HomeMy WebLinkAboutElectrical Work - Yarmouth (2016) •
DEM4IS-VARMO.LJTH REGIONAI_$D . .
•
• Electrical Work Yarmouth • • . •
Work OrderlD Status Request Date Requester Area Type• , Locatiorf . :
Description Completion Date Assigned To Building . • Area Number • 1,
. Action Taken •
Priority Craft '
• 17388 Closed Work Orders . . 2/12/2016 Audrey Lee . ' . . Margguerite E Small
•
K-the fight fixtures in the outside display • 4/27/2016 6:16:35 Mealey,Russ ' Art Room '
cases of the art room are not working. the Medium Lighting
bulbs have been changed,but ft is the fixtures.
Thank you for helping. .
@ Time Available:AVEC
this was assigned to Sandy not sure if ft is
already done please check sjc The socket '
Had to be replaced.
17522 Closed Work Orders 3/10/2016 Kathy Hunt Auditorium Mattacheese Mddle
5/6/2016 6:10:49 School
Lights are flickering/ceiling Time Available: Mealey,Russ
7:30 am-4pmAuditorium
Medium Lighting
not sure if you w ill need assistance in doing
this please advise Changed bulb.
17539 Closed Work Orders 3/14/2016 ugh Day SCS Dennis-Yarmouth
5/20/2016 Reg FG
wing bussport one light this problem in ballast. Mealey,Russ
Medium Electrical
Replaced ballast.
•17615 Closed Work Orders 3/30/2016 Mattacheese Day Hallway/Corridor Mattacheese Mddle
4 lanps needs to be change.
4/1/20166:02:05 SCS School
Mealey,Russ music area
Lights are on generator.
Medium Lighting
17629 Closed Work Orders 3/31/2016 ken girouard Classroom Mattacheese Mddle
4/1/2016 6:01:13 School
Burnt out light ballast in room B23-light Mealey,Russ
smoke condition-aired out room with B-23
Medium Electrical
w inflows.
Replaced ballast.
17646 Closed Work Orders 4/1/2016 Christine Cousins Wing Mattacheese Mddle
The overhead light in 4/5/2016 School
my classroom is out- Mealey,Russ B-4
students are having difficulty working in ny Medium Lighting
classroom without this light. Tme Available:
all the tune
17690 Closed Work Orders 4/8/2016 Doug Mayo Hallway/Corridor Dennis-Yarmouth
Good day,the light4/14/2016 1:12:23
is out leading into the Mealey,Russ Reg IS
equipment closet by the lower gym This light Medium Electrical Low er Gym
is at the end of the hall by the corner leading
to the upper gym. It is in the alcove area
before you go through the double doors into
the lower gym
Thank you
changed bulbs and didnt work work order
• been sent to russ RECCIVEGI
7/5/2016 8.01:35 AM JUL -52016 Page 1 of 5
BUILDING DEPT.
By
DENNIS-YARMOUTH REGIONAL SD
Electrical Work Yarmouth
•Work OrderlD Status Request Date Requester Area Type Location
Description Completion Date Assigned To Building Area Number
Action Taken Priority Craft
17697 Closed Work Orders 4/8/2016 Russ Mealey Football Field Dennis-Yarmouth
RS
Under ground outlet not working. 4/8/2016 6:08:11 Mealey,Russ Reg
Medium Electrical
The box is flooding w hen it rains heavy,needs
to be dug out more.
17698 Closed Work Orders 4/8/2016 High Day SCS Hallw ay/Corridor Dennis-Yamtuth
4/28/2016 Reg HS
On the custodian closet on 100 w ing,the Mealey,Russ
sw itch is broken.w e can't turn off the light. Medium Electrical 100w ing
if you need an electrician to repair please
have Adriana call Scott SDM sj At three
sw itches forthe hall are working.
17713 Closed Work Orders 4/11/2016 Karen Mauro Hallway/Corridor Station Ave
4/25/2016 6:19:06 Elementary
There is an exit sign that is out in the 200 w ing Mealey,Russ
hallway between room 202 and 203 limeMedium Lighting Hallway in 200 w ing
Available:any time
Replaced exit sign.
17734 Closed Work Orders 4/14/2016 High Day SCS Dennis-Yarmouth
KS
WAY BUSPORT, FRONT SMALL 5/13/2016 5:47:28 Mealey,Russ Reg
• CAFETERIA ,LIGHT NFFn BALLAST. Medium Lighting
Duplicate work order.
17753 Closed Work Orders 4/18/2016 Sandy Cashen Mattacheese Mddle
4/25/2016 6:17:45 School
fish pond seasonal check-open for spring Mealey,Russ
Medium Electrical MMS courtyard
Complete.
17765 Closed Work Orders 4/22/2016 Craig Davis Dennis-Yarmouth
4/22/2016 3:12:48 Reg KS
me and Russ ran three cable lines so there is Davis,Craig
cable for the shelter. Medium Electrical
at set
17785 Closed Work Orders 4/26/2016 Mattacheese Day Halla ay/Corridor Mattacheese Mddle
The light of the stairs doesn't work.
5/11/20166:10:32 SCS School
Mealey,Russ A,Bwing upstairs
Had to order 4 bulbs.
Medium Lighting area
17799 Closed Work Orders 4/29/2016 Maureen kessler Art Room Dennis-Yarmouth
HS
May I please have a fburescent bulb replaced 5/9/2016 2:50:23 Davis,Craig Reg
in my light table?I w ould also like to request a212
new piece of plexi-glass cut for the top. Time Medium Electrical
Available:any
light was fine just need adjustment,and we
ordered a new piece of plexi glass and now it
is at set
0 RECEIVKP ': 1
7/5/20168:01:35 AM JUL —5 2016 j Paget of
BUILDING DEPT. JI
By
DanS-YARMOUTH REGIONAL SD
Electrical Work Yarmouth
Work OrderlD Status Request Date Requester Area Type Location
Description Completion Date Assigned To Building Area Number
Action Taken Priority Craft
17801 Closed Work Orders 4/29/2016 Russ Mealey Football Field Dennis-Yarmouth
4/29/2016 Reg ES
Outlet at score board needs repaired. Mealey,Russ
Medium Electrical
Replaced a couple of screws.
17831 Closed Work Orders 5/5/2016 ken girouard Classroom Mattacheese Mddle
5/9/2016 6:15:11 School
The ballast has gone on a group of three lightMealey,Russ
bulbs in this room-they w ere all flickering for Medium Electrical A-8
about a week now they w ill not turn on
Changed ballast and 4 bulbs.
17832 Closed Work Orders 5/5/2016 Alex pendleton Auditorium Dennis-Yarmouth
5/10/2016 6:32:45 Reg ES
There is a recessed light(night be more)out Mealey,Russ
above the stage. Sorry for the late notice,but Medium Electrical stage
I have a concert on May 12th and it would be
wonderful if we can get that can lit. Time
Available:anytime other than next w eek
Tuesday and Thursday between 9-10:30am
Replaced 3 lights.
17841 Closed Work Orders 5/6/2016 ann agurkis Nurse's Office Marguerite E Small
• can I pease get a light above the sink?ft's 5/9/2016 6:13:37 Mealey,Russ nurse office
very dark and I do a lot of examining in that Medium Electrical
area Tine Available:9:30-3:40
Installed strip light.
17847 Closed Work Orders 5/9/2016 Russ Mealey Art Room Dennis-Yarmouth
Rck uple5/9/2016 6:12:14 �g HS
plexy glass for light table. Mealey,Russ
Medium Lighting
Rcked it up and installed it.
17869 Closed Work Orders 5/12/2016 High Day SCS Dennis-Yarmouth
5/12/2016 6:07:21 Reg HS
room 207,room copie machine.lights not Mealey,Russ
w ork,need ballast. Medium Electrical
Changed 4 bulbs and 1 ballast.
17870 Closed Work Orders 5/12/2016 High Day SCS Dennis-Yarmouth
5/13/2016 5:42:46 Reg HS
4 lighs not work in w ay busport,need ballast. Mealey,Russ
Medium Electrical
Duplicate work order.
17967 Closed Work Orders 6/2/2016 Krissy Breda Dennis-Yarmouth
6/3/2016 6:28:45 Reg SD Adm
outlet on bottom shelf of white bookcase's Mealey,Russ
coning out of w all...can not plug in Pupil Service office
computer...Time Available:asap Medium Electrical
Remounted outlet.
• RECEIVED
7/5/20168'01:35AM JUL -5 2016 Page3of5
BUILDING DEPT.
By
DENNIS-YARMOUTH REGIONAL SD
Electrical Work Yarmouth
Work OrderlD Status Request Date Requester Area Type Location
Description Completion Date Assigned To Building Area Number
Action Taken Priority Craft
17989 Closed Work Orders 6/6/2016 ken girouard Parking Lot Mattacheese Middle
6/7/2016 6:06:42 School
One of our light poles located out front in the Mosley,Russ
bus loop is laying on the ground and is still bus loop
Medium Electrical
lighting up at night.
Lamp has been clamped and secured
temporarily-Russ will put a box on ft to secure
properly.
Grounds has taken pole and has put in the
maintenance grounds area. sjc Made up
junction box for connections.
17992 Closed Work Orders 6/6/2016 Russ Mealey Gym Mattacheese Middle
6/6/2016 10:34:51 School
Exit sign by boys locker room hanging down. Mealey, Russ
Medium Lighting
Reattached.
18015 Closed Work Orders 6/8/2016 Scott Graf Auditorium Mattacheese Middle
6/9/201611:01:34 School
Breaker needs to be reset for auditorium lightsrvealey,Russ
Time Available:any Aud
Medium Lighting
Completed on w.o. 18016
•18016 Closed Work Orders 6/8/2016 Russ Mealey Auditorium Mattacheese Middle
Contacter for house lights stuck again. 6/8/2016 3:08:02 Mosley,Russ School
Medium Lighting
Reset it.
18018 Closed Work Orders 6/8/2016 Crag Davis Mattacheese Middle
6/10/2016 School
had to hit the relay sw itch for the house lights Davis,Craig
in the auditorium Medium Lighting
18021 Closed Work Orders 6/9/2016 Mattacheese Day Hallway/Corridor Mattacheese Middle
6/10/2016 2:44:34 SCS School
The fight of stairs is not working again.
Mealey,Russ A,Bw ing upstairs
Lights are working.They take a few seconds Medium Lighting area
to come on.
18028 Closed Work Orders 6/10/2016 eileen falco Kitchen Dennis-Yarmouth
6/13/2016 5.54:15 Reg HS
Wall socket not working-meat slicer wasMealey,Russ
plugged in and wires on that blew.Time Medium Electrical behind front serving
Available:anytime line
Replaced GFCI.
18071 Closed Work Orders 6/17/2016 High Day SCS Dennis-Yarmouth
6/17/2016 4:58:37 Reg IS
1 light ballst in kitchen need fbc. Mealey,Russ
Medium Electrical
Changed ballast.
• RECEIVED
7/5/2016 8:01:35 AM JUL -5 2616 Page 4 of 5
BUILDING DEPT.
By-----
DENNIS-YARMOUTH REGONAL SD
Electrical Work Yarmouth
•Work OrderlD Status Request Date Requester Area Type Location
Description Completion Date Assigned To Building Area Number
Action Taken Priority Craft
18111 Closed Work Orders 6/22/2016 Russ Mealey Band Room Mattacheese Mddle
None of the plugs in the gym and band area 6/22/2016 Mealey,Russ School
are not w orking. Medium Bectriical
Tripped main breaker in CDP 15 panel.
18112 Closed Work Orders 6/22/2016 Craig Davis Music Room Mattacheese Mddle
6/22/2016 School
all the computer and monitors outlets weren't Davis,Craig
working Medium Electrical
all set the main breaker in the chorus room
w as tripped w e w eren't surefromw hat but it
defiantly w asn't turned off but it is all set now
18129 Closed Work Orders 6/23/2016 Sandy Cashen Station Ave
6/28/2016 7:41:01 Bementary
check and replace burned out lights on stage Pantoja,Can
auditorium Medium Electrical
if you need help advise
ask Russ w hat bulbs etc.to use
•
• RECEIVED
7/5/2016 8'01:35 AM JUL -5 2016 I Page 5 of 5
BUILDING DEPT.
By