQUAL) MINIMUM 72-120" C IMEDIUM SAND 2.5Y6/3 NOT REQUIRE D„ ' PITCH 1/4" PER FT. FLOWZ TEE - LEVELERS FLOW LINE 91.05 .�` DEPTH HORIZ TEXTURE ICOLOR I MOTT. OTHEIR 0-48" FILL NO 48-55" A LOAMY SAND 1OYR4/2 55-72" B LOAMY SAND 2.5Y7/2 72-120" C IMEDIUM SAND 2.5Y6/3 ., 94, -77- -Vo r