HomeMy WebLinkAbout126 Breezy Point, SE83-2105, Admin Review'i CONSERVATION
OFFICE
Yarmouth Conservation Commission
Administrative Review Application ?-,rr^.t #
zto,
lNrlL
Applicant lnformation:
Na me:
Address:t
Pho ne:
Signatu re:
Location of Work:
AVI <-L
j
*eAv lB. \LlAvr,ll ?ruFr ,(D,u\
/2L EBi+z,rB,,#%*n
Street f(am6 and Number
Detailed Description and Reason for Proposed Work:
a rmo ulh Co nse r
JUL 16 20t8
RE CEIVE D
vat io ngmmission
e L*
Lso u-!^,t 6^{
Closest Distance to Resource Area:
Proposed Start Date F,t-,2e/ O
Company to do Work:
Name:
4*€-Address:
P ho ne:
Administrative Review Comments:"C);i;:;":-;";:;; p,ouc."Q, uVctak pLai''t - P'<ts./t
a,l! cllO,'l,c ' ,t', //tz fi /z
- /t/v'Le cor 5i "b ge / ba c r N 7u r t'<tlruzt dJ't t'1 /rr>ty
z/z o/sorr
'l
________J
(
WPA FORM s-ORDER OF CONDITIONS
SPECIAL CONDITIONS-PAGE 1OA OF 12
SE83-2105, David & Lynda Tagliavini
'126 Breezy Point Road, South Yarmouth MA 02664
1 . The applicanUowner shall be responsible for having a copy of the "Order of Conditions" on the .iob site
at all times and shall be responsible for insuring that all persons performing the permitted activity are
fully aware of its terms and conditions. Failure to do so may result in the revocation of these "Orders",
a fine or both.
2. The Conservation Commission, its agent(s) or assigned(s) shall have the express right of entry upon
the job site at all reasonable times for the purposes of establishing compliance with the "Order of
Conditions", "By-Laws" and "Regulations". Commisslon members and the Conservation Administrator
may acquire any information, measurements, photographs, observations and/or materials or may
require the submittal of any data/information deemed necessary by this Commission for that
evaluation.
3. A preconstruction review shall be arranged by the contractor with the Conservation Administrator and
shall occur prior to the commencement of any work.
4. Any change in the approved plan(s) shall require the Applicant to file, in writing, a notice of project
change with this Commission. The Commission will determine the significance of the change and
determine whether administrative approval or an "Amended Order of Conditions" is required. Should
the project be changed without permission, or found by the Yarmouth Conservation Commission to
be altered in any way from the approved plan(s), all work will immediately cease until the pro.iect is
reapproved by the Commission.
5. The "Order of Conditions" is valid for three years from the date of issuance unless otherwise
specifically noted in the "Orders". Extension Permit requests must be applied for at least 30 calendar
days prior to the expiration date of the original Orders". Failure to do so will result in a new "Notice of
lntent" filing.
6. Noncompliance with these conditions shall constitute grounds for an Enforcement Order and possible
fines. Fines shall not exceed $300.00 per day/per violation.
7. A "work limit" line shall be established with Erosion Controls (i.e straw bales, staked filter fabric, bark
mulch, "silt sacks," products made with rice straw, and other weed-free products or approved by the
Commission.) Hay bales are not allowed. lt is the applicant's responsibility to implement and
maintain appropriate and adequate erosion controls measures throughout the construclion process.
8. No work of any kind shall occur on the Resource Area side of the work limit line. This line shall be
established prior to any construction or work.
9. Debris, including litter, shall be picked up immediately. Any excess material that is excavated from the
job site shall be disposed of at a location approved by the Conservation Administrator or in a covered
dumpster. No debris shall be allowed in a Wetland or Waterway
10. washing of equipmenutools shall be done oFF-SITE or handled in a manner appropriate by the
Conservation Administrator.
11. No equipment shall be refueled, nor shall fuel be stored within 100 feet of a resource area.
12. Gutters and downspouts directed into adequately sized drywells shall be provided for roof drainage.
The Commission may also allow "drip trenches" lnstead of gutter systems. At no time shall roof run off
be directed to a wetland resource area or abutting properties'
13. Any area that is disturbed during construction shall be revegetated immediately or as soon after as
the growing season commencei, with appropriate native plantings. Permanent slabilization shall be
carried out in order to minimize erosion.
WPA FORM s-ORDER OF CONDITIONS
SPECIAL CONDITIONS.PAGE lOB OF 12
SE83-2105, David & Lynda Tagliavini
126 Breezy Point Road, South Yarmouth MA 02664
14. A stamped "As Built Plan" shall be certifled by the Design Engineer (Massachusetts registered
Professional Engineer or land Surveyor) and will certify that this project has been completed in
accordance with the "Order of Conditions" before a Certificate of Compliance will be issued. The as-
built plan shall indicate the structure location, gradients, distances to the resource areas, and other
pertinent information described in the application and approved plans. Any deviation from the
approved plan shall be identified.
15. Upon completion of the project, a "Request for a "Certificate of Compliance" shall be submitted bythe
applicant to the Conservation Commission for review. The "Order of Conditions" shall be considered
incomplete until the "Certificate of Compliance" is issued by the Conservation Commission and
recorded at the Registry of Deeds.
16. The access stairs shall be moved to the west of the structure.
17. The path through the 35 foot setback shall be reduced to 4 feet in width by reducing the mowing area
and allowing vegetation to regrow. This condition shall be an ongoing in perpetuity and does not
expire with the issuance of the Certificate of Compliance.
18. No further structures shall to be allowed within the 50 foot setback. This condition shall be an
ongoing in perpetuity and does not expire with the issuance of the Certiflcate of Compliance.
3, CONTRA(
DIGSAFE
LOCATION
PRIOR TC
4. EXISTING
DWELUNG
5. ROOF DF
6. WEILAND
CONSULTI
75. oo
aL 2J7.
lOU7H
164
h-toJQI
fxistino
Uwe//thg\!o
-sb' oFF B .t
BW3
fli,,p.s1'56xli
Rir*(ovt >fq',t,t\DOIIION
PRINT OF
cKs
F FIRST
NSION AND
OR SUNROOM)
r.i.
OF &ASS
BW1-*..-
2l
L "Y''
.rl!
,!r
rL
'.il-L
/ ril.
.rlr
A\
q\/,!.LOT Bfi,753t SF
,!r
Pont(40'ttlae _ pub/ic)
entfdgeoPovem
Roa
:.q
-$-da
x
b'1od-'or{6il
m..J!s
k
(!
OECK
EXSNNG
orELuNclsr FL EL 10.A',
a€ct<
9.4
LIMIT
_- _-- \LINE
@
ORK
I
I
I
\
!L
.rl,
.rlL
.rlr.1
i]l
,\l/,
,r[
.rl!
\
L,^
L-1
i-
ffi $
)
I
I
I
(
1