Loading...
HomeMy WebLinkAboutBLD-93-819 d. I i—T�E_ /4. .. , a�:- ;4� . 93-42-0 670,rZ/°�z/9.3 44t , , .' TOWN OF YA iRMOUTH o f %s/q3 , `� "k..:.. •Application for a Permit to Build No. i 9 0104_63 ed ,, ,,5--v a UP?N FINAL APPROVAL MAP F' 2- LOT 13 —a IS FEE MUST ACCOMPANY THIS APPLICATION. \ DATE919 9 The undersigned hereby applies for a permit to build /91 -193 according to the following specifications 1,v<we-��) 1. Name of property owner 1441-co M A Oskar 7T Tel. 624- 2-4.4- Address -'4hAddress for ' s Cax$r Kfr-rig Rb 63 et,- *0.►ao.h#-- £40,) 2.NameofArchitect(ifany) ` ki'i-4 Kin,- knd c 5 Tel.rrt-off° a Name of builder C b( ' eni«-b.^rc G° • Address 2-0 dog'- 4 cr. baa dr- jafa 206;0 So0ru- �1gz.n.✓n.- 4. License No. Tel. 39$ -Z21S 5. Name of Mason Address t 6. License No. Tel. 7. Construction address (dor- 9 8tr.r 15�'^l-- , ' Flood c�, Y9( %9)Done ct a 0,,, 8. Date of subdivision Approval �L-i/• // plain zone 9. Private dwelling Er Estimated Cost -WC' DO NOT WRITE IN THIS SPACE 3ti-T3d So, Type of room No. 10. Multi family 0 SZo,o ou 11. Commercial 0 isrrGy2 38.71 5/cKitchen / 12. Other 0 / St- Dining Rm. ,? r'44 �2� Living Rm. / 13. No. of stories 7-- �.- y/ 6 So3 • Bed Am. 14. Foundation - Full CrHalf 0 Crawl 0 Slab l' , 25 ' Bath l//z- /3 15. Materials - Wood El'Cement 0 Other 0 75%7S Deck 16. Type of heat - Oil CYGas 0 Electric 0 Other 0 AO 6S'011Closed porch 6 q..7o •74 Family Rm. 17. Garage - 1 ❑ 2 d op 1 si0o• Sun room 18. Swimming pool - Size •‘ r-' • • , • , • / b7'f Srf a 01" Garage 2 19. Storage shed - Size ---- ,tc.,._.--e----,: --;1:751/41- Shed 20. Stove - Wood 0 Coal 0 Alterations 21. Size of lot: No. of feet front ISS- No. of feet rear =-7-a11 No. of feet deep r Z-48 22. Size of building. No. of feet front SI" No. of feet side 4° No. of feet rear - iU° 23. Distance from nearest building: Front - Ft. side 2--600 Ft. side r Rear - 24:Distance back from line orstreet' ' afb c� . From rear lot line t. noFe- Side line 1:2-1- , 2-'9'- 25. H.LC.R. No. LOT RELEASED BY Signatur ."-i 'j sat-,A-ee-e-7 49/2,96;0 � PLANNING BOARD A•' °y-•ti' VA ' Date 0. �'" . RdcoRDBtsi . (P+- ? 7Zscorzv8a ? i x/93 b>-s ' ' BUILDING PERMIT APPLICATION SIGN OFF -7 • PtAtC.clh G. code- 3Sf - Ovtns APPLICANT: yamisJpJRre-11dl0),.v4 Ce. ' 3a. BUILDING PERMIT 1/: ADDRESS: D •vA hlo[Lt1S- v Sq'. Sc.tj. TELE: NO. : silt-7_Z9 3 DATE FILED: -41 dd7 BLDG. SITE LOCATION 9i 4,5711I- BLDG. I$(_/w9 2.0 MAP11: '/ Z- LOT#: t"B ^e IS THE FOLLOWING INFOR`1ATION OUTLINES THE PROCEDURAL STEPS REQUIRED TO OBTAIN A PERMIT TO-BUILD, . ALTER, OR ADD TO A STRUCTURE WITHIN THE TOWN OF YARMOUTH-THE BUILDING DEPARTMENT WILL DETER- MINE COMPLIANCE TO THE FOLLOWING (A) ZONING REQUIREMENTS (B) HISTORICAL DISTRICTS (C) FLOOD PLAINS ZONING. THE BUILDING DEPARTMENT WILL BE RESPONSIBLE FOR ASSISTING THE APPLICANT THOUGH THE FOLLOWING DEPARTMENTS: RESIDENTIAL AND/OR COMMERCIAL BUILDING WATER DEPARTMENT: DETERMINES COMPLIANCE OF WATER AVAILABILITY. ' ' ENGINEERING DEPARTMENT: DETERMINES COMPLIANCE FOR PARKING AND DRAINAGE. CONSERVATION COMMISSION: DETERMINES COMPLIANCE TO WETLANDS ACTS, I.E. : IF LOT(S) BORDER ANY TYPE OF WETLANDS, STREAMS, PONDS, RIVERS, OCEANS, BOGS, BAYS, MARSH LAND, ETC. '• HEALTH DEPARTMENT: DETERMINES COMPLIANCE TO STATE AND TOWN REGULATIONS, I.E. : REQUIRE- MENTS FOR SEPTAGE DISPOSAL AND OTHER PUBLIC HEALTH ACTIVITIES. FIRE DEPARTMENT: DETERMINES COMPLIANCE TO STATE AND TOWN REQUIREMENTS FOR PERSONAL SAFETY, PROPERTY PROTECTION, I.E., SMOKE DETECTORS, SPRINKLER SYSTEMS ETC. THE FOLLOWING DEPARTMENTS MUST SIGN OFF, IN THE RESPECTIVE ORDER, PRIOR TO BUILDING INSPECTOR ISSUING THE REQUIRED BUILDING PERMIT: REVIEWED BY: WATER DEPARTMENT (Well.. - C. DATE: le - � 0.-e N/A: 1,1%,ENGINEERING DEP ' INT: A.'11tIs. � , DATE: Io ti 13 6E SSLoW W I Faomati eN Le' CONSERVATION: - . ire DATE: - ��` N/A: 14. HEALTH DEPAR I • _..CIAO' DATE: /0 6-1`,,3 N/A: A)))\--INDUSTRIAL AND/OR COMMERCIAL PERMITS 5. WIRING INSPECTOR: DATE: N/A: 6. PLUMBING INSPECTOR: DATE: N/A: 7. FIRE DEPARTMENT: DATE: N/A: PLEASE NOTE ALL STUMPS AND/OR BRUSH MUST BE DISPOSED OF AT AN APPROVED SITE. A SIGNED RECEIPT FROM THE DISPOSAL SITE MUST BE SUBMITTED TO THE BUILDING DEPARTMENT PRIOR TO ISSUANCE OF THE BUILDING PERMIT. COMMENTS: w474:jz- - Mu'•c.1?A . OATS;R. iuor pv ti•ABLE AT 'Tills PR4pt/try. • tj[,DG %A%4 rr To 5' flO aztAzaritr S3/fiRS 7?) s„trx/ /t/shr. 4 Erg gri/N " /7/�N. 7W#fl) Oq9 hid N I S L?o J/n Pr, toe',s C c 1,11,0 Zicis r X1''4 T�77-LVL- PSL a c,,!,, S " 57ttsr s.0 Prit S I' S-xucr KA/va. ' N;N/.c fenirtirn-mriaa /IRp/ait 1UNrC.s ter kJ 'FAlor-SHotoN esGss Winnow 11t un A. r. r--n riy^Cins ti Eng CLv,za77ra, 5 Atf.+fn gnu, Aprmnva4 ATrT9r$• YIM'a IS rag rat/mpg-nag PERM It outs,/ SINCE ! 4l't (S' mein"' stet. Co AiSTRtTtt&t * APPROVED. 1ON�V BLM/89• �) F; ': .1,P', tl' • 1: ';$o ;�• o`:, TOWN OF YARMOUTH SOUTH YARH40UTH MASSACHUSETTS 02664 MAflACM � CC3 40"°"""' G BOARD OF HEALTH Malcolm G. Chase III Variance from Provisions of Title 5: 887 Great Island Rd. Regulation: West Yarmouth, MA Town Amendments: Section: 3.7 Re: Lot 91, 887 Great Island Rd. Date: October 19, 1993 Foundation Variance As Shown On Engineered Plans By: Schofield Brothers of N.E. , Inc. Dated: 9/23/93 Rev. 10/9/93 Dear Mr. Chase • The Yarmouth Board of Health has received your application for a Variance from the provisions of Regulation of Title 5 of the State Environmental Code and/or Section 3.7 of the Town of Yarmouth Amendments for Subsurface Disposal of Sewage. Having determined that strict enforcement of the above Regulations in this instance would do manifest injustice, and further, that your requested variance does not conflict with the spirit of the State Environmental Code or the Regulations of the Town of Yarmouth Amendments, the variance is hereby granted on this date October 19, 1993 , as follows: A variance is approved to allow the top of foundation to be set at elevation 22.33 which is 7.07 feet below the high point of the fronting road. High point of fronting road is at elevation 29.4. This is a total variance of 9.07 ft. from the required 2 ft. above the highpoint of the fronting road. • • You must provide a 3/4 inch negative grade for fifteen feet surrounding the foundation. You are hereby advised that the variance granted herein will expire in 90 days from date of issue unless all work authorized by said variance has been completed prior to the date of expiration. In granting this variance the Town of Yarmouth will not be responsible for any - water damage to the.foundation,, septic system or adjnining lots. a� *� ... < .•%l . r. • •' 1 I have read and fully understan-3 the ..y. conditions of th` above variance and Bruce Murphy, :;.P.H. accept them as written. Health Officer - Town of Yarmouth _ / � j ___ ate: t cc: = _dirg Department . 1 • BUILDING DEPART:ENT - - • • CONSTRUCTION SUPERVISOR FORM i . 1 I;LEASE PRINT: • • . . .. . . JOB LOCATION: �Lo q1 (?rut-r lSVtt 4 (a). 140noJf/- • NUMBER . STREET VILLAGE :• M,'� OWNER OF PROPERTY: ' (�, C , CA-Air .' • • • CONSTRUCTION SUPERVISOR: trr '� &vc..1' PoR•r •0I .be'O • 3,5-2.2213Poltf�J1 NAME V . •. LICENSE NO. PHON. NO. `aq -t��✓t� CO. • ADDRESS: 0 R- •tMkt� Yr: �rv-. • s ✓Alt_Pla, l- . it. • ' t, tS ' LICENSED DESIGNEE: . (IF OTHER THAN SUPERVISOR) . NATE LICENSE NO. • 2.15 RESPONSIBILITY OF EACH LICENSE HOLDER: ' 2.15.1 THE LICENSE HOLDER SHALL BE FULLY AND COMPLETELY RESPONSIBLE FOR ALL WORK FOR WHICH HE . IS SUPERVISING. HE ,SHALL BE RESPONSIBLE FOR SEEING THAT ALL WORK IS DONE PURSUANT TO Tr_. STATE BUILDING CODE AND THE DRAWINGS AS APPROVED BY THE BUILDING OFFICIAL 2.15.2 THE LICENSE HOLDER SHALL BE RESPONSIBLE TO SUPERVISE TEE CONSTRUCTION, RECONSTRUCTION, ALTERATION. REPAIR, R^:OVAL OR DEMOLITICN INVOLVING THE STRUCTURAL EIr.ENTS OF BUILDING AND STRUCTURES ONLY PURSUANT TO THE STATE BUILDING CODE AND ALL OTHER APPLICABLE LAWS OF THE CC:^_-!CNWEEAL:H, EVEN THOUGH HE, THE LICENSE HOLDER, IS NOT THE PERMIT HOLDER BUT ONLY A SUB- CONTRACTOR OR CONTRACTOR TO THE PERMIT HOLDER. • 2.15.3 THE LICENSEE HOLDER SHALL IMMEDIATELY NOTIFY THE BUILDING OFFICIAL IN WRITING OF THE DISCOVERY OF ANY VIOLATIONS WHICH ARE COVERED BY THE BUILDING PERMIT. 2.15.4 ANY LICENSEE WHO SHALL WILLFULLY VIOLATE SUBSECTIONS 2.15.1. 2.15.2 OR 2.15.3 OR ANY OTHER SECTION OF THESE RULES AND REGULATIONS AND ANY PROCEDURES, AS A:ENDED, SHALL BE SUBJECT TO REVOCATION OR SUSPENSION OF LICENSE BY THE BOARD. 2.16. ALL BUILDING PERMIT APPLICATIONS SHALL CONTAIN THE NAME. SIGNATURE AND LICENSE NUMBER Or T.:E CONSTRUCTION SUPERVISOR WHO IS TO SUPERVISE THOSE PERSONS ENGAGED IN CONSTRUCTION, RECON- STRUCTION, ALTERATION, REPAIR. RE:OVAL OF DE:.'OLITION AS REGULATED BY SECTION 109.1.: OF THE CODE AND THESE RULES AND REGULATIONS. IN THE EVENT THAT SUCH LICENSEE IS NO LONGER SUPERVISING SAID PERSONS, THE WORK SHALL L"_".EIA.=.Y CEASE UNTIL A SUC...z uR LICENSE HOLDER IS SUBSTITUTED ON THE RECORDS OF THE BUILDING DEPART'=1T. • I HAVE READ AND UNDERSTAND MY RESPONSIBILITIES UNDER TEE RULES AND REGULATIONS .FOR LICENSING CCN• STR UCTION SUPERVISORS IN ACCORDANCE WIT SECTION 109.1.1 OF TEE STATE BUILDING CODE. I UNNDERST:_:: THE CONSTRUCTION INSPECTION PROCEDURES AND THE SPECIFIC INSPECTION AS CALLED FOR BY THE BUILDING OFFICIAL. • . INSUAANCZ CCVEAAcE • I have a anent ' blity insurance policy or f.: substantial ecuivalent which meets the reG 1 Yes No Q q_irer..erts of ld ,i�C5.152 • If you have checked • es, a�: tndic:a the type coverage by checking the ap_eriate box. A liability insurance pcticy J • C:..er type of :.idemmty 0 Ecnd 0 CWNE:;'S INSURANCE WAIVER: I amthat the e deer _ . .. aware ccense_ ,• ,.. _ hae:••152 c Me Ce-e- L:ws an^ Ye cn : :::::::::::::n'y wee. c-:e.•oS :::Tem•et _ /� t'r.4. - .jhvc-✓Fbn.r� -es`_. ... wz es ;n:s rec_::er-_.._ TiWSteEr Jra�,v Cry . 'cx ,e: .._.ate .F c:Cony C..r.e'`•, :.Se : L51� _ S a:.nt SIGNATURE: BUILDING OFFICIAL APPROVAL: A -10- TOWN' OF YARMOUTH • BOARD OF HEALTH ADVISORY LETTER 025-A TO: COMMERCIAL/RESIDENTIAL BUILDERS DISPOSAL WORKS INSTALLERS FROM: BRUCE MURPHY, •HEALTH AGENT FORREST E. WHITE, BUILDING INSPECTOR DATE: MARCH 5, 1987 REF: DISPOSAL OF STUMPS & BRUSH FROM BUILDING SITES NOTE: THIS ADVISORY LETTER SUPERSEDES ADVISORY LETTER #25, DATED AUGUST 23, 1985 • ON NOVEMBER 18, 1986 THE BOARD OF SELECTMEN VOTED TO PROHIBIT ALL STUMPS AND BRUSHES LOADED BY MACHINE FROM BEING PUT INTO THE LANDFILL, EFFECTIVE JANUARY 1, 1987 PLEASE BE ADVISED THAT, AS OF THIS DATE, WHEN APPLYING FOR A BUILDING PERMIT THE APPLICANT MUST PRESENT AN AUTHORIZED STUMP/BRUSH DISPOSAL RECEIPT INDICATING WHEN ALL STUMPS AND BRUSH, CLEARED FROM THE LOT(S) , HAVE BEEN DISPOSED OF, AS IT IS NOT REQUIRED THAT ALL SUCH MATERIALS MUST BE DISPOSED OF IN ACCORDANCE TO REQUIREMENTS OF THE DEPARTMENT OF ENVIRONMENTAL QUALITY ENGINEERING (DEQE) , UNDER THE MASSACHUSETTS GENERAL LAWS: CHAPTER 111 - SECTION 150A. WITH REGARD TO DISPOSAL SITES, ALL SIGNED DISPOSAL RECEIPTS WILL BE FORWARDED TO THE HEALTH AGENTS OF EACH RESPECTIVE TOWN, AFTER THE ISSUANCE OF THE BUILDING PERMIT. AFTER ISSUANCE OF A FOUNDATION PERMIT, AND PRIOR TO OBTAINING A BUILDING PERMIT, THE SIGNED STUMP/BRUSH DISPOSAL RECEIPT, WHICH INDICATES THE SITE OF DISPOSAL, MUST BE SUBMITTED TO THE BUILDING INSPECTOR. IF THE APPLICANT DOES NOT HAVE A SIGNED RECEIPT INDICATING LOCATION OF DISPOSAL, NO BUILDING PERMIT WILL BE ISSUED. ANY QUESTIONS, RELATIVE TO THE AFOREMENTIONED, MAY BE DIRECTED TO EITHER THE BUILDING INSPECTOR OR THE HEALTH AGENT. **'k*******:******************************n:4'ti:('S..'****'*,':E*.f:k'['. k'A'*jf]t]EyE'.E:'*'fid****'. f*'A**:E******* :LAP:! Z PARCEL:✓ 'U' LOADS: DISPOSAL DATE(S) : CONSTRUCTION SITE: Lar Gla/ ISck-i R4+.4 Sr MoJiv-- PRIVATE DWELLING : ✓ MULTI-FAMILY: COMMERCIAL: OTHER: OWNER OF PROPERTY: Mhcca �1 . °wcsC aTELE: 4/1. - 2 G NAME OF CONTRACTOR l,AaieOPor r' 1,4..-Dias Co , TELE: CLEARING SITE: Ca- I � DISPOSAL SITE FOR STUMPS/BRUSH: SIGNATURE OF GATE ATTENDANT AT DISPOSAL SITE DATE: • 'WILLIAM KITE ARCHITECTS, INC. 1 Meeting Street, Providence, Rhode Island 02903 401 272-0240 LETTER OF TRANSMITTAL _y TM2-1012.93 Project Name: CHACE RESIDENCE - GREAT ISLAND Project No. : 9217 Date: October 12, 1993 To: Town of Yarmouth Building Department 1146 Route 28 Street South Yarmouth, MA 02664 Attn: Forrest E. White We are forwarding: Cgpies: Date: Description: 4 10. 12.93 Sets Construction Documents for Building Permit 4 10/12/93 Site Plan with Sewerage Disposal System, 1 9/16/93 Water Lab Test Conservation Order of Conditions 1 10/12/93 Building Permit Application 1 10/12/93 Sign-Off Sheet 1 10/08/93 Energy Code Specifications These are transmitted for: Building Permit • Remarks: Copy to: Chace Signed: Michael Viveiros WILLIAM KITE ARCHITECTS, INC. WILKINSON ASSOCIATES I N C CONSULTING ENGINEERS 1315 Jeff arson boulevard oats 7, werwlck.rtode Wend 02660 telephone 14013 737-6300 October 8, 1993 William Kite Architects, Ltd. 1 Meeting Street Providence, Rhode Island 02903 Attn: Mr. Michael Viveiros RECEIVED Project. Architect Re : The Chase Residence OCT 1 2 1993 West Yarmouth, Massachusetts • • WJIwn,A KITE ARCHITECTS. INC Dear Michael: Attached please find our energy audit calculation as prepared for the proposed Chase Residence, in West Yarmouth, Massachusetts. The findings of our analysis are summarized as follows: • Component R Values: Wall, Frame Construction R = 22.11 Wall, Stone Faced, Frame Construction R = 14.42 Roof, Pre-Fabricated Panel Construction R = 35.88 Roof, Conventional Framed Construction R = 31.21 Floor Above Ventilated Crawl Space/Basement R = 21.71 Fenestration, 5/8" Insulating Glass R = 3 .89 Fenestration, Glass Block R = 2.08 The residence, as proposed, has elevations which face more than the four directions that will fit into the standard form as provided. We have compiled a summary of R-Values with respect to the building's various elevations as a part of the attached analysis. Also included as a part of our attached analysis are computations of the R- Values for "gross" wall and roof assemblies. • Based upon our review of the construction details included as a part of the Town of Yarmouth work sheet, we find that the systems as proposed by your construction details exceed the minimum standards. ROBERT E.WILKINSON,JR.P.E. DONALD P.WILKINSON P.E. ROBERT STEVEN WILKINSSON P.E. • October 8, 1993 - Page 2. . • Attn: Mr. Michael Viveiros Project Architect Re : The Chase Residence West Yarmouth, Massachusetts • Should you have any questions with respect to the attached analysis, or with any of the information as outlined herein, please do not hesitate to call. • Yours very truly, WILKINSON ASSOCIATES I N C SIA4 • Robert Steven Wilkinson P. E. • 93079 Enclosure 'Computer ID: ACAD Log File Name: USAGE.LOG ENERGY AUDIT CALCULATION 10/07/93 Project: Chase Residence Status: Final City/State: W. Yarmouth, Ma. Prepared By: RSW Client: Wm. Kite Architects Project Number: 93079 FACTORS: Wall, Frame Construction: Element: R Value Outdoor Air 0.17 Cedar Shingles 1.19 Tyvek Infil Barrier. 0.00 1/2" Plywood Sheathing 0.62 ' 6" Fiberglass. Insulation „ 19.00 1/2" Gypsum Wall Board 0.45 Indoor Air 0.68 Total R Value: 22.11 Representative U Valve: 0.045 • Wall, Stone Faced, Frame Construction: Element: R Value Outdoor Air 0.17 4" Stone Facing 0.32 1" Air Space 1.18 Tyvek Infil Barrier 0.00 1/2" Plywood Sheathing 0.62 3-1/2" Fiberglass Insulation 11.00 1/.2" Gypsum Wall Board 0.45 Indoor Air 0.68 Total R Value: 14.42 RECEIVED Representative0. U Valve: 0.069 Wall, Masonry, @ Chimney Locations: OCT 1 2 1993 Element: R Value WILUAAAKITEARCHITECTS, INC. Outdoor Air 0.17 30" Stone 2.40 Indoor Air 0.68 WILKINSON ASSOCIATES INC PAGE : 1 E.NER-GY AUDIT CALCULATION 10/07/93 • Project: Chase Residence Status: Final City/State: W. Yarmouth, Ma. Prepared By: RSW Client: Win. Kite Architects Project Number: 93079 Total R Value: 3.25 Representative U Valve: 0.308 • Roof, Pre-Fabricated Panel Construction: Element: • R Value Outdoor Air 0.17 Cedar Shingles 1.19 Building Paper 0.06 Pre-Fabricated Insul Panel 33.40 1/2" Gypsum Wall Board 0.45 Indoor Air 0.61 Total R Value: 35.88 Representative U Valve: 0.028 Roof, Conventional Framed Construction: Element: R Value Outdoor Air 0.17 9" Fiberglass Insulation 30.00 1/2" Gypsum Wall Board 0.45 Indoor Air 0.61 Total R Value: 31.23 Representative U Valve: 0.032 Floor, Above Ventilated Basement/Crawl Space: Element: Outdoor Air 0.17 6" Fiberglass Insulation 19.00 3/4" Plywood Subfloor 0.94 3/4" Hardwood Floor 0.68 Indoor Air 0.92 WILKINSON ASSOCIATES INC PAGE : 2 ENERGY AUDIT CALCULATION 10/07/93 Project: Chase Residence Status: Final City/State: W. Yarmouth, Ma. Prepared By: . RSW Client: Wm. Kite Architects Project Number: 93079 Total R Value: 21.71 Representative U Valve: 0.046 , Fenestration, 5/8" Insulating Glass: a Total R Value: 1.89 Representative U Valve: 0.530 Fenestration, Glass Block: Total R Value: 2.08 Representative U Valve: 0.480 - Fenestration, Skylight: Total R Value: 2.08 Representative U Valve: 0.480 OVERALL "R-VALUE" COMPUTATION: FIRST FLOOR: North Elevation: Surface Area R-Value Product Wall, Frame Construction 249.00 22.11 5505.39'. . Wall, Stone Faced 34.50 14.42 497.49 Wall, Masonry 0.00 3.25 0.00 , Fenest. , Insul Glass 170.50 1.89 321.70 Fenest., Glass Block 0.00 2.08 0.00 , Total Surface Area: 454.00 Total Product (Area X R-Value) : 6324.58 NET EFFECTIVE R-VALUE, NORTH ELEVATION: 13.93 WILKINSON ASSOCIATES INC PAGE : 3 ENERGY AUDIT CALCULATION 10/07/93 Project: Chase Residence Status: Final City/State: W. Yarmouth, Ma. Prepared By: RSW Client: Wm. Kite Architects Project Number: 93079 South Elevation: Surface Area R-Value Product Wall, Frame Construction 65.00 22.11 1437.15 Wall, Stone Faced 27.00 14.42 389.34 Wall, Masonry 0.00 3.25 0.00 Fenest. , Insul•Glass 88.00 1.89 166.04 Fenest., Glass Block 0.00 2.08 0.00 Total Surface Area: 180.00 • Total Product (Area X R-Value) : 1992.53 NET EFFECTIVE R-VALUE, SOUTH ELEVATION: 11.07 East Elevation: Surface Area R-Value Product Wall, Frame Construction 93.75 22.11 2072.81 Wall, Stone Faced 34.50 14.42 497.49 J Wall, Masonry 0.00 3.25 0.00 Fenest. , Insul Glass 23.25 1.89 43.87 Fenest. , Glass Block 0.00 2.08 0.00 Total Surface Area: 151.50 Total Product (Area X R-Value) : 2614.17 NET EFFECTIVE R-VALUE, EAST ELEVATION: 17.26 West Elevation: Surface Area R-Value Product Wall, Frame Construction 81.50 22.11 1801.97 Wall, Stone Faced 34.50 14.42 497.49 Wall, Masonry 72.00 3.25 234.00 Fenest., Insul Glass 64.00 1.89 120.75 Fenest. , Glass Block • 0.00 2.08 0.00 Total Surface Area: 252.00 Total Product (Area X R-Value) : 2654.21 WILKINSON ASSOCIATES INC PAGE : 4 ENERGY AUDIT CALCULATION 10/07/93 Project: Chase Residence Status: Final City/State: W. Yarmouth, Ma. Prepared By: RSW Client: Wm. Kite Architects Project Number: 93079 NET EFFECTIVE R-VALUE, WEST ELEVATION: 10.53 Northeast Elevation: Surface Area R-Value Product Wall, Frame Construction 638.50 22.11 14117.24 Wall, Stone Faced 24.25 14.42 349.69 Wall, Masonry 0.00 3.25 0.00 Fenest. , Insul Glass 51.00 1.89 96.23 Fenest., Glass Block 29.75 2.08 61.98 Total Surface Area: 743.50 Total Product (Area X R-Value) : , 14625.13 NET EFFECTIVE R-VALUE, NORTHEAST ELEVATION: 19.67 Southeast Elevation: Surface Area R-Value Product Wall, Frame Construction 286.50 22.11 6334.52 Wall, Stone Faced 54.00 14.42 778.68 Wall, Masonry 56.00 3.25 182.00 Fenest. , Insul Glass 194.51 1.89 367.00 Fenest. , Glass Block 0.00 2.08 0.00 Total Surface Area: 591.01 Total Product (Area X R-Value) : 7662.20 NET EFFECTIVE R-VALUE, SOUTHEAST ELEVATION: 12.96 Northwest Elevation: Surface Area R-Value Product Wall, Frame Construction 367.37 22.11 8122.55 Wall, Stone Faced 24.25 14.42 349.69 Wall, Masonry 0.00 3.25 0.00 Fenest. , Insul Glass 436.00 1.89 822.64 Fenest. , Glass Block 29.75 2.08 61.98 WILKINSON ASSOCIATES INC PAGE : 5 ENERGY AUDIT CALCULATION 10/07/93 Project: Chase Residence Status: Final City/State: W. Yarmouth, Ma. Prepared By: RSW Client: Wm. Kite Architects Project Number: 93079 Total Surface Area: 857.37 Total Product (Area X R-Value) : ' 9356.86 NET EFFECTIVE R-VALUE, NORTHWEST ELEVATION: 10.91 Southwest Elevation: Surface Area . R-Value Product Wall, Frame Construction 255.75 22.11 5654.63 Wall, Stone Faced 54.00 14.42 778.68 Wall, Masonry 0.00 3.25 0.00 Fenest. , Insul Glass 450.75 1.89 850.47 Fenest. , Glass Block 0.00 2.08 0.00 • Total Surface Area: 760.50 Total Product (Area X R-Value) : 7283.78 NET EFFECTIVE R-VALUE, SOUTHWEST ELEVATION: 9.58 Roof: Surface Area R-Value Product Roof, Pre-Fab Panel Const. 1931.46 35.88 69300.78 Roof, Frame Const. 170.00 31.23 5309.10 Skylight 84.46 2.08 175.96 Total Surface Area: 2185.92 Total Product (Area X R-Value) : 74785.84 NET EFFECTIVE R-VALUE, ROOF: 34.21 Floor Above Unheated Crawl Space/Basement: Surface Area R-Value Product Floor 2941.25 21 .71 63854.54 Total Surface Area: 2941.25 Total Product (Area X R-Value) : 63,855 WILKINSON ASSOCIATES INC PAGE : 6 • ENERGY AUDIT CALCULATION 10/07/93 Project: Chase Residence Status: Final City/State: W. Yarmouth, Ma. Prepared By: RSW Client: Wm. Kite Architects Project Number: 93079 NET EFFECTIVE R-VALUE, FLOOR: 21.71 SECOND FLOOR: North Elevation: Surface Area R-Value Product Wall, Frame Construction 227.00 22.11 5018.97 Wall, Stone Faced 0.00 14.42 0.00 Wall, Masonry 0.00 3.25 0.00 Fenest. , Insul Glass 85.00 1.89 160.38 Fenest., Glass Block 0.00 2.08 0.00 Total Surface Area: 312.00 Total Product (Area X R-Value) : 5179.35 NET EFFECTIVE R-VALUE, NORTH ELEVATION: 16.60 South Elevation: Surface Area R-Value Product Wall, Frame Construction 192.00 22.11 4245.12 Wall, Stone Faced 0.00 14.42 0.00 Wall, Masonry 0.00 3.25 0.00 Fenest. , Insul Glass 144.00 1.89 271.70 Fenest. , Glass Block 0.00 2.08 0.00 Total Surface Area: 336.00 Total Product (Area X R-Value) : 4516.82 . NET EFFECTIVE R-VALUE, SOUTH ELEVATION: 13.44 East Elevation: Surface Area R-Value Product Wall, Frame Construction 149.00 22.11 3294.39 Wall, Stone Faced 0.00 14.42 0.00 WILKINSON ASSOCIATES INC PAGE : 7 . • ENERGY AUDIT CALCULATION 10/07/93 Project: Chase Residence Status: Final City/State: W. Yarmouth, Ma. Prepared By: RSW Client: Wm. Kite Architects Project Number: 93079 Wall, Masonry 0.00 3.25 0.00 Fenest., Insul Glass 35.00 1.89 66.04 Fenest. , Glass Block 0.00 - 2.08 0.00 Total Surface Area: 184.00 Total Product (Area X R-Value) : 3360.43 NET EFFECTIVE R-VALUE, EAST ELEVATION: 18.26 West Elevation: Surface Area R-Value Product Wall, Frame Construction 72.00 22.11 1591.92 Wall, Stone Faced 0.0014.42 0.00 Wall, Masonry 72.00 3.25 234.00 Fenest. , Insul Glass 20.00 1.89 37.74 Fenest. , Glass Block 0.00 2.08 0.00 Total Surface Area: 164.00 Total Product (Area X R-Value) : 1863.66 NET EFFECTIVE R-VALUE, WEST ELEVATION: 11.36 Northeast Elevation: Surface Area R-Value Product Wall, Frame Construction 111.00 22.11 2454.21 - Wall, Stone Faced 0.00 14.42 0.00 Wall, Masonry 0.00 3.25 0.00 Fenest. , Insul Glass 42.00 1.89 79.25 Fenest. , Glass Block 0.00 2.08 0:00 Total Surface Area: 153.00 , Total Product (Area X R-Value) : 2533.46 NET EFFECTIVE R-VALUE, NORTHEAST ELEVATION: 16.56 Southeast Elevation: Surface Area R-Value Product. WILKINSON ASSOCIATES INC PAGE : 8 • • ENERGY AUDIT CALCULATION 10/07/93 Project: Chase Residence Status: Final City/State: W. Yarmouth, Ma. Prepared By: RSW Client: Wm. Kite Architects Project Number: 93079 Wall, Frame Construction 79.00 22.11 1746.69 Wall, Stone Faced 0.00 14.42 0.00 Wall, Masonry 0.00 3.25 0.00 Fenest. , Insul Glass 42.00 1.89 79.25 Fenest. , Glass Block 0.00 2.08 0.00 Total Surface Area: 121.00 Total Product tArea X R-Value) : 1825.94 NET EFFECTIVE R-VALUE, SOUTHEAST ELEVATION: 15.09 Northwest Elevation: Surface Area .•R-Value Product Wall, Frame Construction 94.25 22.11 2083.87 Wall, Stone Faced 0.00 14.42 0.00 Wall, Masonry 0.00 3.25 0.00 Fenest. , Insul Glass 26.75 1.89 50.47 Fenest. , Glass Block 0.00 2.08 0.00 Total Surface Area: 121.00 Total Product (Area X R-Value) : 2134.34 NET EFFECTIVE R-VALUE, NORTHWEST ELEVATION: 17.64 Southwest Elevation: Surface Area R-Value Product Wall, Frame Construction 108.00 22.11 2387.88 Wall, Stone Faced 0.00 14.42 -0.00 Wall, Masonry. 0.00 3.25 0.00 Fenest., Insul Glass 0.00 1.89 0.00 Fenest. , Glass Block 0.00 2.08 0.00 Total Surface Area: 108.00 Total Product (Area X R-Value) : 2387.88 NET EFFECTIVE R-VALUE, SOUTHWEST ELEVATION: 22.11 WILKINSON ASSOCIATES INC PAGE : 9 • ' 0 • • ENERGY AUDIT CALCU LAT ION 10/07/93 Project: Chase Residence Status: Final City/State: W. Yarmouth, Ma. Prepared By: RSW Client: Wm. Kite Architects Project Number: 93079 Roof: Surface Area R-Value Product Roof, Pre-Fab Panel Const. 1937.42 35.88 69514.63 Roof, Frame Const. 0.00 31.23 0.00 Skylight 6.00 2.08 12.50 Total Surface Area: 1943.42 Total Product (Area X R-Value) : 69527.13 NET EFFECTIVE R-VALUE, ROOF: 35.78 OVERALL R-VALUE SUMMARY: Net Effective R-Values As Computed: Overall Wall: Total Area: 5488.88 Summed A X R Products: 76315.31 Net Effective R-Value: 13.90 Overall Roof: Total Area: 4129.34 Summed A X R Products: 144312.97 Net Effective R-Value: 34.95 Overall Floor: Total Area: 2941.25 Summed R-Values: 63854.54 Net Effective R-Value: 21.71 WILKINSON ASSOCIATES INC PAGE : 10 • • MEMO TO: Forrest White FROM: Engineering Department SUBJ: Building Permit Application for A.M.2-B15 DATE: September 13, 1993 • Upon completing an inspection of Great Island Road in front of this lot, it was determined that the road has not been constructed within the layout. It is our understanding that the road must be completed prior to issuance of a building permit. The construction of this portion of Great Island Road must be inspected and approved by the Engineering Department. JDK/pr x.c. : Robert Garcia Davenport Realty Doug Storrs OK FEW • SURVEYOR'S CERT I F I CAT I ON: /1.//3(13 ON THE BASIS OF MY KNOWLEDGE, INFORMATION AND 6EL EF, I CERTIFY TO MALCOLM 0. CHACE, III THAT AS A RESULT OF A LOCATION SURVEY PERFORMED ON THE GROUND ON DECEMBER 8, 1993 IN ACCORDANCE WITH THE NORMAL STANDARD OF CARE EXERCISED BY PROFESSIONAL LAND SURVEYORS PRACTICING IN THE COMMONWEALTH OF MASSACHUSETTS, I FIND THAT THE EXISTING POURED CONCRETE FOUNDATION IS SITUATED ON LOCUS AS DELINEATED HEREON. DATE:.,/2//0/9-3 ` a ��GlAk Plitt SSIONAL LAND SURVEYOR HIGH POINT a 29)/4 3r+oFcy OF ROAD cu, % GI • g�. .yam a mutant S 1. TOP OF FOUNDATION IS 5.6' BELOW HIGH ,a m"` " ,L06� re ' POINT OF ROAD. c •'�, • , 0 POURED �i �� CONCRETE - I FOUNDATION 1111111, k�?' TOP OF FOUNDATION ELEV. .23.81 ' 7.51 'A, 'S 42. I k0 CERTIFIED PLOT PLAN OF LAND IN W. YARMOUTH, MASS. AS PREPARED FOR NOTES: MALCOLM G. CHACE, III 1 . ZONING CLASSIFICATION: R-67. SCALE: lino. 60ft. DECEMBER 10, 1993 LOT DIMENSION REQUIREMENTS ARE AS DETAILED IN SECTION 402 OF THE ZONING BY-LAW FOR SCHOFIELD BROTHERS CLUSTER DEVELOPMENT. SEE BOARD OF APPEALS REGISTERED DECISION FOR PETITION NO. 2440. PROFESSIONAL ENGINEERS AND LAND SURVEYORS 2. ASSESSOR'S SHEET 2, PARCEL 91 . 161 ROUTE BA - P.O. BOX 101 3. OWNER OF RECORD: MALCOLM G. CHACE, III , ORLEANS, MASS. 02653 CERT. NO. 131475, L.C.PLAN 4075-N, LOT 91 . (508) 255-2098 0-8834 l 7/,79� �- 731 HOSPITAL TRUST BUILDING PROVIDENCE, R.I. 02903 401-421-0254 � 1 afPgilerr-LC' July 1, 1994 . g 1 7 Con) 33) Forrest E. White _ Town of Yarmouth Building Inspector Town Hall 1146 Route 28 South Yarmouth, MA 02664 Dear Mr. White: With respect to our new house located at 887 Great Island Road, West Yarmouth, Massachusetts, we hereby release the Town of Yarmouth and its employees, specifically the Town Building Department and its various employees, of any and all liability relating to said property. We recognize that a permanent occupancy permit has not been issued by the Town of Yarmouth and that the project's completion will commence on or after September 15, 1994. This letter of indemnification releasing the Town of • Yarmouth and its employees of any and all liabilities relating to our property is in effect as of the date hereof and extends to such time as an Occupancy Permit is issued by the Town. Thank you for your cooperation in helping us occupy our new home. Very truly yours, 400thlittlas Malcolm G. Chace, III • /cb