HomeMy WebLinkAboutBLD-19-000209 R Version#73.5
PIL
.ccp 1 qO1B
Project/Job# 0263922 e U/<\G D 3`
Ep RTM
RE: Post Installation Letter �FHT
Project: Haro Residence
16 River Dr.
Yarmouth MA 02664
Date of Review 9/6/2018
Permit* BLD-19-000209 Dlgnafysigned by HenryZhu
Date of Install 9/52018 Henry Zhu Date:2018.09.06 0956:38
-0700'
AHJ Yarmouth
Tesla Office South Shore
To Whom It May Concern,
On the above referenced project,the structure has been reviewed for additional loading due to the Installation of the solar PV addition to the
roof.The structural review,Including the plans and calculations only apply to the section of roof that is directly supporting the solar PV system
and its supporting elements.
The demand loading on the structure directly supporting the additional gravity loading due to the solar panel supports and modules had been
reviewed post installation and determined to be In accordance with the requirements of the MA Res.Code,9th Edition/IEBC,ASCE 7-10, '
and 2012 NDS.
The work has been completed in accordance of the provisions of the approved permits of the applicable code.
Should you have any further questions or requirements pertaining to this project,pk;ase do not hesitate to contact me.
Tesla,Inc.
'1 S L-