Loading...
HomeMy WebLinkAboutEngineered Plan - 2001ENCHUM TOP OF FOUNDATION ELEV. = 100.00 (ASSUMED) 17 20 FT. MINIMUM FROM CELLAR 10 FT. MINIMUM 10 FT. MINIMUM FROM SLAB OR CRAWL SPACE CONCRETE COVERS 4" SCHEDULE 40 PVC PIPE z 7 MIN. PITCH 1/8" PER FT. 4 CAST IRON PIPE PIT CH(1/4") EIRIMUFTM FLOW LINE ELEV. _ `� ' 10" ''MIN. J•2�0» ELEV. = E ELEV. _L�/' GAS ELEV. _ �G°��I 6" SUMP ELEVL= (?�o 4 FEET 14 INCHES 5 FEET 19 INCHES 6 FEET 24 INCHES 7 FEET 29 INCHES 8 FEET 34 INCHES WiM MAX. CLEAN SAND LOAM AND SEED 2" LAYER OF 1 /8" TO 1 /2" WASHED STONE % MIN. NOTTREQUIRED Z 1 CU. FT. OF CONCRETE r1la; o�11 ANCHOR o ' 10• ° q< 13 o ELEV. = _ BAFFLE DISTRIBUTION EI EV y HIGH CAP L INFILTRATORS WITH (TO BE PLACED ON FIRM BASE) BOXD TO BE WATER TESTED S70 EINNI AN f `� Z T(A✓ 1 1500 GALLON IF MORE THAN ONE OUTLET t I� a�i ' rid TRENCH FORMATION SEPTIC TANK (TO BE PLACED ON FIRM BASE) SOIL YABSORPTION WELL N A ZONE 3/4" TO 1 1/2" CLEAN 5' J SAS, INDEX DOUBLE WASHED STONE ADJUST FREE OF FINES & SILT SEWAGE DISPOSAL SYSTEM PROFILE USGS PROBABLE WATER TABLE ELEV. _ OBSERVED WATER TABLE ( / / ) ELEV. = NOT TO SCALE BOTTOM OF TEST HOLE ELEV. I" SOIL TEST DATE OF SOIL TEST :�I LLq_ /01 SOIL TEST DONE BY WITNESSED BY t'E ?-,t)H_ OBSERVATION HOLE 1 a ELEV.=—�_ PERCOLATION RATE < 2 MIN./INCH AT� INCHES DEPTH HORIZ TEXTURE COLOR MOTT. OTHER 0-16�- rv-l2 Loom !oyjl2�I ,vY�2`/� IoY���� �� lam. rfNri�l�lD 132. NO WATER ENCOUNTERED AT ELEV. . Lq: I q` tw%�errr�ri DESIGN CALCULATIONS NUMBER OF BEDROOMS 2GARBAGE DISPOSAL DISPOSAL UNIT rta TOTAL ESTIMATED FLOW ( 110 GAL/BR./DAY X BR.) �-��� GAL./DAY REQUIRED SEPTIC TANK CAPACITY {,�3='_ GAL. ACTUAL SIZE OF SEPTIC TANK := GAL. SOIL CLASSIFICATION DESIGN PERCOLATION RATE <5__ MIN./IN. EFFLUENT LOADING RATE Q _ GAL./DAY/S.F. LEACHING AREA _ LEACHING CAPACITY (AREA X RATE) „ �Z_Z GAL./DAY 1 , X -5 -t N -4 Z4 St" .� z 12 RESERVE LEA&I G CAPACITY GAL./DAY NOTES: 1. ALL WORKMANSHIP AND MATERIALS SHALL CONFORM TO D.E.P. TITLE 5 AND THE TOWN OFRULES AND REGULATIONS FOR THE SUBSU FACE DISPOSAL OF SEWAGE. 2. ALL COVERS TO SANITARY UNITS SHALL BE BROUGHT TO WITHIN 6" OF FINISHED GRADE. 3.ALL COMPONENTS OF THE SANITARY SYSTEM SHALL BE CAPABLE OF WITHSTANDING H-10 LOADING UNLESS THEY ARE UNDER OR WITHIN 10 FT. OF DRIVES.OR PARKING AREAS. H-20 LOADING SHALL BE USED UNDER OR WITHIN 10 FT. OF DRIVES OR PARKING AREAS. LEGEND: 4. ANY MASONARY UNITS USED TO BRING COVERS TO GRADE SHALL BE MORTARED IN PLACE. EXISTING --SPOT ELFvATIG?�{--FAO <0 __ 5. M--DETE �MIN�;T1ON-'HAS BEEN' MADE AS TO COMPUAiNCE WITH EXISTING CONTOUR----00---- DEEDED OR ZONING REGULATIONS. OWNER /APPLICANT IS TO FINAL SPOT ELEVATION OBTAIN SUCH DETERMINATION FROM APPROPRIATE AUTHORITY. FINAL CONTOUR 6. UTILITIES SHOWN ARE APPROXIMATE ONLY, EXCAVATION CONTRACTOR SOIL TEST LOCATION ® IS TO CALL "DIG —SAFE" AT 1-888-344-7233 AT LEAST 72 HOURS UTILITY POLE —0— PRIOR TO COMMENCING WORK ON SITE. TOWN WATER=W—;--W 7. CONTRACTOR IS TO VERIFY GRADES AND ELEVATIONS AS WELL AS CATCH BASIN®j SITE CONDITIONS PRIOR TO COMMENCING WORK ON SITE. ANY VARIATION GAS LINE GG IS TO BE BROUGHT TO THE ATTENTION OF THE DESIGN ENGINEER CLEAN OUT C 0 IMMEDIATELY. CESSPOOL C.P. 0 8. PARCEL IS IN FLOOD ZONE C 9. LOT IS SHOWN ON ASSESSORS MAP SO AS PARCEL 94 441 ceeT ;t A�„�'?'is i s . RECEIV[jD� JUV 14 20C? HEALTH DE APPROVED: BOARD OF H . �2L2&� (Q DATE 7Zqtly AGENT ij PROPOSED SEPTIC DESIGN FOR PROJ: TADCO ENVIRONMENTAL CONSULTANTS 26 COMPASS LANE, DENNIS, MA 02638 (508) 385-2425 DATE /� f SCALE 1f _ 20' REVISED J46 N0. LOCATION MAP REVISED SHEET 1 OF 1 C.• �S8IPROJ\2244-00 �dwg�2244-00.DWG y. 0 T.A. DUMAS