July 23,2018
Town of Yarmouth Building Department
1146 Route 28
South Yarmouth,MA 02664
RE: Field Report
Cape Point Hotel
476 Main St
West Yarmouth,MA 02673
To Whom It May Concern;
Silvestri Architects conducted a field review of construction progress on July 18,2018 and found the
following:
1. The pool has been foreshortened.There is ongoing work with constructing needed stairs.
2. Contractor reports that steel supports were changed by Engineer to LVL.Those members were
just ordered. All of the areas have temporary supports awaiting delivery and installation of the
LVL's.
3. The windows in the Market/Pantry have been removed by the Owner.This will not adversely
affect the thermal envelop.
4. Shingle roofing has been installed and requires detailed finishing at the edges over the southerly
public areas.Roofing work is ongoing over the Breakfast Area.
5. Temporary supports in basement.No work underway.
6. Door 107 has a damaged frame.Suggest replacement.
7. Painting and finishing ongoing in guestrooms.
8. All rated assembly penetrations to be fire sealed.
Sincerely
S1L% �RCHITECTS,P.C.
Greg." Tomsic,AIA&LLS,LEED AP
Senio Pr. ect Architect
at a J a �9i t 4. .j<. } ..y, } gl
.} • . v. !d' v Y1 ,�,e, ':.sr f w i ‘1,;••4�l ) x ri..
:. r7 . . • ...,.. a . . � �t jr.
• y 1 �. y 4a ono f x;4.