HomeMy WebLinkAboutBLD-15-1567 ovvit4 TOWN OF YARMOUTH Building Department BUILDING
Grp (508) 398-2231 ext.1261
p�" y PERMIT NO .BLD-15-001567 PERMIT
;;: JOB WEATHER CARD
5' ISSUE DATE :10/06/2014
APPLICANT :EDWARD T STAFFORD PERMIT TO Repair
AT(LOCATION) 110 SURFSIDE TERRACE, SOUTH YARMOUTH, M 1 ZONING DISTRICT IRS-40 1 Bldg.Type: ,Residential
SUBDIVISION MAP BLOCK LOT 051.68 BUILDING IS TO BE: CONST TYPE USE GROUP
REMARKS Roofing-5 sqs. Remove existing Siding-6 sqs. 508-922-1362 CONTRACTOR
LICENSE CS-046420
Construction Supervisor
EDWARD T STAFFORD
EDWARD STAFFORD
AREA(SQ FT) 31,798.80 EST COST($) 2000.00 PERMIT FEE($) [60.00 W YARMOUTH,MA 02673
OWNER GRIMES TOM
BUILDING DEPT BY
ADDRESS GRIMES TOM, 10 SURFSIDE TERRACE
SOUTH YARMOUTH ;MA 02673 PHONE
THIS PERMIT CONVEYS NO RIGHT TO OCCUPY ANY STREET, ALLEY OR SIDEWALK OR ANY PART THEREOF, EITHER TEMPORARILY
OR PERMANENTLY. ENCROACHMENTS ON PUBLIC PROPERTY, NOT SPECIFICALLY PERMITTED UNDER THE BUILDING CODE, MUST BE
APPROVED BY THE JURISDICTION. STREET OR ALLEY GRADES AS WELL AS DEPTH AND LOCATION OF PUBLIC SEWERS MAY BE
OBTAINED FROM THE DEPARTMENT OF PUBLIC WORKS. THE ISSUANCE OF THIS PERMIT DOES NOT RELEASE THE APPLICANT FROM
THE CONDITIONS OF ANY APPLICABLE SUBDIVISION RESTRICTIONS.
MINIMUM INSPECTIONS REQUIRED FOR ALL APPROVED PLANS MUST BE RETAINED ON WHERE APPLICABLE
CONSTRUCTION WORK: 1)FOUNDATIONS OR JOB AND THIS CARD KEPT POSTED UNTIL SEPARATE PERMITS ARE
FOOTINGS.2)PRIOR TO COVERING STRUCTURAL FINAL INSPECTION HAS BEEN MADE. REQUIRED FOR ELECTRICAL
W
MEMBERS(READY FOR LATH OR FINISH HERE A CERTIFICATE OF OCCUPANCY IS PLUMBING/GAS AND
COVERING)3)FINAL INSPECTION BEFORE REQUIRED,SUCH BUILDING SHALL NOT BE MECHANICAL INSTALLATIONS.
OCCUPIED UNTIL FINAL INSPECTION HAS
OCCUPANCY 4)REFER TO DETAILED INSPECTION BEEN MADE.
SCHEDULE
POST THIS CARD SO IT IS VISIBLE FROM STREET
BUILDING INSPECTIONS APPROVALS
OTHER:
WORK SHALL NOT PROCEED PERMIT WILL BECOME NULL AND VOID IF INPSECTIONS INDICATED ON THIS CARD
UNTIL THE INSPECTOR HAS CONSTRUCTION WORK IS NOT STARTED WITHIN CAN BE ARRANGED FOR BY TELEPHONE
APPROVED THE VARIOUS SIX MONTHS OF DATE THE PERMIT IS ISSUED AS OR WRITTEN NOTIFICATION.
STAGES OF CONSTRUCTION NOTED ABOVE.