Loading...
HomeMy WebLinkAboutBLD-19-000863 of YAR TOWN OF YARMOUTH Building Department 4 BUILDING _ _ Bio (508)398-2231 ext.1261 • f1 4211/217 PERMIT O 0 t y PERMIT NO :BLD-19.000863 `^� 4. \` SOB WEATHER CARD �e�:• -.;5' ISSUE DATE 08/17/2018 ��`'C6 APPLICANT ;Stephen Dickinson PERMIT TO I Repair , AT(LOCATION) 123 BASS RIVER PKWY,SOUTH YARMOUTH,MA I ZONING DISTRICT I I Bldg.Type: !Residential J SUBDIVISION MAP BLOCK LOT 1034.264 BUILDING IS TO BE: CONST TYPE USE GROUP REMARKS 2 WIDE CASEMENT AND 1 SINGLE CASEMENT REPLACEMENT NO CONTRACTOR STRUCUTRAL CHANGES U FACTOR 0.30 LICENSE AREA(SQ FT) 1910,796,040 j EST COST($) 14948.26 1 PERMIT FEE($) 150.00 OWNER [MCNAMARA NEIL J 1 BUILDING DEPT BY ADDRESS {MCNAMARA JOANNE G,23 BASS RIVER PK SOUTH YARMOUTH MA 02664 =-1 ONE THIS PERMIT CONVEYS NO RIGHT TO OCCUPY ANY STREET LL OR SIDEWALK NY PART THEREOF, EITHER TEMPORARILY OR PERMANENTLY. ENCROACHMENTS ON PUBLIC PROPERTY, NOT SPECIFICALLY PE ITTED UNDER THE BUILDING CODE, MUST BE APPROVED BY THE JURISDICTION. STREET OR ALLEY GRADES AS WELL AS DEPTH AND LOCATION OF PUBLIC SEWERS MAY BE OBTAINED FROM THE DEPARTMENT OF PUBLIC WORKS.THE ISSUANCE OF THIS PERMIT DOES NOT RELEASE THE APPLICANT FROM MINIMUM INSPECTIONS REQUIRED FOR ALL APPROVED PLANS MUST BE RETAINED ON WHERE APPLICABLE SEPARATE CONSTRUCTION WORK: 1)FOUNDATIONS OR JOB AND THIS CARD KEPT POSTED UNTIL PERMITS ARE REQUIRED FOR FOOTINGS.2)PRIOR TO COVERING STRUCTURAL FINAL INSPECTION HAS BEEN MADE.WHERE ELECTRICAL PLUMBING/GAS MEMBERS(READY FOR LATH OR FINISH COVERING) A CERTIFICATE OF OCCUPANCY IS AND MECHANICAL 3)FINAL INSPECTION BEFORE OCCUPANCY 4) REQUIRED,SUCH BUILDING SHALL NOT BE INSTALLATIONS. REFER TO DETAILED INSPECTION SCHEDULE OCCUPIED UNTIL FINAL INSPECTION HAS BEEN MADE. POST THIS CARD SO IT IS VISIBLE FROM STREET BUILDING INSPECTIONS APPROVALS • OTHER: , WORK SHALL NOT PROCEED PERMIT WILL BECOME NULL AND VOID IF INPSECTIONS INDICATED ON THIS CARD UNTIL THE INSPECTOR HAS CONSTRUCTION WORK IS NOT STARTED WITHIN SIX CAN BE ARRANGED FOR BY TELEPHONE APPROVED THE VARIOUS MONTHS OF DATE THE PERMIT IS ISSUED AS NOTED OR WRITTEN NOTIFICATION. STAGES OF CONSTRUCTION ARr1VF