Loading...
HomeMy WebLinkAboutEngineered Plan - 2018Locus Ex STING CONTOUR: ---- SEPTIC SYSTEM DESIGN SEPTIC SYSTEM SECTION POINSE IA DR PROPOSED CONTOUR: -----------•- O EXISTING SPOT ELEVATION: 25.5 FLOW ESTIMATE: FIRST FLOOR COVERS WITHIN 6" PROPOSED SPOT ELEVATION: 25.5 3 BEDROOMS AT 110 GAL / DAY = 330 GAL / DAY 105.07 OF FINISHED GRADE G� TEST HOLE: TOP OF / UTILITY POLE: -O SEPTIC TANK: r ` FINISHED GRADI C Y tijgS FENCE LINE: ° FOUNDATION `�"`�y�� - , q T HYDRANT: 330 GAL / DAY x 2 DAYS = 660 GAL T MAX. RETAINING WALL: o USE 1500 GALLON SEPTIC TANK 101.07 1/8" per ft COVER G (1' MIN) 411 N ELEV. Q 100.55 1/8" per ft. RS pqT LEACHING AREA: 25.0' (EXISTING) ELEV. 4 USE 2 - 500 GALLON CHAMBERS 8.5' x 4.8' x T EFF. DEPTH WITH 100.8 100.22 100.05 LOCATION MAP ( ) ELEV. ELEV. D-BOX ELEV. LOT 50 (15,271 SF) (6" OF STONE UNDER OR 4' OF STONE ALL AROUND (25' x 12.8' x 2' DEEP) 1000 GAL MECHANICALLY COMPACTED) ASSESSORS MAP: 89 PARCEL: 44 c� SEPTIC TANK PLAN BOOK: 280, PAGE: 52 SIDE AREA: (25' + 12.8') x 2 x 2 = 151 SF (0.74) = 112 GAUDAY BOTTOM AREA: 25' x 12.8' = 320 SF TEE SIZES: . 1 BE CONFIRMED) 99.92 (0.74) = 237 GAUDAY INLET: 6" UP, 13" DOWN ELEV. LEACH AREA DETAIL CAPACITY = 349 GAL/DAY OUTLET: 6" UP, 14" DOWN GAS BAFFLE AT OUTLET TEE i i 102 / / W SUN ROOM bh BENCHMARK AT BED BATH KITCHEN LEFT CORNER ROOM OF BULKHEAD BATH DINING ELEVATION = 104.07 ROOM BED FED LIVING ROOMOOM ROOM 103 103 s :� : 0 existing gallon �� FCg is, •' { ST sepstank °f ds wO0 f. I (no \\ I G th-1 I p, foundation) \ I \ I bhC \ I invert = 101.07 I I t I I f 01 I I o%STING 3 BIEDROOM 1\ I 104 I 102 DWELLING j top fn=105.07 I 103 d GARAGE I I GARAGE EXISTING FLOOR PLAN 13 P MP-MAIV Z, I D N me Date 101 �h' 1 II STONE - PAVED ! 100/ Q- I DRIVE DRIVE A o 102 _ _ / 101 / \ / �- P 43/•OZ' / HEALTH DEPT. M18-37 TEST HOLE LOGS ENGINEER: THOMAS MCLELLAN, P.E. WITNESS: AMY VON HONE, R.S. DATE: 6-28-18 PERCOLATION RATE: < 2 MIN/IN PEASTONE OR FILTER FABRIC 3/4" - 1 1/2" DOUBLE WASHED STONE INSPECTION PORT ELEV= 100.75 tsl1 ° ° I'IJ 97.92 <-4-j 4 ELEV. 25' x 12.8' 2 - 500 GALLON CHAMBERS WITH 4' OF STONE ALL AROUND (25' x 12.8' x 2' DEEP) TH-1 103.0 ELEV V, FILL A/E HORIZON LOAMY SAND 12" 10YR 3/3 102.0 B HORIZON LOAMY SAND 30" 10YR 6/8 100.5 C HORIZON MED-FINE SAND 2.5Y 7/4 PERC AT 48" 138" 91.5 NO GROUND WATER ENCOUNTERED NOTES: 1. VERTICAL DATUM: ASSUMED 2. MUNICAPAL WATER IS AVAILABLE. �3. SCHEDULE 40 - 4" PVC PIPE TO BE USED THROUGHOUT SEPTIC SYSTEM. . 4. ALL PRECAST UNITS SUBJECT TO TRAFFIC LOADS TO CONFORM WITH AASHTO H-20 SPECIFICATIONS. 5. PIPE PITCH = 1/8" & 1/4" PER FOOT (UNLESS NOTED OTHERWISE). 6. FIRST 2' OF PIPE OUT OF D-BOX TO BE SET LEVEL. 7. THE SEPTIC SZ6STEM HAS NOT BEEN DESIGNED TO ACCOMODATE THE USE OF A GARBAGE DISPOSAL. 8. ALL CONSTRUCTION DETAILS ARE TO BE IN CONFORMANCE WITH THE STATE OF MASS. ENVIRONMENTAL CODE (TITLE FIVE) AND LOCAL HEALTH REGULATIONS. 9. CONTRACTOR TO VERIFY LOCATIONS OF ALL UTILITIES PRIOR TO CONSTRUCTION. 10. GROUND COVER OVER ALL SEPTIC SYSTEM COMPONENTS NOT TO EXCEED 3' WITHOUT VARIANCE. 11. FIELD SURVEY PROVIDED BY TERRY A. WARNER, P.L.S., HARWICH, MA. 12. THIS PLAN REQUIRES THE REVIEW AND APPROVAL OF ONE OR MORE TOWN DEPARTMENTS AND IS SUBJECT TO CHANGE UNTIL SUCH TIME. THIS PLAN HAS BEEN PREPARED FOR THE SOLE PURPOSE OF CONSTRUCTION OF A NEW SEPTIC SYSTEM AND DOES NOT NECESSARILY REPRESENT A FULL DETAILED PROPERTY SURVEY. 13. EXISTING LEACH PIT IS TO BE PUMPED AND FILLED WITH SAND OR REMOVED. R, E C E 'E D 14. D-BOX TO BE WATER TESTED TO ENSURE LEVELNESS AND EQUAL FLOW. AUG' 14 20 ¢8 HEALTH DEPT. SITE PLAN I LOCATION: 3 SLEIGHBELL LANE, S. YARMOUTH, MA PREPARED FOR: GLEN IRVINE DATE: 6-29-18 SCALE: 1" = 20' c BASS RIVER ENGINEERING THOMAS J. McLE L� AN, P.E. P.O. BOX 1163, EAST DENNIS, MA 02641 508-364-9048