Loading...
HomeMy WebLinkAbout83-1919 - COC requestDEPARTMENT O� YAR OF `rO CONSERVATION r r r r evdq"&4 ew"t"," All filings must be made on Town of Yarmouth forms. All applications must be submitted two weeks prior to the next scheduled Conservation Commission meeting. Refer to Meeting Schedule Failure to follow the Administrative Checklist guidelines shall result in an Administrative Incomplete Application and will not be advertised for a Public Hearing. Contact the office if you need assistance. We will be happy to help guide you through the process. Subatiffjy# an tkatian: 1 original application with original signatures 1 pdf of application, plan/sketch, and other supporting information emailed to kk-rant(t(9a�yarmouth.ma.us Statement from Engineer or stamped As -Built plan, refer to 310 CMR 10.05(9)(d) Local filing fee — Refer to fee schedule, Check payable to "Town of Yarmouth" Yarmouth Conservation Commission • 1146 Route 28 • South Yarmouth, MA 02664-4492 Tel. (508)-398-2231 Ext. 1288 • Fax (508)-398-0836 • TTD# (508) 398-2231 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands L) i WPA Form 8A — Request for Certificate of Compliance Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Town of Yarmouth Wetland By-law, Chapter 143 A. Project Information Important: When filling out 1. This request is being made by: forms on the Nancy Douttiel & Diane Willcox computer, use Name only the tab kto 20 Turtle Cove Road ey move your cursor - Mailing Address do not use the South Yarmouth . MA return key. City/Town State Phone Number 2. This request is in reference to work regulated by a final Order of Conditions issued to Nancy Douttiel & Nancy Willcox Applicant 3/28/12 SE83-1919 Dated DEP File Number Upon completion of the work 3 authorized in an Order of Conditions, the property owner must request a Certificate of 4 Compliance from the issuing authority stating that the work or portion of the work has been satisfactorily completed. The project site is located at: 20 Turtle Cove Road Street Address 59 Assessors Map/Plat Number South Yarmouth City/Town 117 Parcel/Lot Number The final Order of Conditions was recorded at the Registry of Deeds for: DEP File Number: s�.,;�3 t4t9 IVVI 4y ✓LI 02664 Zip Code Property Owner (if different) Barnstable 26267 271 County Book Page Certificate (if registered land) 5. This request is for certification that (check one): ® the work regulated by the above -referenced Order of Conditions has been satisfactorily completed. ❑ the following portions of the work regulated by the above -referenced Order of Conditions have been satisfactorily completed (use additional paper if necessary). ❑ the above -referenced Order of Conditions has lapsed and is therefore no longer valid, and the work regulated by it was never started. wpaformSa.doc -- rev. 5/29/14 Page 1 of 2 ILIMassachusetts Department of Environmental Protection DEP File Number: Bureau of Resource Protection - Wetlands WPA Form 8A — Request for Certificate of Compliance se $3- 14i Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP Town of Yarmouth Wetland By-law, Chapter 143 A. Project Information (cont.) 6. Did the Order of Conditions for this project, or the portion of the project subject to this request, contain an approval of any plans stamped by a registered professional engineer, architect, landscape architect, or land surveyor? ® Yes If yes, attach a written statement by such a professional certifying substantial compliance with the plans and describing what deviation, if any, exists from the plans approved in the Order. ❑ No B. Submittal Requirements Requests for Certificates of Compliance should be directed to the issuing authority that issued the final Order of Conditions (OOC). If the project received an OOC from the Conservation Commission, submit this request to that Commission. If the project was issued a Superseding Order of Conditions or was the subject of an Adjudicatory Hearing Final Decision, submit this request to the appropriate DEP Regional Office (see http://www.mass.qov/eea/agencies/massder)/about/contacts/find-the-massdep-regional-office- for-you r -city -or -town. htm I). wpaform8a.doc -- rev. 5/29/14 Page 2 of 2 939 main street rt 6a yarmouth port mass 02675 land court surveys structural design site planning sewage system designs inspections permits down cape engineering, inc civil engineers & land surveyors September 19, 2018 Yarmouth Conservation Commission 1146 Route 28 South Yarmouth, MA 02664 Re: Request for Certificate of Compliance SE 83-1919 (20 Turtle Cove Road, South Yarmouth) Dear Commission Members: On 3/28/12, the Commission issued an Order of Conditions for proposed work at the above -referenced site. tel. (508) 362-4541 fax(508)362-9880 Daniel A. Ojala, P.E., P.L.S. Arne H. Ojala, P.E., P.L.S. Daniel E. Gonsalves, E.I.T., S.E. Craig J. Ferrari, E.I.T., S.E. A site visit was made for the purpose of closing out the Order of Conditions. Photographs are enclosed for review, as well as an as -built site plan. This is to certify, to the best of my knowledge and belief, that the work was performed in substantial compliance with the approved plan and Order of Conditions. We hereby request the issuance of a Certificate of Compliance at this time. Thank you for your consideration. Very truly yours, Daniel A. Ojala, PE, PLS Down Cape Engineering, Inc. cc: Nancy Douttiel & Nancy Willcox encl. tA 119.1 c "St i c Y - _ .y � Irl•. - J X. A- ,ti,/��-l�fr�� ` . r � _� - elm.''.` r=i�J ` r•�• ��;�•.'� _, e� - t r �� � �' _ f ��, ', # ':_ ' .�.• `_ 1L. ,-..,'1�-:` '3 =.1 Y�+`''` tib• '^�I -i ,�� _'St � �R;.. �t�;�f` `, :- fin° �r`;��1►,��- ,i ti• ` jr- 51- : _ z 0 L) Z Z_ LU LU Z 0 3 cD CD Z 0 LU 2 CD W U) CL 0 C) Lo 0 0 a) > 0 :0) cl E 00) C:) ca,)) >- w I LL 0 M I a) �– W U) MIN