Loading...
99 Thacher Shore Road RDA Residential Gas Line Extension Project 99 Thacher Shore Road Yarmouth, Massachusetts Request for Determination of Applicability Prepared For: Colonial Gas Company d/b/a National Grid 40 Sylvan Road Waltham, Massachusetts July 2018 4 Barlows Landing Road • Pocasset, MA 02559 • Tel 508.564.7285 • Fax 508.564.4298 WO # 1248884 N-1191-104 July 19, 2018 Yarmouth Conservation Commission Yarmouth Town Hall 146 Route 28 South Yarmouth, MA 02664-4492 Re: Request for Determination of Applicability Residential Gas Line Extension Project Colonial Gas Company d/b/a National Grid 99 Thacher Shore Road, Yarmouth, Massachusetts Dear Members of the Commission: On behalf of Colonial Gas Company d/b/a National Grid, Tighe & Bond respectfully submits one original and seven (7) copies of this Request for Determination of Applicability (RDA) for the proposed gas line extension of an existing gas main from the intersection of Thacher Shore Road and Flintlock Way for approximately 100 linear feet (lf) east to the residence at 99 Thacher Shore Road in Yarmouthport, Massachusetts. A residential service line will be installed on this new segment of gas main through the driveway to the residence. Thacher Shore Road is a narrow, paved roadway serving a number of single-family residences. Short Wharf Creek is located to the east and north of the project area. Barnstable Harbor is located north of the project area. The Mill River is located northwest of the project location. This RDA is being filed since a portion of the proposed work will occur within the 100-foot Buffer Zone to Bordering Vegetated Wetlands (BVW), Salt Marsh, and Coastal Bank, the 200- foot Riverfront Area, as well as within Land Subject to Coastal Storm Flowage (LSCSF). In addition, work will occur within the locally-regulated 35-foot No Disturbance and 50-foot No Build Setbacks to these areas, as well as the 300-foot Buffer Zone to Major Estuaries. These areas are regulated under the Massachusetts Wetlands Protection Act (WPA, M.G.L. c. 131 §40) and the Town of Yarmouth Wetlands Protection Bylaw (Chapter 143) and its implementing regulations. Please note, a portion of the proposed work is considered an exempt buffer zone minor activity under 310 CMR 10.02(2)(b)(2)(i), as it consists of “Installation of underground utilities (e.g., electric, gas, water) within existing paved or unpaved roadways and private roadways/driveways, provided that all work is conducted within the roadway or driveway and that all trenches are closed at the completion of each workday.” All of the proposed work will occur in upland areas with no anticipated impacts to the surrounding wetland resources. Tighe & Bond respectfully requests that the Yarmouth Conservation Commission make the following Negative Determination-B(2): “The work described in the Request is within an area subject to protection under the Act, but will not remove, fill, dredge, or alter that area. Therefore, said work does not require the filing of a Notice of Intent.” This RDA application includes the following items: • Attachment A – Forms • Attachment B – Figures • Attachment C – Site Photographs • Attachment D – National Grid Best Management Practice Details -2- The following text discusses the wetland resource areas, proposed activities, and proposed protective measures. Wetland Resource Areas Site reconnaissance and wetland resource investigations of the project area were conducted on June 28, 2018. The reconnaissance was conducted in accordance with the Massachusetts Department of Environmental Protection (MassDEP) guidelines, 310 CMR 10.00, and Chapter 143. The resource area boundaries were surveyed using an iPad paired with an R1 (real-time submeter Bluetooth GPS receiver) unit. • Coastal Bank: The bank varies in composition. In areas closest to the project, it is comprised of the side slopes/shoulders of the roadway. This regulatory bank is a seaward-facing elevated landform, as it abuts an area subject to the ebb and flow of the tide. The Coastal Bank confines the Short Wharf Creek and the surrounding salt marsh system. • Salt Marsh: A salt marsh is situated north of 99 Thacher Shore Road along Short Warf Creek and is best characterized as an estuarine intertidal emergent marsh (EIEM). The boundaries of the wetland coincided with the edge of fill associated with the roadway and toe of the slope. Common vegetation identified included smooth cordgrass (Spartina alterniflora), common reed (Phragmites australis), saltmeadow cordgrass (Spartina patens). Salt marsh elder (Iva frutescens) and sweet pepperbush (Clethra alnifolia) were identified along the fringes of the wetland. • Bordering Vegetated Wetland: A Bordering Vegetated Wetland (BVW) occurs north of the residence at 99 Thacher Shore Road and to the east of the residential driveway on the fringes of the salt marsh. This wetland is best classified as a Palustrine Forested (PFO) wetland. The boundary of the wetland coincides with the edge of fill associated with Thacher Shore Road and the residential driveway. Commonly observed vegetation included skunk cabbage (Symplocarpus foetidus), red maple (Acer rubrum), highbush blueberry (Vaccinium corymbusum), cinnamon fern (Osmunda cinnamomea), and sensitive fern (Onoclea sensibilis). Another BVW occurs on the west side of the residential driveway. This wetland is best classified as a PFO wetland. The boundaries of the wetland also coincided with the edge of fill associated with the roadway and toe of the slope. Vegetation identified was similar to the vegetation in the wetland previously discussed. • Riverfront Area: Short Warf Creek is shown as a perennial stream on the USGS topographic map (Hyannis, Massachusetts; 1979). Accordingly, a 200-foot Riverfront Area extends horizontally from the banks of Short Warf Creek. Riverfront Area at this site consists of adjacent wetlands and areas of upland that include a paved roadway, gravel driveway, and maintained residential lawn. • Land Subject to Coastal Storm Flowage: The Federal Emergency Management Agency (FEMA) flood map (Panel No. 25001C0559J, effective July 16, 2014) was consulted to evaluate the presence of Land Subject to Coastal Storm Flowage. A portion of the project site falls within Zone AE, an area subject to flooding and/or inundation by the 100-year flood with a base elevation of 12 feet (NAVD88). Accordingly, the northern portion of the project site is regulated as Land Subject to Coastal Storm Flowage. -3- Rare Species The Massachusetts Natural Heritage and Endangered Species Program (NHESP) Atlas (14th edition; August 1, 2017) and MassGIS online (August 2017) were consulted during the preparation of this RDA. According to these sources, the project area does not fall within Priority Habitats of Rare Species or Estimated Habitats of Rare Wildlife (Figure 2). Proposed Activities The proposed work involves the extension of the existing underground gas main within Thacher Shore Road east for approximately 100 lf to provide a residential gas service connection to 99 Thacher Shore Road. The gas main extension will consist of a two-inch plastic pipe. The service connection will be approximately 660 lf and will consist of a one-inch plastic pipe within the existing driveway. Construction is anticipated to occur during the Fall 2018 season. Construction of the new main will require the excavation of a two-foot wide trench to safely install the underground gas main. The trench bottom will be excavated and graded so that the pipe will be supported for its entire length on undisturbed bottom. The new gas main will be buried to a depth of approximately three feet below surface grade. Upon the completion of work, the trench will be backfilled and the site will be restored to pre-existing conditions. Work can be conducted by conventional construction equipment parked on the existing roadway, residential driveway, and lawn. The work will occur within the 100-foot Buffer Zone and the locally-regulated 35-foot No Disturbance and 50-foot No Build Setbacks to BVW, as well as within LSCSF. The existing buffer where the work is proposed consists of a residential driveway and Thacher Shore Road. None of the proposed installation will occur within the naturally-vegetated buffer. The proposed work will not change the general characteristics of the area, as the entire project is contained within previously disturbed areas, residential driveway, and the roadway right-of- way (ROW). Approximately 1,238 square feet (sf) of work will occur within the 100-foot Buffer Zone across the project area. Approximately 1,060 sf and 1,119 sf of work will occur within the 35-foot No Disturbance and 50-foot No Build Setbacks, respectively. Approximately 831 sf of work will occur within the 300-foot Buffer Zone to Major Estuaries. Approximately 875 sf of work will occur within LSCSF. Protective Measures The proposed extension will occur within the existing roadway and on the residential property. During the installation activities, appropriate erosion control measures will be installed at the downgradient limit-of-work to protect the nearby resource areas from any adverse impacts. Attachment D of this submittal includes details of standard erosion control measures that have been used in past projects of similar scope. Following the completion of construction activities, paved areas will be restored and any disturbed soils will be mulched with straw. Fees As required under Chapter 143, two checks made payable to the Town of Yarmouth for the application filing ($75) and the advertisement fee ($10) have been enclosed. Copies of the checks have been provided in Attachment A. -4- Summary We look forward to having the opportunity to discuss this project with the Yarmouth Conservation Commission at the public hearing on August 2, 2018. We anticipate these materials are sufficient for the Commission to issue a Negative Determination confirming that “The work described in the Request is within an area subject to protection under the Act, but will not remove, fill, dredge, or alter that area. Therefore, said work does not require the filing of a Notice of Intent.” Should you have any questions regarding this application or require any additional information, please do not hesitate to contact me at (508) 304-6354 or via email at AJHoule@tighebond.com. Very truly yours, TIGHE & BOND, INC. Amanda J. Houle, PWS Senior Environmental Scientist Enclosures Copy: MA DEP SERO Andrew Shelby, National Grid J:\N\N1191 NGrid Licensing and Permitting\104 - Thatcher Shore Road, Yarmouthport\RDA\2-RDA_CoverLetter.doc Tighe&Bond ATTACHMENT A WPA FORM 1 COPIES OF FILING FEES wpaform1.doc Page 1 of 4 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Form 1- Request for Determination of Applicability Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Town of Yarmouth Wetland By-Law, Chapter 143 Yarmouth City/Town A. General Information Important: When filling out forms on the computer, use only the tab key to move your cursor - do not use the return key. 1. Applicant: Colonial Gas Company (c/o Andrew Shelby) Name Andrew.Shelby@nationalgrid.com E-Mail Address 40 Sylvan Road Mailing Address Waltham City/Town MA State 02451 Zip Code (781) 907-1867 Phone Number Fax Number (if applicable) 2. Representative (if any): Tighe & Bond Firm Amanda J. Houle, PWS Contact Name AJHoule@tighebond.com E-Mail Address 4 Barlows Landing Road, Unit #15 Mailing Address Pocasset City/Town MA State 02559 Zip Code (508) 304-6354 Phone Number (508) 564-4298 Fax Number (if applicable) B. Determinations 1. I request the Yarmouth Conservation Commission make the following determination(s). Check any that apply: a. whether the area depicted on plan(s) and/or map(s) referenced below is an area subject to jurisdiction of the Wetlands Protection Act. b. whether the boundaries of resource area(s) depicted on plan(s) and/or map(s) referenced below are accurately delineated. c. whether the work depicted on plan(s) referenced below is subject to the Wetlands Protection Act. d. whether the area and/or work depicted on plan(s) referenced below is subject to the jurisdiction of any municipal wetlands ordinance or bylaw of: Yarmouth Name of Municipality e. whether the following scope of alternatives is adequate for work in the Riverfront Area as depicted on referenced plan(s). wpaform1.doc Page 2 of 4 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Form 1- Request for Determination of Applicability Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Town of Yarmouth Wetland By-Law, Chapter 143 Yarmouth City/Town C. Project Description 1. a. Project Location (use maps and plans to identify the location of the area subject to this request): 99 Thacher Shore Road Street Address Yarmouth City/Town 122 Assessors Map/Plat Number 8 Parcel/Lot Number b. Area Description (use additional paper, if necessary): Thacher Shore Road is a narrow, paved roadway serving a number of single-family residences. Short Wharf Creek is located to the east and north of the project area. Barnstable Harbor is located north of the project area. The Mill River is located northwest of the project location. c. Plan and/or Map Reference(s): Figure 4- Site Plan Title July 2018 Date Title Date Title Date 2. a. Work Description (use additional paper and/or provide plan(s) of work, if necessary): Colonial Gas Company d/b/a National Grid proposes to existing gas main from the intersection of Thacher Shore Road and Flintlock Way for approximately 100 linear feet (lf) east to the residence at 99 Thacher Shore Road in Yarmouthport, Massachusetts. A residential service line will be installed on this new segment of gas main through the driveway to the residence. Please refer to the attached cover letter for additional details. wpaform1.doc Page 3 of 4 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Form 1- Request for Determination of Applicability Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Town of Yarmouth Wetland By-Law, Chapter 143 Yarmouth City/Town C. Project Description (cont.) b. Identify provisions of the Wetlands Protection Act or regulations which may exempt the applicant from having to file a Notice of Intent for all or part of the described work (use additional paper, if necessary). 310 CMR 10.02(2)(b)(2)(i) 3. a. If this application is a Request for Determination of Scope of Alternatives for work in the Riverfront Area, indicate the one classification below that best describes the project. Single family house on a lot recorded on or before 8/1/96 Single family house on a lot recorded after 8/1/96 Expansion of an existing structure on a lot recorded after 8/1/96 Project, other than a single family house or public project, where the applicant owned the lot before 8/7/96 New agriculture or aquaculture project Public project where funds were appropriated prior to 8/7/96 Project on a lot shown on an approved, definitive subdivision plan where there is a recorded deed restriction limiting total alteration of the Riverfront Area for the entire subdivision Residential subdivision; institutional, industrial, or commercial project Municipal project District, county, state, or federal government project Project required to evaluate off-site alternatives in more than one municipality in an Environmental Impact Report under MEPA or in an alternatives analysis pursuant to an application for a 404 permit from the U.S. Army Corps of Engineers or 401 Water Quality Certification from the Department of Environmental Protection. b. Provide evidence (e.g., record of date subdivision lot was recorded) supporting the classification above (use additional paper and/or attach appropriate documents, if necessary.) wpaform1.doc Page 4 of 4 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Form 1- Request for Determination of Applicability Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Town of Yarmouth Wetland By-Law, Chapter 143 Yarmouth City/Town D. Signatures and Submittal Requirements I hereby certify under the penalties of perjury that the foregoing Request for Determination of Applicability and accompanying plans, documents, and supporting data are true and complete to the best of my knowledge. I further certify that the property owner, if different from the applicant, and the appropriate DEP Regional Office were sent a complete copy of this Request (including all appropriate documentation) simultaneously with the submittal of this Request to the Conservation Commission. Failure by the applicant to send copies in a timely manner may result in dismissal of the Request for Determination of Applicability. Name and address of the property owner: Tri K SriHadi Name 99 Thacher Road Mailing Address Yarmouth City/Town MA State 02675 Zip Code Signatures: I also understand that notification of this Request will be placed in a local newspaper at my expense in accordance with Section 10.05(3)(b)(1) of the Wetlands Protection Act regulations. Signature of Applicant July 19, 2018 Date Signature of Representative (if any) July 19, 2018 Date Yarmouth Conservation Commission • 1146 Route 28 • South Yarmouth, MA 02664-4492 Tel. (508)-398-2231 Ext. 1288 • Fax (508)-398-0836 • TTD# (508) 398-2231 Revised February 2016 Administrative Checklist Request for Determination of Applicability General Information: All filings must be made on Town of Yarmouth forms. All applications must be submitted two weeks prior to the next scheduled Conservation Commission meeting. No new information may be accepted into the Commissioner’s packet a week before the meeting. Failure to follow the Administrative Checklist guidelines shall result in an Administrative Incomplete Application and will not be advertised for a Public Hearing. Refer to the meeting and fee schedule. Contact the office if you need assistance. We will be happy to help guide you through the process. Submitting an Application: ______ 1 original application with original signatures (double sided). ______ If the applicant is not the property owner, please submit a signed copy of the Site Access Authorization Form. The owner must be sent a copy of the application on the same day it is filed with this office (proof of mailing is required). ______ 7 copies of the first and second page of the application (double sided) with a comprehensive and detailed narrative of the project including existing & proposed conditions, construction sequence, type of equipment, staging locations, drainage and stormwater, erosion controls, invasive species management and alternative analysis. The narrative shall document how the project meets performance standards per 310 CMR 10.0 & TOY Wetland Bylaw, Chapter 143, BVW delineation sheets and other supporting information. ______ 8 copies of the plan/sketch, folded separately, right side out with title visible and attached to each application. All plans shall reference NAVD1988 unless otherwise noted. Landscape plans shall be detailed to show proposed & existing conditions, native species, size and spacing. ______ A pdf copy of the application, supporting information and plan/sketch emailed to kgrant@yarmouth.ma.us. ______ 1 copy of a Yarmouth Assessors locator map highlighting parcel(s) where work is proposed, including map and parcel numbers. ______ Local filing fee – separate check payable to “Town of Yarmouth”. ______ Legal ad fee – separate check payable to “Town of Yarmouth”. ______ One (1) copy of application and plan/sketch shall be sent to Department of Environmental Protection, Southeast Region, 20 Riverside Drive, Route 105, Lakeville, MA 02347. ______ Submit the proof of mailing via Certified Mail Receipts (PS From 3800) for DEP or others such as Massachusetts Natural Heritage and Endangered Species Program, Massachusetts Division of Marine Fisheries, US Army Corps of Engineer or property owner. DEPARTMENT OF CONSERVATION Yarmouth Conservation Commission • 1146 Route 28 • South Yarmouth, MA 02664-4492 Tel. (508)-398-2231 Ext. 1288 • Fax (508)-398-0836 • TTD# (508) 398-2231 Site Access Authorization Form General Information: If the applicant is not the property owner, please submit this form with your application. The owner must be sent a copy of the application on the same day it is filed with this office. Property Address: _____________________________________________________________ Assessors Map/Lot: _____________________________________________________________ I (we) hereby authorize the individual members of the Yarmouth Conservation Commission and its agents to enter upon the referenced property for the purpose of gathering information regarding the application filed with the Commission pursuant to the Wetlands Protection Act (M.G.L. Ch. 131, s. 40) and/or the Yarmouth Wetlands Protection Bylaw (Chapter 143). Authorized Signature: _______________________________________ Date: ______________ Please Print Name: _________________________________________ If other than owner, please state whether tenant, agent, or other: _____________________ Mailing Address: ________________________________________________ ________________________________________________ ________________________________________________ Phone: __________________________ Cell: __________________________ Email: __________________________ Fax: __________________________ DEPARTMENT OF CONSERVATION 99 Thacher Shore Road, Yamouth, MA 02675 Map:122 Lot: 8 Amanda J. Houle, Tighe & Bond July 19, 2018 Agent 4 Barlows Landing Road, Unit #15 Pocasset, MA 02559 (508) 304-6354 AJHoule@tighebond.com (508) 564-4298 Tighe&Bond ATTACHMENT B FIGURES Based on USGS Topographic Map forHyannis, MA Revised 1979. Contour Equals 10-feet.Dennis, MA Revised 1974. Contour Equals 10-feet.Circles indicate 500-foot and half-mile radii 0 1,000 2,000 Feet 1:24,000 V:\Projects\N\N1191\99_ThatcherShore_Rd_Yarmouthport\Maps\99ThatcherShoreRd_YarmouthportMA_Topo.mxd [Exported By: kjw, 6/25/2018, 12:34:42 PM] FIGURE 1SITE LOCATION Residential Gas Line99 Thacher Shore Road Yarmouthport, Massachusetts June 2018 N--1191 ^_ ¹Tighe&BondEngineers | Environmental Specialists ÈSITE LOCATION Legend Gas Main Extension Gas Service Line THACHER SHORE ROADFLINTLOCK WAY 0 75 150 Feet V:\Projects\N\N1191\99_ThatcherShore_Rd_Yarmouthport\Maps\99ThatcherShoreRd_YarmouthportMA_Resource.mxd [Exported By: kjw, 6/25/2018, 12:34:30 PM] FIGURE 2PRIORITY RESOURCESResidential Gas Line99 Thacher Shore Road Yarmouthport, Massachusetts Data source: Bureau of Geographic Information (MassGIS), Commonwealth of Massachusetts, Executive Office of Technology Data valid as of June 2018. N-1191 June 2018 ^_ Legend Minor Street or Road Hydrologic Connections Stream/Intermittent Stream Protected and Recreational Open Space NHESP Priority Habitats for Rare Species NHESP Estimated Habitats for Rare Wildlife EPA Designated Sole Source Aquifer Major Drainage Basin Sub Drainage Basin MassDEP Inland Wetlands MassDEP Coastal Wetlands County Boundary Town Boundary Gas Main Extension Gas Service Line Site Parcel 1:1,800 ¹Tighe&BondEngineers | Environmental Specialists THACHERSHORE ROAD FLI NTLOCKWAY¹0 75 150 Feet 1:1,800 V:\Projects\N\N1191\99_ThatcherShore_Rd_Yarmouthport\Maps\99ThatcherShoreRd_YarmouthportMA_Aerial.mxd [Exported By: kjw, 6/25/2018, 12:34:29 PM] Based on MassGIS Color Orthophotography (2014).Parcels (2012) downloaded from MassGIS and are approximate. N-1191 FIGURE 3 ORTHOPHOTOGRAPH Residential Gas Line99 Thacher Shore Road Yarmouthport, Massachusetts June 2018 ^_ Legend Gas Main ExtensionGas Service Line Site Parcel Parcel Boundary Tighe&BondEngineers | Environmental Specialists THACHERSHORE ROAD FLI NTLOCKWAY¹0 75 150 Feet 1:1,800 V:\Projects\N\N1191\99_ThatcherShore_Rd_Yarmouthport\Maps\99ThatcherShoreRd_YarmouthportMA_SitePlan.mxd [Exported By: EMDrake, 7/17/2018, 11:46:33 AM] Based on MassGIS Color Orthophotography (2014).Parcels (2012) downloaded from MassGIS and are approximate. N-1191 FIGURE 4SITE PLANResidential Gas Line99 Thacher Shore Road Yarmouthport, Massachusetts July 2018 ^_ Legend Gas Main Extension Gas Service Line 35 Ft. No Disturbance Setback50 Ft. No Build Setback100 Ft. Buffer Zone 100 Ft. Riverfront Area200 Ft. Riverfront Area300 Ft. Local Major Estuary BufferStreamWetland BoundaryWetland Area Site ParcelParcel Boundary100 Year Flood Zone 100 Year Flood Zone (Coastal)Tighe&BondEngineers | Environmental Specialists 2 Ft. Wide Trench Within:300 Ft. Local Major Estuary Buffer: 831 Sq. Ft.200 Ft Riverfront Area: 405 Sq. Ft.100 Ft. Buffer Zone: 1,238 Sq. Ft.50 Ft. No Build Setback: 1,119 Sq. Ft.35 Ft. No Disturbance Setback: 1,060 Sq. Ft.Land Subject to Coastal Storm Flowage: 875 Sq. Ft. TOWN OF YARMOUTH CONSERVATION Y.C.T. LAND BANKTOWN OF YARMOUTH T.O.Y. L IB R A R Y KELLEY CHAPEL SUMMERSTREETL A N ESTRAWBERRYROUTE 6ATHACHERWAYFLINTLOCKTHACHER ROUTE 6AHIGHWAYSTATEGINGERBREADLANE TRANQUILTRAILSHOREROAD THACHER SHORE ROAD STATE HIGHWAYLANEMINDENWAYNORTH SANDYSIDE LANES T R E E T CH U RCHS T RE E T 281251292519159 1918133 134 143 147 157 161 165 169 173 175 179 183 191 195 197 201 17252922142420141210422317 4 5 44 5 8288 303297 28 9 277298 2 9 2 2864 1 7 2 5 278270256250240232226220208 212214206202180182176168162152146142138156141824283446527183152125318121822283238119 11 1 262537308302 162 182 209 1 8 1 4 2021172172 176 2312292656268 RTE 6A187 186 190 194 198 229 ROUTE 6A 63 67 8999135 147 92 4 1 6 181 15-172 1 63 THACHERSHORE ROAD 137 139 141 260266(PRIVATE)(PRIVATE)(TOWN)(TOWN)( T O WN) (T O WN )(TOWN) (TOW N ) (TOWN)(TOWN)( T O WN )(PRIVATE)DRAIN EASEMENT D R AIN E A S E M E NTUTILITY EASEMENTUTILITY EASEMENT RIG HT O F WA Y P/O 122-91 P/O 131-14 P/O 113-16 P/O 131-13 P/O 122-83.2P/O 122-4 P/O 122-5 122-6P/O P/O 122-57 P/O 122-76P/O 122-58 P/O 122-25 P/O 122-26 P/O 122-27 P/O 112-58 P/O 122-4 P/O 122-76 P/O 122-91 P/O 122-98P/O 122-98 P/O 122-115 122-118P/OP/O 122-116P/O 113-15 P/O 114-7 P/O 123-17 P/O 122-84.1P/O 122-84.1 P/O 122-24.1 340.28 AC 126 0.13 AC1240.07 AC1.10.01 AC 101 1090.29 AC4 9137.4 AC 84.1.123.2 AC 74.98 AC 694.25 AC 452.8 AC 872.6 AC 592.73 AC 62.73 AC 502.71 AC 522.1 AC 552.44 AC 881.94 AC 931.15 AC 83.22.23 AC 562.02 AC 921.73 AC 601.89 AC 24.11.86 AC 231.92 AC 56.45 AC 81.88 AC 141.8 AC 681.51 AC 1121 AC 801.23 AC 43.21.33 AC 83.11.24 AC 131.35 AC 581.22 AC 767.1 AC 751.17 AC 1301.09 AC 400.9 AC331.04 AC 220.95 AC 741.05 AC 461.06 AC 821.03 AC 530.99 AC 390.8 AC 271 AC 123C0.94 AC 640.8 AC 10.92 AC 570.94 AC 43.10.92 AC 104.10.83 AC 900.77 AC 84.1.20.59 AC1030.77 AC 1250.76 AC 650.69 AC 171.3 AC 151.07 AC 20.68 AC 810.67 AC 380.66 AC 129C0.62 AC 700.26 AC 730.67 AC 1170.65 AC 780.65 AC 1210.63 AC 850.61 AC 540.63 AC 1160.78 AC 790.61 AC 970.5 AC 320.59 AC 610.64 AC 107.10.56 AC 91.10.45 AC 200.56 AC 1060.55 AC 210.53 AC 1220.56 AC 1200.48 AC 510.55 AC 270.48 AC 420.48 AC 1140.48 AC 890.4 AC 260.47 AC 410.47 AC 1180.52 AC 1160.78 AC 710.52 AC 1020.47 AC 62.10.46 AC 630.47 AC 720.84 AC 62.20.48 AC 770.42 AC 1000.45 AC 250.46 AC 1100.41 AC 360.46 AC 980.44 AC 161.2 AC 850.75 AC 664.88 AC 1150.65 AC 1080.32 AC 940.47 AC 15.20.37 AC 190.3 AC 370.35 AC 1270.46 AC 990.37 AC 170.35 AC 15.10.34 AC 670.34 AC 950.31 AC 180.32 AC 280.32 AC 290.32 AC 140.32 AC 300.33 AC 310.32 AC 860.71 AC 1280.31 AC 960.31 AC 130.29 AC 160.31 AC 1110.34 AC 90.28 AC 71.2 AC 1130.27 AC 120.28 AC 110.26 AC 490.26 AC 30.18 AC 100.25 AC 660.24 AC 470.22 AC 480.22 AC 580.92 AC 1190.18 AC 350.25 AC 440.1 AC TAX MAPTOWN OF YARMOUTHBARNSTABLE COUNTY, MASSACHUSETTS DATE OF LATEST MAP REVISION: 9/28/15 INFORMATION SHOWN HEREON IS FOR ASSESSINGPURPOSES ONLY. NO LIABILITY FOR ERROR ISASSUMED BY THE TOWN OF YARMOUTH. 100 0 100 20050Feet «SHEET122112114113123122121132131130 Tighe&Bond ATTACHMENT C SITE PHOTOGRAPHS SITE PHOTOGRAPHS Tighe&Bond GAS LINE EXTENSION PROJECT, 99 THACHER SHORE ROAD, YARMOUTH, MASSACHUSETTS Photo 1: A view of Short Warf Creek and the adjacent Salt Marsh, facing southeast (6/28/2018). Photo 2: The gas line extension and service line installation is depicted with a red line and dotted red line, facing west (6/28/2018). SITE PHOTOGRAPHS Tighe&Bond -2- Photo 3: The location of the proposed serviced line is indicated by the dotted red line, facing south (6/28/2018). Photo 4: The red dotted line depicts the approximate gas service line location to residence at 99 Thacher Shore Road, facing south (6/28/2018). Tighe&Bond ATTACHMENT D BEST MANAGEMENT PRACTICES ENVIRONMENTAL GUIDANCE Date Doc. No.EG-303NE 02/20/18 SUBJECTAccess, Maintenance and Construction Best Management Practices ReferenceEP No. 3 - Natural Resource Protection (Chapter 6) Rev. No. 4 SEC-1 WEED FREE BALE BARRIER BMP DETAIL BMP PICTURE Page: 7-1 ENVIRONMENTAL GUIDANCE Date Doc. No.EG-303NE 02/20/18 SUBJECTAccess, Maintenance and Construction Best Management Practices ReferenceEP No. 3 - Natural ResourceProtection (Chapter 6) Rev. No. 4 SEC-2 SEDIMENT CONTROL FENCE BMP DETAIL BMP PICTURE Page: 7-2 ENVIRONMENTAL GUIDANCE Date Doc. No.EG-303NE 02/20/18 SUBJECTAccess, Maintenance and Construction Best Management Practices ReferenceEP No. 3 - Natural ResourceProtection (Chapter 6) Rev. No. 4 SEC-3 SILT FENCE / WEED FREE BARRIER BMP DETAIL BMP PICTURE Page: 7-3 ENVIRONMENTAL GUIDANCE Date Doc. No.EG-303NE 02/20/18 SUBJECTAccess, Maintenance and Construction Best Management Practices ReferenceEP No. 3 - Natural ResourceProtection (Chapter 6) Rev. No. 4 SEC-4 SILT SOXX * BMP DETAIL BMP PICTURE Page: 7-4 1 2 3 ENVIRONMENTAL GUIDANCE Date Doc. No.EG-303NE 02/20/18 SUBJECTAccess, Maintenance and Construction Best Management Practices ReferenceEP No. 3 - Natural ResourceProtection (Chapter 6) Rev. No. 4 SEC-5 STRAW WATTLE * (1 OF 2) BMP DETAIL Page: 7-5 ENVIRONMENTAL GUIDANCE Date Doc. No.EG-303NE 02/20/18 SUBJECTAccess, Maintenance and Construction Best Management Practices ReferenceEP No. 3 - Natural ResourceProtection (Chapter 6) Rev. No. 4 SEC-5 STRAW WATTLE * (2 OF 2) BMP PICTURE Page: 7-6 ENVIRONMENTAL GUIDANCE Date Doc. No.EG-303NE 02/20/18 SUBJECTAccess, Maintenance and Construction Best Management Practices ReferenceEP No. 3 - Natural ResourceProtection (Chapter 6) Rev. No. 4 CM-1 PREFABRICATED MATS * BMP PICTURE Page: 7-16